5210 E GRANADA ST 90042

Certificate Information: 5210 E GRANADA ST 90042

Application / Permit
24014-20000-04517
Plan Check / Job No.
B24VN19174
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
PROPOSED INT/EXT REMODEL WITH ADDITIONS: @ 2ND FLR - 11' X 9'7" ADDITION TO EXPAND EX DINING AREA, NEW VAULTED CEILING/ROOF OVER THE ADDN & EX BEDROOM PER PLAN. ENCLOSE FRONT 7'9" X 4'10" PORCH. @ 1ST FLR - PROPOSED 11' X 9"7" REC RM ADDITION (NOT INTER-CONNECTED).
Permit Issued
Issued on 2/3/2025
Issuing Office
West Los Angeles
Current Status
CofO Issued on 3/7/2026
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 10/8/2024 APPLICANT
Assigned to Plan Check Engineer 10/16/2024 HAYATO TSUCHIYA
Corrections Issued 10/16/2024 HAYATO TSUCHIYA
Building Plans Picked Up 10/18/2024 APPLICANT
Plan Check Approved 1/30/2025 GIOVANNY CHAVEZ
Issued 2/3/2025 APPLICANT
CofO in Progress 3/5/2026 NICHOLAS LOPEZ
No Progress 3/5/2026 CHARLES BOGHOSKHAN
CofO in Progress 3/5/2026 CHARLES BOGHOSKHAN
Permit Finaled 3/7/2026 DEROLD HAUFF
CofO Issued 3/7/2026 DEROLD HAUFF
Permit Finaled 3/7/2026 DEROLD HAUFF

Permit Application Clearance Information

CPC Cleared 10/22/2024 BRENNEN OBETO
Miscellaneous Cleared 10/22/2024 BRENNEN OBETO
Roof/Waste drainage to street Cleared 10/25/2024 ABEL CASILLAS
Eng Process Fee Ord 176,300 Cleared 10/29/2024 ABEL CASILLAS
HPOZ Cleared 1/14/2025 NATHALY DE LA PAZ
ZI Cleared 1/14/2025 NATHALY DE LA PAZ
Grading Pre-Inspection Cleared 1/30/2025 MICHAEL TEMPLE

Contact Information

Contractor High Touch Inc; Lic. No.: 860365-B 10917 WEST PICO BOULEVARD      LOS ANGELES, CA 90064
Engineer Nirattisai,, Preston; Lic. No.: C85115 28411 ASCENT WAY      SANTA CLARITA, CA 91350

Inspector Information

NICHOLAS LOPEZ, (213) 202-3224 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 6/4/2025 Conditional Approval NICHOLAS LOPEZ
Excavation/Setback/Form/Re-Bar 6/9/2025 Corrections Issued NICHOLAS LOPEZ
Deputy Drilled-In Anchors 6/26/2025 Conditional Approval REGINA MENDEZ
Floor/Roof Diaphrgm/Shear Wall 7/28/2025 Conditional Approval NICHOLAS LOPEZ
Deputy Wood Construction 7/29/2025 Conditional Approval NICHOLAS LOPEZ
Deputy Wood Construction 8/7/2025 Conditional Approval NICHOLAS LOPEZ
BUILDING-Rough-Frame 8/29/2025 Approved NICHOLAS LOPEZ
ELECTRICAL-Rough 8/29/2025 Approved NICHOLAS LOPEZ
Green Building Rough 8/29/2025 Approved NICHOLAS LOPEZ
HVAC-Rough 8/29/2025 Approved NICHOLAS LOPEZ
Interior/Exterior Lathing 8/29/2025 Partial Approval NICHOLAS LOPEZ
PLUMBING-Rough 8/29/2025 Approved NICHOLAS LOPEZ
Insulation 9/9/2025 No Access for Inspection REGINA MENDEZ
Insulation 9/17/2025 Corrections Issued ANTHONY RAMOS
Insulation 9/26/2025 Approved GEM DE OCAMPO
Drywall Nailing 10/6/2025 Approved NICHOLAS LOPEZ
Interior/Exterior Lathing 10/17/2025 Approved REGINA MENDEZ
Shower Pan 10/17/2025 Approved REGINA MENDEZ
Footing/Foundation/Slab 2/18/2026 Approved NICHOLAS LOPEZ
Green Building Final 2/18/2026 Not Ready for Inspection NICHOLAS LOPEZ
Pre-Inspection 2/18/2026 Partial Inspection NICHOLAS LOPEZ
SGSOV-Seismic Gas S/O Valve 2/18/2026 SGSOV Not Ready NICHOLAS LOPEZ
Smoke Detectors 2/18/2026 Not Ready for Inspection NICHOLAS LOPEZ
Final 2/26/2026 Corrections Issued NICHOLAS LOPEZ
Green Building Final 2/26/2026 Not Ready for Inspection NICHOLAS LOPEZ
SGSOV-Seismic Gas S/O Valve 2/26/2026 SGSOV Approved NICHOLAS LOPEZ
Smoke Detectors 2/26/2026 Approved NICHOLAS LOPEZ
Final 3/4/2026 OK to Issue CofO NICHOLAS LOPEZ
Green Building Final 3/4/2026 Approved NICHOLAS LOPEZ