10530 W AYRES AVE 90064

Certificate Information: 10530 W AYRES AVE 90064

Application / Permit
24014-30000-01829
Plan Check / Job No.
B24WL00926
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
Addition of (N) 2nd story Accessory Dwelling Unit with exterior stairs above an (E) Detached Garage at Rear of The Lot Per LAMC 12.22 A.33 (c)-(d). Increase the size of the garage and add a storage closet to the garage below proposed stairs.
Permit Issued
Issued on 10/16/2024
Issuing Office
Valley
Current Status
Issued on 10/16/2024
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 5/2/2024 APPLICANT
Assigned to Plan Check Engineer 5/3/2024 EDWIN ESPIN
Corrections Issued 5/5/2024 EDWIN ESPIN
Building Plans Picked Up 5/16/2024 APPLICANT
Applicant returned to address corrections 6/27/2024 JOHNPAUL ISIP
Plan Check Approved 9/3/2024 RICHARD GARCIA
Issued 10/16/2024 APPLICANT

Permit Application Clearance Information

Construction near power lines Cleared 5/22/2024 TINA MIRANDA
Address approval Cleared 6/20/2024 DARIN LAM
Roof/Waste drainage to street Cleared 6/20/2024 DARIN LAM
Eng Process Fee Ord 176,300 Cleared 6/21/2024 DARIN LAM
Sewer availability Cleared 6/21/2024 DARIN LAM
Specific Plan Cleared 7/12/2024 PEDRO AYALA
GPI Written Notices Cleared 9/3/2024 EDWIN ESPIN
Grading Pre-Inspection Cleared 9/3/2024 EDWIN ESPIN

Contact Information

Contractor Bela Remodeling; Lic. No.: 1038287-B 1023 1/2 ABBOT KINNEY BLVD      VENICE, CA 90291
Engineer Almalla,, Dean; Lic. No.: C58024 15053 VENTURA BLVD STE 205      SHERMAN OAKS, CA 91403

Inspector Information

ASHLEY THOMPSON, (310) 914-3897 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

PLUMBING-Rough 11/12/2024 Corrections Issued ASHLEY THOMPSON
PLUMBING-Rough 11/18/2024 Partial Approval ARAM AVEDISIAN
Footing/Foundation/Slab 12/2/2024 Conditional Approval JESUS RODRIGUEZ
Wood Frame 12/18/2024 Partial Approval KIRK SANDERS
Floor/Roof Diaphrgm/Shear Wall 2/3/2025 Corrections Issued STEPHANIE SWANSON
Sewer 3/19/2025 Approved ASHLEY THOMPSON
ELECTRICAL-Rough 4/30/2025 Corrections Issued ASHLEY THOMPSON
HVAC-Rough 4/30/2025 Corrections Issued ASHLEY THOMPSON
PLUMBING-Rough 4/30/2025 Corrections Issued ASHLEY THOMPSON
BUILDING-Rough-Frame 5/6/2025 Not Ready for Inspection STEPHANIE SWANSON
ELECTRICAL-Rough 5/6/2025 Approved STEPHANIE SWANSON
Floor/Roof Diaphrgm/Shear Wall 5/6/2025 Corrections Issued STEPHANIE SWANSON
HVAC-Rough 5/6/2025 Partial Approval STEPHANIE SWANSON
Shower Pan 5/6/2025 Approved STEPHANIE SWANSON
Floor/Roof Diaphrgm/Shear Wall 5/8/2025 Partial Approval STEPHANIE SWANSON
Green Building Rough 5/21/2025 Not Ready for Inspection ASHLEY THOMPSON
Interior/Exterior Lathing 5/21/2025 Partial Approval ASHLEY THOMPSON
Interior/Exterior Lathing 5/27/2025 Partial Approval ASHLEY THOMPSON
Interior/Exterior Lathing 5/29/2025 Approved JAYLIN GRAVITTE
BUILDING-Rough-Frame 6/3/2025 Partial Approval STEPHANIE SWANSON
Green Building Rough 6/3/2025 Approved STEPHANIE SWANSON
Insulation 6/10/2025 Corrections Issued ASHLEY THOMPSON
Floor/Roof Diaphrgm/Shear Wall 6/26/2025 Approved EVAN COOPER
Insulation 6/26/2025 Approved EVAN COOPER
Drywall Nailing 7/14/2025 Conditional Approval KIRK SANDERS
Smoke Detectors 7/14/2025 Corrections Issued KIRK SANDERS
BUILDING-Rough-Frame 4/22/2026 Approved ASHLEY THOMPSON
Drywall Nailing 4/22/2026 Approved ASHLEY THOMPSON
ELECTRICAL-Final 4/22/2026 Approved ASHLEY THOMPSON
Final 4/22/2026 Not Ready for Inspection ASHLEY THOMPSON
Footing/Foundation/Slab 4/22/2026 Approved ASHLEY THOMPSON
Green Building Final 4/22/2026 Approved ASHLEY THOMPSON
HVAC-Final 4/22/2026 Corrections Issued ASHLEY THOMPSON
METHANE-Final 4/22/2026 Approved ASHLEY THOMPSON
METHANE-Rough 4/22/2026 Approved ASHLEY THOMPSON
PLUMBING-Final 4/22/2026 Approved ASHLEY THOMPSON
SGSOV-Seismic Gas S/O Valve 4/22/2026 SGSOV Not Required ASHLEY THOMPSON
Smoke Detectors 4/22/2026 Not Ready for Inspection ASHLEY THOMPSON