1169 N COMMONWEALTH AVE 90029

Certificate Information: 1169 N COMMONWEALTH AVE 90029

Application / Permit
24014-10000-05635
Plan Check / Job No.
B24LA37267
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
ADDITION AND REMODEL TO (E) SINGLE FAMILY DWELLING. FIRE SPRINKLER 13D THROUGH OUT.
Permit Issued
Issued on 4/21/2025
Issuing Office
Metro
Current Status
Issued on 4/21/2025
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 12/20/2024 APPLICANT
Assigned to Plan Check Engineer 1/9/2025 DANIEL YIP
Corrections Issued 1/15/2025 DANIEL YIP
Quality Review Completed 1/22/2025 KEN GILL
Building Plans Picked Up 1/23/2025 APPLICANT
Plan Check Approved 2/10/2025 DANIEL YIP
Issued 4/21/2025 APPLICANT

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 1/23/2025 JESSICA OPINION
Sewer availability Cleared 1/23/2025 JESSICA OPINION
Grading Pre-Inspection Cleared 1/27/2025 JONATHAN HOM
Roof/Waste drainage to street Cleared 1/30/2025 CHRISTINA BRACO
GPI Written Notices Cleared 2/10/2025 DANIEL YIP

Contact Information

Contractor Building In Harmony Inc; Lic. No.: 1068062-B 6528 AMIGO AVE      RESEDA, CA 91335
Engineer Phillips,, Craig; Lic. No.: C69673 2123 VESTAL AVE      LOS ANGELES, CA 90026

Inspector Information

FREDDIE RIVERA, (213) 202-3437 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 6/2/2025 Conditional Approval FREDDIE RIVERA
Footing/Foundation/Slab 6/4/2025 Corrections Issued FREDDIE RIVERA
Excavation/Setback/Form/Re-Bar 6/5/2025 Conditional Approval FREDDIE RIVERA
Special/Order Compliance 6/5/2025 Corrections Issued FREDDIE RIVERA
Floor/Roof Diaphrgm/Shear Wall 6/24/2025 Partial Approval FREDDIE RIVERA
Floor/Roof Diaphrgm/Shear Wall 6/30/2025 Not Ready for Inspection WILLIAM SIERRA
Floor/Roof Diaphrgm/Shear Wall 7/7/2025 Partial Approval FREDDIE RIVERA
Wood Frame 7/22/2025 Partial Approval FREDDIE RIVERA
ELECTRICAL-Rough 8/12/2025 Approved FREDDIE RIVERA
HVAC-Rough 8/12/2025 Corrections Issued FREDDIE RIVERA
PLUMBING-Rough 8/12/2025 Corrections Issued FREDDIE RIVERA
ELECTRICAL-Rough 8/13/2025 Approved FREDDIE RIVERA
HVAC-Rough 8/13/2025 Partial Inspection FREDDIE RIVERA
PLUMBING-Rough 8/13/2025 Approved FREDDIE RIVERA
Pre-Inspection 8/13/2025 Corrections Issued FREDDIE RIVERA
Interior/Exterior Lathing 8/27/2025 Partial Approval FREDDIE RIVERA
Wood Frame 8/29/2025 Corrections Issued FREDDIE RIVERA
Wood Frame 9/3/2025 Partial Approval FREDDIE RIVERA
BUILDING-Rough-Frame 9/5/2025 Approved FREDDIE RIVERA
Green Building Rough 9/5/2025 Approved FREDDIE RIVERA
Insulation 9/5/2025 Corrections Issued FREDDIE RIVERA
Drywall Nailing 9/15/2025 Approved ALEX COLIN
Interior/Exterior Lathing 10/6/2025 Approved ALEX COLIN
Shower Pan 10/6/2025 Approved ALEX COLIN
Final 12/15/2025 Corrections Issued FREDDIE RIVERA
Footing/Foundation/Slab 12/15/2025 Approved FREDDIE RIVERA
Green Building Final 12/15/2025 Partial Inspection FREDDIE RIVERA
SGSOV-Seismic Gas S/O Valve 12/15/2025 SGSOV Not Ready FREDDIE RIVERA
Smoke Detectors 12/15/2025 Partial Inspection FREDDIE RIVERA
SGSOV-Seismic Gas S/O Valve 12/22/2025 SGSOV Not Ready FREDDIE RIVERA
SGSOV-Seismic Gas S/O Valve 1/14/2026 SGSOV Not Ready FREDDIE RIVERA
Deck 1/20/2026 Partial Inspection FREDDIE RIVERA
Final 1/20/2026 Corrections Issued FREDDIE RIVERA
SGSOV-Seismic Gas S/O Valve 1/20/2026 SGSOV Approved FREDDIE RIVERA
Verify Sprinkler Sign Off 1/20/2026 Corrections Issued FREDDIE RIVERA
Final 4/13/2026 Partial Inspection FREDDIE RIVERA
Green Building Final 4/13/2026 Approved FREDDIE RIVERA
Smoke Detectors 4/13/2026 Approved FREDDIE RIVERA
Special/Order Compliance 4/13/2026 Not Ready for Inspection GEM DE OCAMPO
Final 5/5/2026 No Access for Inspection FREDDIE RIVERA
Final 5/12/2026 Conditional Approval FREDDIE RIVERA
Service/Power Release 5/12/2026 Approved FREDDIE RIVERA