258 E WAYLAND ST 90042

Certificate Information: 258 E WAYLAND ST 90042

Application / Permit
24016-10000-09727
Plan Check / Job No.
B24LA05172
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
CONVERT EXISTING DETACHED GARAGE INTO ACCESSORY DWELLING UNIT PER GCS65852.2(e)(1)(A) - PER ENGINEER *Existing construction that does not pose a threat to the publics health and safety was allowed per Government Code Section 55.852.2(d)(2)
Permit Issued
Issued on 1/22/2025
Issuing Office
Current Status
CofO Issued on 12/9/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 3/22/2024 APPLICANT
Assigned to Plan Check Engineer 3/29/2024 DANIEL ABRAMYAN
Corrections Issued 3/29/2024 DANIEL ABRAMYAN
Plan Check Approved 1/22/2025 DANIEL ABRAMYAN
Issued 1/22/2025 APPLICANT
CofO in Progress 12/9/2025 LILIANA PORTILLO
Permit Finaled 12/9/2025 DEROLD HAUFF
CofO Issued 12/9/2025 DEROLD HAUFF
Permit Finaled 12/9/2025 DEROLD HAUFF

Permit Application Clearance Information

HPOZ Cleared 4/25/2024 NATHALY DE LA PAZ
Construction near power lines Cleared 8/4/2024 RIDWAN HARDY
Address approval Cleared 9/27/2024 DAVID VO
Sewer availability Cleared 9/27/2024 DAVID VO
Grading Pre-Inspection Cleared 12/23/2024 MICHAEL TEMPLE
CPC Cleared 12/24/2024 RUBEN VASQUEZ
Eng Process Fee Ord 176,300 Cleared 12/24/2024 DAVID VO

Contact Information

Contractor L A Builder Construction Inc; Lic. No.: 933468-B       ,
Engineer Christiansen,, Scott; Lic. No.: NA37989       ,

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 2/21/2025 Conditional Approval LILIANA PORTILLO
Footing/Foundation/Slab 2/27/2025 Corrections Issued LILIANA PORTILLO
BUILDING-Rough-Frame 3/27/2025 Not Ready for Inspection LILIANA PORTILLO
ELECTRICAL-Rough 3/27/2025 Corrections Issued LILIANA PORTILLO
PLUMBING-Rough 3/27/2025 Corrections Issued LILIANA PORTILLO
Sewer 3/27/2025 Approved LILIANA PORTILLO
Underground Mechanical 3/27/2025 Partial Approval LILIANA PORTILLO
Wood Frame 3/27/2025 Not Ready for Inspection LILIANA PORTILLO
Floor/Roof Diaphrgm/Shear Wall 5/2/2025 Approved LILIANA PORTILLO
PLUMBING-Rough 5/2/2025 Approved LILIANA PORTILLO
BUILDING-Rough-Frame 5/6/2025 Conditional Approval LILIANA PORTILLO
ELECTRICAL-Rough 5/6/2025 Approved LILIANA PORTILLO
HVAC-Rough 5/6/2025 Corrections Issued LILIANA PORTILLO
Interior/Exterior Lathing 5/6/2025 Partial Approval LILIANA PORTILLO
BUILDING-Rough-Frame 5/16/2025 Approved LILIANA PORTILLO
Green Building Rough 5/16/2025 Approved LILIANA PORTILLO
HVAC-Rough 5/16/2025 Approved LILIANA PORTILLO
Insulation 5/16/2025 Approved LILIANA PORTILLO
Floor/Roof Diaphrgm/Shear Wall 5/22/2025 Approved LILIANA PORTILLO
Drywall Nailing 5/30/2025 Approved REGINA MENDEZ
Interior/Exterior Lathing 5/30/2025 Approved REGINA MENDEZ
Shower Pan 5/30/2025 Approved REGINA MENDEZ
Interior/Exterior Lathing 6/2/2025 Approved LILIANA PORTILLO
Shower Pan 6/2/2025 Approved LILIANA PORTILLO
Final 10/10/2025 Corrections Issued LILIANA PORTILLO
Green Building Final 10/10/2025 Not Ready for Inspection LILIANA PORTILLO
SGSOV-Seismic Gas S/O Valve 10/10/2025 SGSOV Not Ready LILIANA PORTILLO
Smoke Detectors 10/10/2025 Approved LILIANA PORTILLO
Final 10/24/2025 Not Ready for Inspection LILIANA PORTILLO
Green Building Final 11/17/2025 Approved LILIANA PORTILLO
SGSOV-Seismic Gas S/O Valve 11/17/2025 SGSOV No Gas LILIANA PORTILLO
ELECTRICAL-Final 12/8/2025 Approved LILIANA PORTILLO
Final 12/8/2025 OK to Issue CofO LILIANA PORTILLO
HVAC-Final 12/8/2025 Approved LILIANA PORTILLO
PLUMBING-Final 12/8/2025 Approved LILIANA PORTILLO