3257 N BETTY DR 90032

Certificate Information: 3257 N BETTY DR 90032

Application / Permit
24016-10000-10644
Plan Check / Job No.
B24LA05759
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Eplan: Remodel to (E) 1-Story SFD, Remodel to Include Conversion of Kitchen to Bedroom and Laudry Room to Bathroom, Installation of New AC Unit, Insulation, Repiping and Rewiring. All Work Done per WFPP
Permit Issued
Issued on 5/7/2024
Issuing Office
Current Status
Permit Finaled on 9/9/2024

Permit Application Status History

Submitted 4/1/2024 APPLICANT
Assigned to Plan Check Engineer 4/3/2024 DAVID CASTILLO
Corrections Issued 4/4/2024 DAVID CASTILLO
Plan Check Approved 5/6/2024 EDWIN ESPIN
Issued 5/7/2024 APPLICANT
Permit Finaled 9/6/2024 LILIANA PORTILLO

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Bpc Development Inc; Lic. No.: 1059885-B       ,
Contractor Builder Point Construction; Lic. No.: 1059885-B       ,

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

ELECTRICAL-Rough 5/10/2024 Approved ALIZAH MAYAGOITIA
Gas Test 5/10/2024 Partial Approval ALIZAH MAYAGOITIA
HVAC-Rough 5/10/2024 Corrections Issued ALIZAH MAYAGOITIA
Interior/Exterior Lathing 5/10/2024 Partial Approval ALIZAH MAYAGOITIA
PLUMBING-Rough 5/10/2024 Approved ALIZAH MAYAGOITIA
Wood Frame 5/10/2024 Approved ALIZAH MAYAGOITIA
HVAC-Rough 5/16/2024 Approved LILIANA PORTILLO
Insulation 5/16/2024 Approved LILIANA PORTILLO
Drywall Nailing 5/20/2024 Approved LILIANA PORTILLO
Interior/Exterior Lathing 6/4/2024 Approved LILIANA PORTILLO
Shower Pan 6/4/2024 Approved LILIANA PORTILLO
Final 8/29/2024 Corrections Issued LILIANA PORTILLO
SGSOV-Seismic Gas S/O Valve 8/29/2024 SGSOV Not Ready LILIANA PORTILLO
Smoke Detectors 8/29/2024 Approved LILIANA PORTILLO
ELECTRICAL-Final 9/6/2024 Approved LILIANA PORTILLO
Final 9/6/2024 Permit Finaled LILIANA PORTILLO
HVAC-Final 9/6/2024 Approved LILIANA PORTILLO
PLUMBING-Final 9/6/2024 Approved LILIANA PORTILLO
SGSOV-Seismic Gas S/O Valve 9/6/2024 SGSOV Approved LILIANA PORTILLO