3220 W FLORENCE AVE 90043

Certificate Information: 3220 W FLORENCE AVE 90043

Application / Permit
24016-10000-12176
Plan Check / Job No.
B24LA06726
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(11) Hotel
Work Description
Eplan Soft-Story seismic retrofit per LABC Chapter 93: Install Simpson Shear Panel Walls to existing Hotel/Motel building
Permit Issued
Issued on 11/13/2024
Issuing Office
Current Status
Issued on 11/13/2024

Permit Application Status History

Submitted 4/12/2024 APPLICANT
Assigned to Plan Check Engineer 4/18/2024 HANS SANTIAGO
Corrections Issued 4/22/2024 HANS SANTIAGO
Quality Review Completed 4/25/2024 CHARLES CHANG
Applicant returned to address corrections 6/30/2024 HANS SANTIAGO
Applicant returned to address corrections 9/12/2024 HANS SANTIAGO
Plan Check Approved 10/18/2024 ANDREW SANTIAGO
Issued 11/13/2024 APPLICANT

Permit Application Clearance Information

Specific Plan Cleared 7/5/2024 DANIEL CORONADO
Historic Resource Verification Cleared 7/8/2024 ELIZABETH GALLARDO
Redevelopment Project Area Cleared 7/8/2024 ELIZABETH GALLARDO
DAS Clearance Cleared 10/9/2024 Hans Santiago

Contact Information

Contractor Bravo Zulu Construction Inc; Lic. No.: 1098211-B       ,
Engineer Schaefer,, Jeffrey; Lic. No.: NA91734       ,

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 3/10/2025 Approved ALFREDO LOPEZ
Deputy Drilled-In Anchors 3/25/2025 Approved DARRYL ARNOLD
Wood Frame 3/25/2025 Conditional Approval DARRYL ARNOLD
Interior/Exterior Lathing 4/2/2025 Approved DARRYL ARNOLD
Final 4/17/2025 Not Ready for Inspection DARRYL ARNOLD
SGSOV-Seismic Gas S/O Valve 4/17/2025 SGSOV Not Ready DARRYL ARNOLD
Smoke Detectors 4/17/2025 Conditional Approval DARRYL ARNOLD
Final 5/6/2025 Not Ready for Inspection DARRYL ARNOLD
SGSOV-Seismic Gas S/O Valve 5/6/2025 SGSOV Not Ready DARRYL ARNOLD
Smoke Detectors 5/6/2025 Approved DARRYL ARNOLD
Final 10/17/2025 Corrections Issued DARRYL ARNOLD
SGSOV-Seismic Gas S/O Valve 10/17/2025 SGSOV Not Ready DARRYL ARNOLD
Final 1/29/2026 Conditional Approval ALFREDO LOPEZ
SGSOV-Seismic Gas S/O Valve 1/29/2026 SGSOV Approved ALFREDO LOPEZ