5046 N LOLETA AVE 90041
Certificate Information: 5046 N LOLETA AVE 90041
- Application / Permit
- 24016-10000-03869
- Plan Check / Job No.
- B24LA02189
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- ePlan: REMODEL TO EXISTING SFD. NO SQUARE FOOTAGE ADDED. Convert two bedroom SFD into a three bedroom SFD. Relocate existing kitchen area. Relocate existing bathroom. Create a new bathroom. Install new windows, per plan. Replace windows same size, per plan. Install new tankless water heater. ***BUILDING TO BE EQUIPPED WITH NFPA-13D FIRE SPRINKLERS THROUGH OUT***
- Permit Issued
- Issued on 7/11/2024
- Issuing Office
- Current Status
- Permit Finaled on 2/12/2025
Permit Application Status History
| Submitted | 2/11/2024 | APPLICANT |
| Assigned to Plan Check Engineer | 2/22/2024 | CRYSTEL MAALOUF |
| Corrections Issued | 2/27/2024 | CRYSTEL MAALOUF |
| Quality Review Completed | 3/11/2024 | CAROLYNN NEPOMUCENO |
| Plan Check Approved | 7/9/2024 | CRYSTEL MAALOUF |
| Issued | 7/11/2024 | APPLICANT |
| Permit Finaled | 2/12/2025 | BRENDAN MORELLI |
Permit Application Clearance Information
| CPC | Cleared | 5/31/2024 | STEVEN WECHSLER |
| Grading Pre-Inspection | Cleared | 7/9/2024 | LANNY MERRICK |
Contact Information
| Contractor | Owner-Builder | , |
| Engineer | Park,, Juntae; Lic. No.: C65104 | 3055 WILSHIRE BLVD 880 LOS ANGELES, CA 90010 |
Inspector Information
| RONNIE MEDINA, (213) 469-5852 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Pre-Inspection | 8/2/2024 | Corrections Issued | CRAIG VAUGHAN |
| BUILDING-Rough-Frame | 10/16/2024 | Not Ready for Inspection | ROY SPAULDING |
| ELECTRICAL-Rough | 10/16/2024 | Approved | ROY SPAULDING |
| Floor/Roof Diaphrgm/Shear Wall | 10/16/2024 | Approved | ROY SPAULDING |
| HVAC-Rough | 10/16/2024 | Approved | ROY SPAULDING |
| Interior/Exterior Lathing | 10/16/2024 | Not Ready for Inspection | ROY SPAULDING |
| PLUMBING-Rough | 10/16/2024 | Approved | ROY SPAULDING |
| Shower Pan | 10/16/2024 | Not Ready for Inspection | ROY SPAULDING |
| Verify Sprinkler Sign Off | 10/16/2024 | Corrections Issued | ROY SPAULDING |
| BUILDING-Rough-Frame | 10/25/2024 | Approved | ROY SPAULDING |
| Insulation | 10/25/2024 | Approved | ROY SPAULDING |
| Shower Pan | 10/25/2024 | Approved | ROY SPAULDING |
| Verify Sprinkler Sign Off | 10/25/2024 | Approved | ROY SPAULDING |
| Drywall Nailing | 10/30/2024 | Approved | ROY SPAULDING |
| Interior/Exterior Lathing | 11/4/2024 | Approved | ROY SPAULDING |
| Gas Test | 11/14/2024 | Approved | ROY SPAULDING |
| ELECTRICAL-Final | 1/23/2025 | Corrections Issued | BRENDAN MORELLI |
| HVAC-Final | 1/23/2025 | Corrections Issued | BRENDAN MORELLI |
| PLUMBING-Final | 1/23/2025 | Corrections Issued | BRENDAN MORELLI |
| ELECTRICAL-Final | 2/12/2025 | Approved | BRENDAN MORELLI |
| Final | 2/12/2025 | Permit Finaled | BRENDAN MORELLI |
| HVAC-Final | 2/12/2025 | Approved | BRENDAN MORELLI |
| PLUMBING-Final | 2/12/2025 | Approved | BRENDAN MORELLI |
| SGSOV-Seismic Gas S/O Valve | 2/12/2025 | SGSOV Approved | BRENDAN MORELLI |
| Smoke Detectors | 2/12/2025 | Approved | BRENDAN MORELLI |