3509 2/3 N GRIFFIN AVE 90031

Certificate Information: 3509 2/3 N GRIFFIN AVE 90031

Application / Permit
24016-10000-05197
Plan Check / Job No.
B24LA02910
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
CONVERT (E) DETACHED GARAGE TO ACCESSORY DWELLING UNIT PER GCS 65852.2(e)(1)(D) and (g) LAMC 12.22 A.33(c), (d), and (g). WORK PER ENGINEERED DESIGN.
Permit Issued
Issued on 5/29/2024
Issuing Office
Current Status
CofO Issued on 1/28/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 2/16/2024 APPLICANT
Assigned to Plan Check Engineer 2/22/2024 OMAR GARNICA
Corrections Issued 2/23/2024 OMAR GARNICA
Applicant returned to address corrections 5/2/2024 SERGIO MUNIZ
Plan Check Approved 5/20/2024 SERGIO MUNIZ
Issued 5/29/2024 APPLICANT
CofO in Progress 1/24/2025 LILIANA PORTILLO
Permit Finaled 1/28/2025 DEROLD HAUFF
CofO Issued 1/28/2025 DEROLD HAUFF
Permit Finaled 1/28/2025 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 3/9/2024 KEVIN AVILA
HPOZ Cleared 3/26/2024 MICAELA TORRES-GIL
Hydrant and Access approval Cleared 4/12/2024 RUEL COLE
Eng Process Fee Ord 176,300 Cleared 5/3/2024 KEVIN AVILA
Sewer availability Cleared 5/3/2024 KEVIN AVILA
"Q" conditions Cleared 5/16/2024 GEORGIA SMITH
Grading Pre-Inspection Cleared 5/20/2024 MICHAEL TEMPLE

Contact Information

Contractor Arbabi Construction Inc; Lic. No.: 514421-B       ,
Contractor Arbabi M R David; Lic. No.: 514421-B       ,
Engineer Javadvesian,, Hrach; Lic. No.: C42319 411 N CENTRAL 605      GLENDALE, CA 91203

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 6/10/2024 Partial Approval LILIANA PORTILLO
PLUMBING-Rough 6/10/2024 Corrections Issued LILIANA PORTILLO
Excavation/Setback/Form/Re-Bar 6/21/2024 Approved OSVALDO PARAMO
Floor/Roof Diaphrgm/Shear Wall 6/28/2024 Corrections Issued LILIANA PORTILLO
PLUMBING-Rough 6/28/2024 Partial Approval LILIANA PORTILLO
ELECTRICAL-Rough 7/9/2024 Approved OSVALDO PARAMO
Floor/Roof Diaphrgm/Shear Wall 7/9/2024 Not Ready for Inspection OSVALDO PARAMO
HVAC-Rough 7/9/2024 Approved OSVALDO PARAMO
Interior/Exterior Lathing 7/9/2024 Not Ready for Inspection OSVALDO PARAMO
PLUMBING-Rough 7/9/2024 Not Ready for Inspection OSVALDO PARAMO
Floor/Roof Diaphrgm/Shear Wall 7/18/2024 Conditional Approval LILIANA PORTILLO
Interior/Exterior Lathing 7/18/2024 Not Ready for Inspection LILIANA PORTILLO
PLUMBING-Rough 7/18/2024 Corrections Issued LILIANA PORTILLO
PLUMBING-Rough 7/22/2024 Approved LILIANA PORTILLO
BUILDING-Rough-Frame 7/24/2024 Approved OSVALDO PARAMO
Green Building Rough 7/24/2024 Approved OSVALDO PARAMO
Interior/Exterior Lathing 7/24/2024 Partial Approval OSVALDO PARAMO
MERV13>=Rough 7/24/2024 Approved OSVALDO PARAMO
Wood Frame 7/24/2024 Approved OSVALDO PARAMO
Insulation 8/2/2024 Corrections Issued LILIANA PORTILLO
Insulation 8/6/2024 Approved LILIANA PORTILLO
Drywall Nailing 8/14/2024 Corrections Issued ANTHONY RAMOS
Shower Pan 8/14/2024 Not Ready for Inspection ANTHONY RAMOS
Drywall Nailing 8/16/2024 Approved LILIANA PORTILLO
Shower Pan 8/16/2024 Approved LILIANA PORTILLO
Interior/Exterior Lathing 8/20/2024 Approved LILIANA PORTILLO
Green Building Final 9/19/2024 Not Ready for Inspection OSVALDO PARAMO
MERV13>=Final 9/19/2024 Not Ready for Inspection OSVALDO PARAMO
SGSOV-Seismic Gas S/O Valve 9/19/2024 SGSOV Not Ready OSVALDO PARAMO
Smoke Detectors 9/19/2024 Not Ready for Inspection OSVALDO PARAMO
Final 11/15/2024 Corrections Issued LILIANA PORTILLO
Green Building Final 11/15/2024 Not Ready for Inspection LILIANA PORTILLO
MERV13>=Final 11/15/2024 Not Ready for Inspection LILIANA PORTILLO
SGSOV-Seismic Gas S/O Valve 11/15/2024 SGSOV Approved LILIANA PORTILLO
Smoke Detectors 11/15/2024 Approved LILIANA PORTILLO
ELECTRICAL-Final 11/22/2024 Not Ready for Inspection LILIANA PORTILLO
Green Building Final 11/22/2024 Not Ready for Inspection LILIANA PORTILLO
MERV13>=Final 11/22/2024 Approved LILIANA PORTILLO
Final 12/11/2024 Not Ready for Inspection LILIANA PORTILLO
Green Building Final 12/11/2024 Not Ready for Inspection LILIANA PORTILLO
Final 1/16/2025 Not Ready for Inspection ALIZAH MAYAGOITIA
Green Building Final 1/16/2025 Not Ready for Inspection ALIZAH MAYAGOITIA
ELECTRICAL-Final 1/23/2025 Approved LILIANA PORTILLO
Final 1/23/2025 OK to Issue CofO LILIANA PORTILLO
Green Building Final 1/23/2025 Approved LILIANA PORTILLO
HVAC-Final 1/23/2025 Approved LILIANA PORTILLO
PLUMBING-Final 1/23/2025 Approved LILIANA PORTILLO