2380 N VENUS DR 90046
Certificate Information: 2380 N VENUS DR 90046
- Application / Permit
- 24016-10000-08307
- Plan Check / Job No.
- X24LA02761
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- Replace drywall (no new walls added) for single family dwellings and duplexes only. Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing ___100___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0(b) 2B. (1) Kitchen / (5) Bathroom remodel for residential buildings (no structural changes). MEP's included. "COMPLY WITH DEPARTMENT ORDER effective date 02/20/2024. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE".
- Permit Issued
- Issued on 3/11/2024
- Issuing Office
- Metro
- Current Status
- Issued on 3/11/2024
Permit Application Status History
| Issued | 3/11/2024 | APPLICANT |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | H&E Builders Services Inc; Lic. No.: 1032180-B | 1440 KWIS AVE HACIENDA HEIGHTS, CA 91745 |
Inspector Information
| No Data Available. |
Pending Inspections
| No Data Available. |
Inspection Request History
| BUILDING-Rough-Frame | 6/25/2024 | Approved | PTOLEMY HILL |
| ELECTRICAL-Rough | 6/25/2024 | Approved | PTOLEMY HILL |
| Gas Test | 6/25/2024 | Approved | PTOLEMY HILL |
| HVAC-Rough | 6/25/2024 | Approved | PTOLEMY HILL |
| PLUMBING-Rough | 6/25/2024 | Approved | PTOLEMY HILL |
| Insulation | 7/18/2024 | Approved | PTOLEMY HILL |
| Interior/Exterior Lathing | 7/18/2024 | Approved | PTOLEMY HILL |
| Shower Pan | 7/18/2024 | Approved | PTOLEMY HILL |
| Drywall Nailing | 8/8/2024 | Approved | PTOLEMY HILL |
| Drywall Nailing | 8/15/2024 | Approved | JOEL ORDAZ |
| ELECTRICAL-Final | 6/5/2025 | Approved | JOEL ORDAZ |
| Final | 6/5/2025 | Approved | JOEL ORDAZ |
| HVAC-Final | 6/5/2025 | Approved | JOEL ORDAZ |
| PLUMBING-Final | 6/5/2025 | Approved | JOEL ORDAZ |
| SGSOV-Seismic Gas S/O Valve | 6/5/2025 | Approved | JOEL ORDAZ |
| Service/Power Release | 6/5/2025 | Approved | JOEL ORDAZ |
| Smoke Detectors | 6/5/2025 | Approved | JOEL ORDAZ |