5046 N LOLETA AVE 90041

Certificate Information: 5046 N LOLETA AVE 90041

Application / Permit
24016-10000-03869
Plan Check / Job No.
B24LA02189
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
ePlan: REMODEL TO EXISTING SFD. NO SQUARE FOOTAGE ADDED. Convert two bedroom SFD into a three bedroom SFD. Relocate existing kitchen area. Relocate existing bathroom. Create a new bathroom. Install new windows, per plan. Replace windows same size, per plan. Install new tankless water heater. ***BUILDING TO BE EQUIPPED WITH NFPA-13D FIRE SPRINKLERS THROUGH OUT***
Permit Issued
Issued on 7/11/2024
Issuing Office
Current Status
Permit Finaled on 2/12/2025

Permit Application Status History

Submitted 2/11/2024 APPLICANT
Assigned to Plan Check Engineer 2/22/2024 CRYSTEL MAALOUF
Corrections Issued 2/27/2024 CRYSTEL MAALOUF
Quality Review Completed 3/11/2024 CAROLYNN NEPOMUCENO
Plan Check Approved 7/9/2024 CRYSTEL MAALOUF
Issued 7/11/2024 APPLICANT
Permit Finaled 2/12/2025 BRENDAN MORELLI

Permit Application Clearance Information

CPC Cleared 5/31/2024 STEVEN WECHSLER
Grading Pre-Inspection Cleared 7/9/2024 LANNY MERRICK

Contact Information

Contractor Owner-Builder       ,
Engineer Park,, Juntae; Lic. No.: C65104 3055 WILSHIRE BLVD 880      LOS ANGELES, CA 90010

Inspector Information

RONNIE MEDINA, (213) 469-5852 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 8/2/2024 Corrections Issued CRAIG VAUGHAN
BUILDING-Rough-Frame 10/16/2024 Not Ready for Inspection ROY SPAULDING
ELECTRICAL-Rough 10/16/2024 Approved ROY SPAULDING
Floor/Roof Diaphrgm/Shear Wall 10/16/2024 Approved ROY SPAULDING
HVAC-Rough 10/16/2024 Approved ROY SPAULDING
Interior/Exterior Lathing 10/16/2024 Not Ready for Inspection ROY SPAULDING
PLUMBING-Rough 10/16/2024 Approved ROY SPAULDING
Shower Pan 10/16/2024 Not Ready for Inspection ROY SPAULDING
Verify Sprinkler Sign Off 10/16/2024 Corrections Issued ROY SPAULDING
BUILDING-Rough-Frame 10/25/2024 Approved ROY SPAULDING
Insulation 10/25/2024 Approved ROY SPAULDING
Shower Pan 10/25/2024 Approved ROY SPAULDING
Verify Sprinkler Sign Off 10/25/2024 Approved ROY SPAULDING
Drywall Nailing 10/30/2024 Approved ROY SPAULDING
Interior/Exterior Lathing 11/4/2024 Approved ROY SPAULDING
Gas Test 11/14/2024 Approved ROY SPAULDING
ELECTRICAL-Final 1/23/2025 Corrections Issued BRENDAN MORELLI
HVAC-Final 1/23/2025 Corrections Issued BRENDAN MORELLI
PLUMBING-Final 1/23/2025 Corrections Issued BRENDAN MORELLI
ELECTRICAL-Final 2/12/2025 Approved BRENDAN MORELLI
Final 2/12/2025 Permit Finaled BRENDAN MORELLI
HVAC-Final 2/12/2025 Approved BRENDAN MORELLI
PLUMBING-Final 2/12/2025 Approved BRENDAN MORELLI
SGSOV-Seismic Gas S/O Valve 2/12/2025 SGSOV Approved BRENDAN MORELLI
Smoke Detectors 2/12/2025 Approved BRENDAN MORELLI