7052 N BELLAIRE AVE 91605

Certificate Information: 7052 N BELLAIRE AVE 91605

Application / Permit
24014-20000-00446
Plan Check / Job No.
B24VN01342
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
INTERIOR REMODEL TO EXISTING SINGLE-FAMILY DWELLING WITH NEW 14'-5" X 14'-6" ADDITION TO EXISTING SINGLE-FAMILY DWELLING.
Permit Issued
Issued on 2/7/2024
Issuing Office
Valley
Current Status
CofO Issued on 6/22/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 2/1/2024 APPLICANT
Assigned to Plan Check Engineer 2/1/2024 ALEC MOUSAKHANIAN
Corrections Issued 2/1/2024 ALEC MOUSAKHANIAN
Plan Check Approved 2/7/2024 GIOVANNY CHAVEZ
Issued 2/7/2024 APPLICANT
CofO in Progress 5/20/2024 ROBERTO PALACIOS-LOPEZ
Permit Finaled 6/22/2024 RUBEN SALAS
CofO Issued 6/22/2024 RUBEN SALAS
Permit Finaled 6/22/2024 RUBEN SALAS

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 2/5/2024 COLIN LOREDO
Roof/Waste drainage to street Cleared 2/5/2024 COLIN LOREDO
Sewer availability Cleared 2/5/2024 COLIN LOREDO

Contact Information

Contractor Ybarra Professional Builders; Lic. No.: 334090-B 11801 PIERCE STREET STE 200      RIVERSIDE, CA 92587
Engineer Wu,, Harold Ping-Hung; Lic. No.: C35693 1168 SAN GABRIEL BLVD NO N      ROSEMEAD, CA 91770

Inspector Information

WAYNE REGESTER, (818) 374-1164 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 2/22/2024 Corrections Issued JOSE AVILA
Deputy Drilled-In Anchors 2/23/2024 Conditional Approval JUAN VALENZUELA
Excavation/Setback/Form/Re-Bar 2/26/2024 No Access for Inspection JOSE AVILA
Footing/Foundation/Slab 2/27/2024 Corrections Issued JOSE AVILA
Footing/Foundation/Slab 3/5/2024 Approved JOSE AVILA
Underground Mechanical 3/5/2024 Partial Inspection JOSE AVILA
Floor/Roof Diaphrgm/Shear Wall 3/6/2024 No Access for Inspection JOSE AVILA
Floor/Roof Diaphrgm/Shear Wall 3/11/2024 Corrections Issued SALVADOR MARTINEZ
Floor/Roof Diaphrgm/Shear Wall 3/15/2024 Approved JOSE AVILA
ELECTRICAL-Rough 3/19/2024 Corrections Issued JOSE AVILA
Floor/Roof Diaphrgm/Shear Wall 3/19/2024 Approved JOSE AVILA
HVAC-Rough 3/19/2024 Approved JOSE AVILA
PLUMBING-Rough 3/19/2024 Approved JOSE AVILA
BUILDING-Rough-Frame 3/22/2024 Corrections Issued ROBERTO PALACIOS-LOPEZ
ELECTRICAL-Rough 3/22/2024 Approved ROBERTO PALACIOS-LOPEZ
Green Building Rough 3/22/2024 Approved ROBERTO PALACIOS-LOPEZ
Insulation 3/28/2024 Corrections Issued ROBERTO PALACIOS-LOPEZ
BUILDING-Rough-Frame 4/1/2024 Approved ROBERTO PALACIOS-LOPEZ
Insulation 4/1/2024 Approved ROBERTO PALACIOS-LOPEZ
Drywall Nailing 4/4/2024 Approved ROBERTO PALACIOS-LOPEZ
Final 4/22/2024 Corrections Issued ROBERTO PALACIOS-LOPEZ
Green Building Final 4/22/2024 Corrections Issued ROBERTO PALACIOS-LOPEZ
SGSOV-Seismic Gas S/O Valve 4/22/2024 SGSOV Approved ROBERTO PALACIOS-LOPEZ
Smoke Detectors 4/22/2024 Corrections Issued ROBERTO PALACIOS-LOPEZ
Final 4/25/2024 No Access for Inspection ROBERTO PALACIOS-LOPEZ
Green Building Final 4/25/2024 No Access for Inspection ROBERTO PALACIOS-LOPEZ
Smoke Detectors 4/25/2024 No Access for Inspection ROBERTO PALACIOS-LOPEZ
Final 5/6/2024 Corrections Issued ROBERTO PALACIOS-LOPEZ
Green Building Final 5/6/2024 Corrections Issued ROBERTO PALACIOS-LOPEZ
Smoke Detectors 5/6/2024 Corrections Issued ROBERTO PALACIOS-LOPEZ
ELECTRICAL-Final 5/10/2024 Approved ROBERTO PALACIOS-LOPEZ
Final 5/10/2024 Corrections Issued ROBERTO PALACIOS-LOPEZ
Green Building Final 5/10/2024 Corrections Issued ROBERTO PALACIOS-LOPEZ
HVAC-Final 5/10/2024 Approved ROBERTO PALACIOS-LOPEZ
PLUMBING-Final 5/10/2024 Approved ROBERTO PALACIOS-LOPEZ
Smoke Detectors 5/10/2024 Approved ROBERTO PALACIOS-LOPEZ
Final 5/20/2024 OK to Issue CofO ROBERTO PALACIOS-LOPEZ
Green Building Final 5/20/2024 Approved ROBERTO PALACIOS-LOPEZ