120 N CLIFFWOOD AVE 90049

Certificate Information: 120 N CLIFFWOOD AVE 90049

Application / Permit
24014-20000-03146
Plan Check / Job No.
B24VN10154
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(23) Accessory Living Quarters
Work Description
25'-0" x 19'-10" ADDITION TO (E) ALQ, ALL WORK PER ENG.
Permit Issued
Issued on 9/26/2024
Issuing Office
Current Status
CofO Issued on 8/4/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 7/18/2024 APPLICANT
Assigned to Plan Check Engineer 7/25/2024 JESSE ARELLANO
Corrections Issued 7/25/2024 JESSE ARELLANO
Building Plans Picked Up 7/30/2024 APPLICANT
Applicant returned to address corrections 9/6/2024 KAMYAR EMAMI
Issued 9/26/2024 APPLICANT
CofO in Progress 7/25/2025 KEVIN SARGSYAN
Permit Finaled 8/4/2025 RICHARD STEINBACH
CofO Issued 8/4/2025 RICHARD STEINBACH
Permit Finaled 8/4/2025 RICHARD STEINBACH

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 8/13/2024 DARIN LAM
Roof/Waste drainage to street Cleared 8/29/2024 DARIN LAM
Grading Pre-Inspection Cleared 9/26/2024 KAMYAR EMAMI

Contact Information

Contractor Alr Remodeling; Lic. No.: 1114133-B 6677 SANTA MOICA BLVD #1807      LOS ANGELES, CA 90038
Engineer Park,, Juntae; Lic. No.: C65104 3055 WILSHIRE BLVD 880      LOS ANGELES, CA 90010

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 10/7/2024 Corrections Issued KEVIN SARGSYAN
Excavation/Setback/Form/Re-Bar 11/13/2024 Approved KEVIN SARGSYAN
Wood Frame 11/21/2024 Partial Approval KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 11/26/2024 Partial Approval KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 12/12/2024 Approved JESUS RODRIGUEZ
ELECTRICAL-Rough 1/3/2025 Corrections Issued KEVIN SARGSYAN
BUILDING-Rough-Frame 1/21/2025 Not Ready for Inspection JESUS RODRIGUEZ
ELECTRICAL-Rough 1/21/2025 Approved JESUS RODRIGUEZ
HVAC-Rough 1/21/2025 Corrections Issued JESUS RODRIGUEZ
Interior/Exterior Lathing 1/21/2025 Approved JESUS RODRIGUEZ
BUILDING-Rough-Frame 2/7/2025 Corrections Issued KEVIN SARGSYAN
Green Building Rough 2/7/2025 Not Ready for Inspection KEVIN SARGSYAN
BUILDING-Rough-Frame 2/11/2025 Approved KEVIN SARGSYAN
Green Building Rough 2/11/2025 Approved KEVIN SARGSYAN
HVAC-Rough 2/11/2025 Approved KEVIN SARGSYAN
Insulation 2/14/2025 Approved KEVIN SARGSYAN
Drywall Nailing 2/19/2025 Approved EVAN COOPER
Final 5/5/2025 Corrections Issued KEVIN SARGSYAN
Footing/Foundation/Slab 5/5/2025 Approved KEVIN SARGSYAN
Green Building Final 5/5/2025 Not Ready for Inspection KEVIN SARGSYAN
SGSOV-Seismic Gas S/O Valve 5/5/2025 SGSOV Not Ready KEVIN SARGSYAN
Smoke Detectors 5/5/2025 Not Ready for Inspection KEVIN SARGSYAN
Final 5/14/2025 Corrections Issued STEPHANIE SWANSON
Green Building Final 5/14/2025 Approved STEPHANIE SWANSON
SGSOV-Seismic Gas S/O Valve 5/14/2025 SGSOV Approved STEPHANIE SWANSON
Smoke Detectors 5/14/2025 Approved STEPHANIE SWANSON
Final 5/27/2025 Corrections Issued KEVIN SARGSYAN
Final 7/22/2025 Not Ready for Inspection KEVIN SARGSYAN
Final 7/25/2025 OK to Issue CofO KEVIN SARGSYAN