6245 N KLUMP AVE 91606

Certificate Information: 6245 N KLUMP AVE 91606

Application / Permit
24014-20000-05742
Plan Check / Job No.
B24VN27114
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
ADD 17'-9" X 5' AND 3' X 9' ON FIRST FLOOR AT THE FRONT OF THE EXISTING SINGLE FAMILY DWELLING; ADD 14'-8" X 15' IRREGULAR SHAPE TO THE REAR OF THE DWELLING ON THE FIRST FLOOR; ADD NEW 37' X 41'-9" ON SECOND FLOOR; EQUIPPED WITH NFPA 13-D FIRE SPRINKLERS THROUGOUT
Permit Issued
Issued on 4/8/2025
Issuing Office
Valley
Current Status
Issued on 4/8/2025
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 12/30/2024 APPLICANT
Assigned to Plan Check Engineer 1/2/2025 SELLA BENYAMIN
Corrections Issued 1/6/2025 SELLA BENYAMIN
Quality Review Completed 1/6/2025 STEVEN KIM
Building Plans Picked Up 1/17/2025 APPLICANT
Plan Check Approved 4/8/2025 SELLA BENYAMIN
Issued 4/8/2025 APPLICANT

Permit Application Clearance Information

Roof/Waste drainage to street Cleared 3/21/2025 TREVOR QUAN
Eng Process Fee Ord 176,300 Cleared 3/24/2025 TREVOR QUAN
Sewer availability Cleared 3/24/2025 TREVOR QUAN

Contact Information

Contractor Owner-Builder       ,
Engineer Baich,, Brendon Chad; Lic. No.: C83347 PO BOX 8840      POMONA, CA 91701

