3241 W 59TH PL 90043

Certificate Information: 3241 W 59TH PL 90043

Application / Permit
24014-20000-02295
Plan Check / Job No.
B24VN07495
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
IRREGELUAR SHAPED ACCESSORY DWELLING UNIT ADDITION TO (E) DETACHED GARAGE PER LAMC 12.22 A.33(c) and (d)
Permit Issued
Issued on 6/20/2024
Issuing Office
Valley
Current Status
Issued on 6/20/2024
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 5/28/2024 APPLICANT
Assigned to Plan Check Engineer 6/4/2024 JEROME MAGAT PALMA
Corrections Issued 6/4/2024 JEROME MAGAT PALMA
Building Plans Picked Up 6/6/2024 APPLICANT
Plan Check Approved 6/20/2024 ALEC MOUSAKHANIAN
Issued 6/20/2024 APPLICANT

Permit Application Clearance Information

Address approval Cleared 6/10/2024 WALLIE JONG
Eng Process Fee Ord 176,300 Cleared 6/10/2024 WALLIE JONG
Roof/Waste drainage to street Cleared 6/10/2024 WALLIE JONG
Sewer availability Cleared 6/10/2024 WALLIE JONG
Construction near power lines Cleared 6/17/2024 TINA MIRANDA

Contact Information

Contractor L A Home Contractor Inc; Lic. No.: 1027193-B 14103 BURBANK BLVD      SHERMAN OAKS, CA 91401
Engineer Sin,, John Paul; Lic. No.: C91162 122 N GRAMERCY PL      LOS ANGELES, CA 90004

Inspector Information

SALVADOR MARTINEZ, (213) 202-3479 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Underground Mechanical 7/2/2024 Conditional Approval JOSE MACIAS
Excavation/Setback/Form/Re-Bar 7/22/2024 Approved JOSE MACIAS
Excavation/Setback/Form/Re-Bar 8/5/2024 Approved JOSE MACIAS
BUILDING-Rough-Frame 9/6/2024 Not Ready for Inspection AMIR NAZARIAN
Floor/Roof Diaphrgm/Shear Wall 9/6/2024 Partial Approval AMIR NAZARIAN
Green Building Rough 9/6/2024 Not Ready for Inspection AMIR NAZARIAN
Rough-Elec/Plmb/HVAC 9/6/2024 Corrections Issued AMIR NAZARIAN
HVAC-Rough 9/10/2024 Approved AMIR NAZARIAN
BUILDING-Rough-Frame 9/11/2024 Approved AMIR NAZARIAN
Deputy Drilled-In Anchors 9/11/2024 Approved AMIR NAZARIAN
Green Building Rough 9/11/2024 Approved AMIR NAZARIAN
Wood Frame 9/11/2024 Approved AMIR NAZARIAN
Insulation 9/18/2024 Corrections Issued ALEX COLIN
Interior/Exterior Lathing 9/18/2024 Conditional Approval ALEX COLIN
Drywall Nailing 9/23/2024 Approved AMIR NAZARIAN
Underground Mechanical 11/20/2024 Approved AMIR NAZARIAN
Drywall Nailing 12/6/2024 Approved NICHOLAS LOPEZ
Interior/Exterior Lathing 12/6/2024 Partial Approval NICHOLAS LOPEZ
Final 3/7/2025 Corrections Issued JOSE MACIAS
Footing/Foundation/Slab 3/7/2025 Approved JOSE MACIAS
Green Building Final 3/7/2025 Approved JOSE MACIAS
SGSOV-Seismic Gas S/O Valve 3/7/2025 SGSOV Not Ready JOSE MACIAS
Smoke Detectors 3/7/2025 Corrections Issued JOSE MACIAS