5025 S 7TH AVE 90043
Certificate Information: 5025 S 7TH AVE 90043
- Application / Permit
- 24016-10000-02255
- Plan Check / Job No.
- B24LA01228
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- EPLAN: REPAIR FIRE DAMAGE TO (E) S.F.D. PER ENGINEERING
- Permit Issued
- Issued on 5/7/2024
- Issuing Office
- Current Status
- Permit Finaled on 1/31/2025
Permit Application Status History
| Submitted | 1/25/2024 | APPLICANT |
| Assigned to Plan Check Engineer | 1/29/2024 | ALFRED RAMIREZ |
| Plan Check Approved | 1/30/2024 | ALFRED RAMIREZ |
| Issued | 5/7/2024 | APPLICANT |
| Permit Finaled | 1/30/2025 | LUIS CASTRO |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Belfor Usa Group Inc; Lic. No.: 810553-B | 185 OAKLAND AVENUE STE 150 BIRMINGHAM, MI 48009 |
| Engineer | Rivera,, Mark Paul; Lic. No.: C66864 | 6700 MARK TWAIN DR PINETOP, AZ 85935 |
Inspector Information
| LUIS CASTRO, (213) 202-3436 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Wood Frame | 5/29/2024 | Corrections Issued | ANTHONY EGSON |
| Wood Frame | 6/10/2024 | Corrections Issued | ANTHONY EGSON |
| Wood Frame | 6/14/2024 | Partial Approval | ANTHONY EGSON |
| Wood Frame | 6/18/2024 | Not Ready for Inspection | ANTHONY EGSON |
| Wood Frame | 7/9/2024 | Corrections Issued | JOSE MACIAS |
| Wood Frame | 7/12/2024 | Corrections Issued | ANTHONY EGSON |
| Wood Frame | 7/16/2024 | Partial Inspection | CRAIG DAVIS |
| Wood Frame | 7/19/2024 | Not Ready for Inspection | ANTHONY EGSON |
| Wood Frame | 7/24/2024 | Partial Approval | ANTHONY EGSON |
| Drywall Nailing | 8/15/2024 | Not Ready for Inspection | JOSH MEISTER |
| Drywall Nailing | 8/19/2024 | Not Ready for Inspection | ANTHONY EGSON |
| Insulation | 8/19/2024 | Not Ready for Inspection | ANTHONY EGSON |
| Drywall Nailing | 8/21/2024 | Not Ready for Inspection | ANTHONY EGSON |
| Insulation | 8/21/2024 | Corrections Issued | ANTHONY EGSON |
| Drywall Nailing | 8/27/2024 | Approved | CRAIG DAVIS |
| Insulation | 8/27/2024 | Approved | CRAIG DAVIS |
| Final | 11/6/2024 | Corrections Issued | JOSH MEISTER |
| SGSOV-Seismic Gas S/O Valve | 11/6/2024 | SGSOV Not Ready | JOSH MEISTER |
| Smoke Detectors | 11/6/2024 | Corrections Issued | JOSH MEISTER |
| Final | 11/8/2024 | Corrections Issued | BARRY HACHE |
| SGSOV-Seismic Gas S/O Valve | 11/8/2024 | SGSOV Not Ready | BARRY HACHE |
| Smoke Detectors | 11/8/2024 | Approved | BARRY HACHE |
| Final | 11/13/2024 | Not Ready for Inspection | BARRY HACHE |
| SGSOV-Seismic Gas S/O Valve | 11/13/2024 | SGSOV Approved | BARRY HACHE |
| Final | 11/25/2024 | Corrections Issued | BARRY HACHE |
| Final | 11/27/2024 | Corrections Issued | BARRY HACHE |
| Pre-Inspection | 12/3/2024 | Not Ready for Inspection | BARRY HACHE |
| Final | 12/13/2024 | Not Ready for Inspection | BARRY HACHE |
| Final | 1/15/2025 | Corrections Issued | LUIS CASTRO |
| Final | 1/30/2025 | Permit Finaled | LUIS CASTRO |