Inspector Information

GAREN HAYRAPETYAN, (818) 374-1171 Office Hours: 7:00-8:00 AM MON-FRI
ROBERTO PALACIOS-LOPEZ, (818) 374-1171 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 5/5/2025 Conditional Approval JUAN VALENZUELA
Excavation/Setback/Form/Re-Bar 5/8/2025 Corrections Issued ROBERTO PALACIOS-LOPEZ
Footing/Foundation/Slab 5/8/2025 Corrections Issued ROBERTO PALACIOS-LOPEZ
Reinforced Concrete Frame 5/8/2025 Partial Inspection ROBERTO PALACIOS-LOPEZ
Excavation/Setback/Form/Re-Bar 5/15/2025 Corrections Issued ROBERTO PALACIOS-LOPEZ
Footing/Foundation/Slab 5/15/2025 Corrections Issued ROBERTO PALACIOS-LOPEZ
Reinforced Concrete Frame 5/15/2025 Partial Inspection ROBERTO PALACIOS-LOPEZ
Reinforced Masonry Frame 5/15/2025 Partial Inspection ROBERTO PALACIOS-LOPEZ
Deputy Drilled-In Anchors 5/21/2025 Conditional Approval JUAN VALENZUELA
Footing/Foundation/Slab 5/21/2025 Approved ROBERTO PALACIOS-LOPEZ
Floor/Roof Diaphrgm/Shear Wall 6/6/2025 Partial Approval JOSE AVILA
PLUMBING-Rough 6/6/2025 Corrections Issued JOSE AVILA
Gas Test 6/12/2025 Approved ROBERTO PALACIOS-LOPEZ
Insulation 6/12/2025 Partial Approval ROBERTO PALACIOS-LOPEZ
PLUMBING-Rough 6/12/2025 Partial Approval ROBERTO PALACIOS-LOPEZ
BUILDING-Rough-Frame 7/8/2025 Not Ready for Inspection ROBERTO PALACIOS-LOPEZ
Floor/Roof Diaphrgm/Shear Wall 7/8/2025 Partial Approval ROBERTO PALACIOS-LOPEZ
Green Building Rough 7/8/2025 Not Ready for Inspection ROBERTO PALACIOS-LOPEZ
Wood Frame 7/8/2025 Partial Inspection ROBERTO PALACIOS-LOPEZ
Floor/Roof Diaphrgm/Shear Wall 9/4/2025 Corrections Issued ROBERTO PALACIOS-LOPEZ
Green Building Rough 9/4/2025 Not Ready for Inspection ROBERTO PALACIOS-LOPEZ
PLUMBING-Rough 9/4/2025 Corrections Issued ROBERTO PALACIOS-LOPEZ
Shower Pan 9/4/2025 Not Ready for Inspection ROBERTO PALACIOS-LOPEZ
Verify Sprinkler Sign Off 9/4/2025 Corrections Issued ROBERTO PALACIOS-LOPEZ
ELECTRICAL-Rough 9/23/2025 Corrections Issued ROBERTO PALACIOS-LOPEZ
Floor/Roof Diaphrgm/Shear Wall 9/23/2025 Partial Approval ROBERTO PALACIOS-LOPEZ
HVAC-Rough 9/23/2025 Not Ready for Inspection ROBERTO PALACIOS-LOPEZ
PLUMBING-Rough 9/23/2025 Partial Approval ROBERTO PALACIOS-LOPEZ
BUILDING-Rough-Frame 9/25/2025 Corrections Issued ROBERTO PALACIOS-LOPEZ
Green Building Rough 9/25/2025 Not Ready for Inspection ROBERTO PALACIOS-LOPEZ
Wood Frame 9/25/2025 Partial Inspection ROBERTO PALACIOS-LOPEZ
HVAC-Rough 9/26/2025 Corrections Issued JOSE AVILA
Shower Pan 9/26/2025 Approved JOSE AVILA
Deputy Wood Construction 10/6/2025 Conditional Approval JUAN VALENZUELA
BUILDING-Rough-Frame 10/10/2025 Approved ROBERTO PALACIOS-LOPEZ
Green Building Rough 10/10/2025 Approved ROBERTO PALACIOS-LOPEZ
Rough-Elec/Plmb/HVAC 10/10/2025 Approved ROBERTO PALACIOS-LOPEZ
Special/Order Compliance 10/10/2025 Conditional Approval ROBERTO PALACIOS-LOPEZ
Verify Sprinkler Sign Off 10/10/2025 Approved ROBERTO PALACIOS-LOPEZ
Insulation 10/23/2025 Corrections Issued ROBERTO PALACIOS-LOPEZ
Interior/Exterior Lathing 10/23/2025 Partial Approval ROBERTO PALACIOS-LOPEZ
Drywall Nailing 11/10/2025 Approved LOUIS ESCOTO
Insulation 11/10/2025 Approved LOUIS ESCOTO
Special/Order Compliance 11/10/2025 Corrections Issued LOUIS ESCOTO
ELECTRICAL-Final 3/26/2026 Corrections Issued ROBERTO PALACIOS-LOPEZ
Final 3/26/2026 Corrections Issued ROBERTO PALACIOS-LOPEZ
Green Building Final 3/26/2026 Corrections Issued ROBERTO PALACIOS-LOPEZ
HVAC-Final 3/26/2026 Corrections Issued ROBERTO PALACIOS-LOPEZ
PLUMBING-Final 3/26/2026 Corrections Issued ROBERTO PALACIOS-LOPEZ
SGSOV-Seismic Gas S/O Valve 3/26/2026 SGSOV Approved ROBERTO PALACIOS-LOPEZ
Smoke Detectors 3/26/2026 Corrections Issued ROBERTO PALACIOS-LOPEZ
Final 4/3/2026 Corrections Issued ROBERTO PALACIOS-LOPEZ
Green Building Final 4/3/2026 Approved ROBERTO PALACIOS-LOPEZ
Smoke Detectors 4/3/2026 Approved ROBERTO PALACIOS-LOPEZ
ELECTRICAL-Final 4/7/2026 Approved ROBERTO PALACIOS-LOPEZ
Final 4/7/2026 Partial Approval ROBERTO PALACIOS-LOPEZ