8850 W CADILLAC AVE 90034

Certificate Information: 8850 W CADILLAC AVE 90034

Application / Permit
24014-20000-01661
Plan Check / Job No.
B24VN05462
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
PROPOSED 32'-2" X 42'-8" IRREGULAR SHAPED 2-STORY ADDITION AT REAR AND ADDITION FOR (N) PORCH AND TO ENLARGE LIVING. DEMO (E) PATIO AND TRELLISAT REAR OF (E) SFD. NFPA 13D FIRE SPRINKLERS THROUGHOUT. ALL WORK PER ENGINEERING.
Permit Issued
Issued on 9/6/2024
Issuing Office
Current Status
CofO Issued on 11/4/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 4/22/2024 APPLICANT
Assigned to Plan Check Engineer 4/25/2024 RAPHAEL ROSAS
Corrections Issued 4/29/2024 RAPHAEL ROSAS
Quality Review Completed 5/3/2024 STEVEN KIM
Building Plans Picked Up 5/7/2024 APPLICANT
Plan Check Approved 7/22/2024 RAPHAEL ROSAS
Issued 9/6/2024 APPLICANT
CofO in Progress 10/23/2025 EVAN COOPER
Permit Finaled 11/4/2025 RICHARD STEINBACH
CofO Issued 11/4/2025 RICHARD STEINBACH
Permit Finaled 11/4/2025 RICHARD STEINBACH

Permit Application Clearance Information

Roof/Waste drainage to street Cleared 5/17/2024 WALLIE JONG
Eng Process Fee Ord 176,300 Cleared 5/20/2024 WALLIE JONG
Sewer availability Cleared 5/20/2024 WALLIE JONG
Hold Cleared 10/17/2024 ALEXIS SCHULTZ

Contact Information

Contractor Adar Builders Inc; Lic. No.: 1051859-B 7673 WINNETKA AVENUE      WINNETKA, CA 91306
Engineer Dominguez,, Refugio; Lic. No.: C50820 254 COTTONWOOD ST      ONTARIO, CA 91761

Inspector Information

WILBER ROSALES, (310) 914-3892 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 10/21/2024 Approved MEL KHACHATOURIAN
Deputy Reinf. Concrete 10/24/2024 No Access for Inspection MEL KHACHATOURIAN
BUILDING-Rough-Frame 11/5/2024 Partial Approval MEL KHACHATOURIAN
PLUMBING-Rough 11/5/2024 Partial Approval MEL KHACHATOURIAN
Deputy Steel/Welding 11/8/2024 No Access for Inspection MEL KHACHATOURIAN
Insulation 11/12/2024 Partial Approval MEL KHACHATOURIAN
Floor/Roof Diaphrgm/Shear Wall 11/14/2024 Partial Approval MEL KHACHATOURIAN
Floor/Roof Diaphrgm/Shear Wall 12/4/2024 Partial Approval MEL KHACHATOURIAN
Floor/Roof Diaphrgm/Shear Wall 1/16/2025 Corrections Issued MEL KHACHATOURIAN
Floor/Roof Diaphrgm/Shear Wall 2/6/2025 Not Ready for Inspection MEL KHACHATOURIAN
BUILDING-Rough-Frame 3/3/2025 Partial Approval ARAM AVEDISIAN
ELECTRICAL-Rough 3/3/2025 Corrections Issued ARAM AVEDISIAN
Green Building Rough 3/3/2025 Not Ready for Inspection ARAM AVEDISIAN
HVAC-Rough 3/3/2025 Corrections Issued ARAM AVEDISIAN
PLUMBING-Rough 3/3/2025 Corrections Issued ARAM AVEDISIAN
BUILDING-Rough-Frame 3/10/2025 Partial Approval EVAN COOPER
ELECTRICAL-Rough 3/10/2025 Approved EVAN COOPER
Green Building Rough 3/10/2025 Not Ready for Inspection EVAN COOPER
HVAC-Rough 3/10/2025 Approved EVAN COOPER
PLUMBING-Rough 3/10/2025 Approved EVAN COOPER
BUILDING-Rough-Frame 4/1/2025 Corrections Issued EVAN COOPER
Interior/Exterior Lathing 4/1/2025 Partial Approval EVAN COOPER
Shower Pan 4/1/2025 Not Ready for Inspection EVAN COOPER
BUILDING-Rough-Frame 4/3/2025 Approved EVAN COOPER
Green Building Rough 4/3/2025 Approved EVAN COOPER
Insulation 4/3/2025 Approved EVAN COOPER
Shower Pan 4/3/2025 Approved EVAN COOPER
Drywall Nailing 4/14/2025 Approved ARAM AVEDISIAN
Interior/Exterior Lathing 5/20/2025 Approved EVAN COOPER
ELECTRICAL-Final 10/23/2025 Approved EVAN COOPER
Final 10/23/2025 OK to Issue CofO EVAN COOPER
Footing/Foundation/Slab 10/23/2025 Approved EVAN COOPER
Green Building Final 10/23/2025 Approved EVAN COOPER
HVAC-Final 10/23/2025 Approved EVAN COOPER
PLUMBING-Final 10/23/2025 Approved EVAN COOPER
SGSOV-Seismic Gas S/O Valve 10/23/2025 SGSOV Approved EVAN COOPER
Smoke Detectors 10/23/2025 Approved EVAN COOPER