1823 N DITMAN AVE 90032

Certificate Information: 1823 N DITMAN AVE 90032

Application / Permit
24016-10000-07429
Plan Check / Job No.
B24LA03883
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Remodel of existing 1-story single family dwelling. All work done per an engineered design.
Permit Issued
Issued on 3/7/2024
Issuing Office
Metro
Current Status
Permit Finaled on 10/11/2024

Permit Application Status History

Submitted 3/4/2024 APPLICANT
Assigned to Plan Check Engineer 3/4/2024 DANIEL SMILEY
Corrections Issued 3/4/2024 DANIEL SMILEY
Issued 3/7/2024 APPLICANT
Permit Finaled 10/10/2024 LILIANA PORTILLO

Permit Application Clearance Information

Grading Pre-Inspection Cleared 3/4/2024 CHARLES POWELL

Contact Information

Contractor De La Rosa Construction; Lic. No.: 855010-B 3627 E FIRST STREET      LOS ANGELES, CA 90063
Engineer Dominguez,, Refugio; Lic. No.: C50820 254 COTTONWOOD ST      ONTARIO, CA 91761

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

BUILDING-Rough-Frame 5/14/2024 Corrections Issued JOSEPH MCGARRY
ELECTRICAL-Rough 5/14/2024 Corrections Issued JOSEPH MCGARRY
HVAC-Rough 5/14/2024 Corrections Issued JOSEPH MCGARRY
PLUMBING-Rough 5/14/2024 Corrections Issued JOSEPH MCGARRY
BUILDING-Rough-Frame 5/28/2024 Not Ready for Inspection LILIANA PORTILLO
ELECTRICAL-Rough 5/28/2024 Approved LILIANA PORTILLO
Footing/Foundation/Slab 5/28/2024 Approved LILIANA PORTILLO
HVAC-Rough 5/28/2024 Approved LILIANA PORTILLO
PLUMBING-Rough 5/28/2024 Not Ready for Inspection LILIANA PORTILLO
BUILDING-Rough-Frame 5/30/2024 Approved LILIANA PORTILLO
Insulation 5/30/2024 Approved LILIANA PORTILLO
PLUMBING-Rough 5/30/2024 Approved LILIANA PORTILLO
Drywall Nailing 6/11/2024 Approved LILIANA PORTILLO
Interior/Exterior Lathing 6/11/2024 Partial Approval LILIANA PORTILLO
Interior/Exterior Lathing 7/3/2024 Approved JOSEPH MCGARRY
Shower Pan 7/3/2024 Approved JOSEPH MCGARRY
ELECTRICAL-Final 10/3/2024 Not Ready for Inspection LILIANA PORTILLO
Final 10/3/2024 Corrections Issued LILIANA PORTILLO
HVAC-Final 10/3/2024 Not Ready for Inspection LILIANA PORTILLO
PLUMBING-Final 10/3/2024 Not Ready for Inspection LILIANA PORTILLO
SGSOV-Seismic Gas S/O Valve 10/3/2024 SGSOV Not Ready LILIANA PORTILLO
Smoke Detectors 10/3/2024 Approved LILIANA PORTILLO
ELECTRICAL-Final 10/10/2024 Approved LILIANA PORTILLO
Final 10/10/2024 Permit Finaled LILIANA PORTILLO
HVAC-Final 10/10/2024 Approved LILIANA PORTILLO
PLUMBING-Final 10/10/2024 Approved LILIANA PORTILLO
SGSOV-Seismic Gas S/O Valve 10/10/2024 SGSOV Approved LILIANA PORTILLO