4500 N CALHOUN AVE 91423

Certificate Information: 4500 N CALHOUN AVE 91423

Application / Permit
24014-20000-04637
Plan Check / Job No.
B24VN19988
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
REMOVE ALL EXTERIOR AND INTERIOR WALLS OF AN EXISTING ONE STORY DWELLING EXCEPT FOR 3 LINEAR FT AT WEST PORTION OF THE LOT AND BUILD 69'11-3/4" X 38' TWO STORY DWELLING WITH ATTACHED TWO CAR GARAGE , NFPA-13D FIRE SPRINKLERS REQUIRED THROUGHOUT, ALL WORK PER ENGINEERING
Permit Issued
Issued on 1/6/2025
Issuing Office
Current Status
CofO Issued on 9/5/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 10/16/2024 APPLICANT
Assigned to Plan Check Engineer 10/17/2024 RARES BODEA
Corrections Issued 10/22/2024 RARES BODEA
Quality Review Completed 10/22/2024 STEVEN KIM
Building Plans Picked Up 10/23/2024 APPLICANT
Plan Check Approved 1/6/2025 RARES BODEA
Issued 1/6/2025 APPLICANT
CofO in Progress 8/20/2025 RAUL OLAGI
CofO Issued 9/5/2025 RUBEN SALAS
Permit Finaled 9/5/2025 RUBEN SALAS

Permit Application Clearance Information

Permit Cleared 10/21/2024 LEE GUILBEAUX
Public Works-Highway Ded. Cleared 10/21/2024 LEE GUILBEAUX
Eng Process Fee Ord 176,300 Cleared 10/22/2024 LEE GUILBEAUX
Sewer availability Cleared 10/22/2024 LEE GUILBEAUX
Low Impact Development (LID) Cleared 10/24/2024 SARAH YOUSSEF
ZI Cleared 10/30/2024 DORIAN AGUILAR
Roof/Waste drainage to street Cleared 11/14/2024 BIAINA HARITUNIAN
Trees in Parkway Cleared 11/14/2024 MIGUEL ORNELAS

Contact Information

Contractor Owner-Builder       ,
Engineer Yuzon,, Benigno Sari; Lic. No.: S3454 2511 PEACHWOOD PLACE      WESTLAKE VILLAGE, CA 91361

Inspector Information

MISAEL ESPARZA, (818) 374-1169 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Reinf. Concrete 2/19/2025 Conditional Approval ROBERT GOLD
Excavation/Setback/Form/Re-Bar 2/19/2025 Approved JACK KARGODORIAN
Underground Mechanical 2/19/2025 Approved JACK KARGODORIAN
Excavation/Setback/Form/Re-Bar 2/20/2025 Partial Inspection MISAEL ESPARZA
Sewer 2/20/2025 Approved MISAEL ESPARZA
Excavation/Setback/Form/Re-Bar 2/24/2025 Approved MISAEL ESPARZA
Footing/Foundation/Slab 2/24/2025 Approved MISAEL ESPARZA
Floor/Roof Diaphrgm/Shear Wall 3/5/2025 Partial Approval MISAEL ESPARZA
Deputy Steel/Welding 3/17/2025 Conditional Approval JUAN VALENZUELA
Deputy Wood Construction 3/18/2025 Conditional Approval RAUL OLAGI
Floor/Roof Diaphrgm/Shear Wall 3/19/2025 Corrections Issued MISAEL ESPARZA
Floor/Roof Diaphrgm/Shear Wall 3/21/2025 Not Ready for Inspection MISAEL ESPARZA
Floor/Roof Diaphrgm/Shear Wall 3/26/2025 Corrections Issued MISAEL ESPARZA
ELECTRICAL-Rough 4/1/2025 Corrections Issued MISAEL ESPARZA
Floor/Roof Diaphrgm/Shear Wall 4/1/2025 Order to Comply Issued MISAEL ESPARZA
HVAC-Rough 4/1/2025 Corrections Issued MISAEL ESPARZA
PLUMBING-Rough 4/1/2025 Not Ready for Inspection MISAEL ESPARZA
ELECTRICAL-Rough 4/2/2025 Conditional Approval MISAEL ESPARZA
HVAC-Rough 4/2/2025 Corrections Issued MISAEL ESPARZA
PLUMBING-Rough 4/2/2025 Approved MISAEL ESPARZA
ELECTRICAL-Rough 4/3/2025 Corrections Issued MISAEL ESPARZA
Floor/Roof Diaphrgm/Shear Wall 4/3/2025 Not Ready for Inspection MISAEL ESPARZA
HVAC-Rough 4/3/2025 Approved MISAEL ESPARZA
PLUMBING-Rough 4/3/2025 Approved MISAEL ESPARZA
ELECTRICAL-Rough 4/4/2025 Approved MISAEL ESPARZA
HVAC-Rough 4/4/2025 Approved MISAEL ESPARZA
PLUMBING-Rough 4/4/2025 Approved MISAEL ESPARZA
BUILDING-Rough-Frame 4/9/2025 Corrections Issued MISAEL ESPARZA
Green Building Rough 4/9/2025 Approved MISAEL ESPARZA
MERV13>=Rough 4/9/2025 Approved MISAEL ESPARZA
Shower Pan 4/10/2025 Approved MISAEL ESPARZA
Interior/Exterior Lathing 4/15/2025 Partial Approval MISAEL ESPARZA
BUILDING-Rough-Frame 4/21/2025 Approved JUAN VALENZUELA
Verify Sprinkler Sign Off 4/21/2025 Approved JUAN VALENZUELA
Insulation 4/23/2025 Approved MICHAEL CORTEZ
Interior/Exterior Lathing 4/23/2025 Approved MICHAEL CORTEZ
Insulation 4/24/2025 Not Ready for Inspection MICHAEL CORTEZ
Interior/Exterior Lathing 4/24/2025 Approved MICHAEL CORTEZ
Interior/Exterior Lathing 4/25/2025 No Access for Inspection JAVIER RAMOS JR
Drywall Nailing 4/28/2025 Approved MISAEL ESPARZA
SGSOV-Seismic Gas S/O Valve 7/18/2025 SGSOV Not Ready MISAEL ESPARZA
ELECTRICAL-Final 8/1/2025 Not Ready for Inspection MISAEL ESPARZA
HVAC-Final 8/1/2025 Corrections Issued MISAEL ESPARZA
HVAC-Final 8/6/2025 Approved MISAEL ESPARZA
PLUMBING-Final 8/6/2025 Approved MISAEL ESPARZA
ELECTRICAL-Final 8/8/2025 Corrections Issued MISAEL ESPARZA
HVAC-Final 8/8/2025 Approved MISAEL ESPARZA
PLUMBING-Final 8/8/2025 Approved MISAEL ESPARZA
ELECTRICAL-Final 8/12/2025 Approved MISAEL ESPARZA
Final 8/14/2025 Corrections Issued MISAEL ESPARZA
Green Building Final 8/14/2025 Approved MISAEL ESPARZA
MERV13>=Final 8/14/2025 Approved MISAEL ESPARZA
SGSOV-Seismic Gas S/O Valve 8/14/2025 SGSOV Approved MISAEL ESPARZA
Smoke Detectors 8/14/2025 Approved MISAEL ESPARZA
Final 8/15/2025 OK to Issue CofO MISAEL ESPARZA