755 N KENTER AVE 90049

Certificate Information: 755 N KENTER AVE 90049

Application / Permit
24014-10000-04906
Plan Check / Job No.
B24LA30187
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
REAR ADDITION AND REMODEL TO EXISTING ONE STORY HILLSIDE SINGLE FAMILY DWELLING WITH ATTACHED GARAGE PER ENGINEER DESIGN
Permit Issued
Issued on 11/21/2024
Issuing Office
Metro
Current Status
CofO Issued on 6/26/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 11/1/2024 APPLICANT
Assigned to Plan Check Engineer 11/7/2024 ADAM HEGAZI
Corrections Issued 11/9/2024 ADAM HEGAZI
Building Plans Picked Up 11/13/2024 APPLICANT
Plan Check Approved 11/21/2024 ADAM HEGAZI
Issued 11/21/2024 APPLICANT
CofO in Progress 5/19/2025 KEVIN SARGSYAN
Permit Finaled 6/26/2025 RICHARD STEINBACH
CofO Issued 6/26/2025 RICHARD STEINBACH
Permit Finaled 6/26/2025 RICHARD STEINBACH

Permit Application Clearance Information

Grading Pre-Inspection Cleared 11/13/2024 VASIL MIHALEV
Eng Process Fee Ord 176,300 Cleared 11/14/2024 KIMBERLY HERNANDEZ
Roof/Waste drainage to street Cleared 11/14/2024 DIANA RENTERIA
Miscellaneous Cleared 11/15/2024 VLADIMIR ARUTYUNYAN
Hold Cleared 12/17/2024 MARIA VENDIVIL

Contact Information

Contractor Diversified Build; Lic. No.: 1033675-B 4871 W WASHINGTON BLVD      LOS ANGELES, CA 90019
Engineer Maalouf,, Sami; Lic. No.: C53210 15445 VENTURA BLVD STE 367      SHERMAN OAKS, CA 91403

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 11/27/2024 Approved JESUS RODRIGUEZ
Deputy Wood Construction 12/18/2024 Conditional Approval KEVIN SARGSYAN
ELECTRICAL-Rough 12/19/2024 Corrections Issued KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 12/19/2024 Corrections Issued KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 12/23/2024 Corrections Issued KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 12/26/2024 Approved JESUS RODRIGUEZ
Interior/Exterior Lathing 1/3/2025 Corrections Issued KEVIN SARGSYAN
ELECTRICAL-Rough 1/28/2025 Approved KEVIN SARGSYAN
Green Building Rough 1/28/2025 Approved KEVIN SARGSYAN
Interior/Exterior Lathing 1/28/2025 Approved KEVIN SARGSYAN
BUILDING-Rough-Frame 1/29/2025 Corrections Issued KEVIN SARGSYAN
Insulation 1/29/2025 Corrections Issued KEVIN SARGSYAN
BUILDING-Rough-Frame 1/31/2025 Conditional Approval JESUS RODRIGUEZ
HVAC-Rough 1/31/2025 Approved JESUS RODRIGUEZ
Insulation 1/31/2025 Approved JESUS RODRIGUEZ
Drywall Nailing 2/3/2025 Approved KEVIN SARGSYAN
ELECTRICAL-Final 4/23/2025 Corrections Issued HERBERT GIRON
HVAC-Final 4/23/2025 Corrections Issued HERBERT GIRON
HVAC-Final 5/7/2025 Approved KEVIN SARGSYAN
BUILDING-Rough-Frame 5/19/2025 Approved KEVIN SARGSYAN
ELECTRICAL-Final 5/19/2025 Approved KEVIN SARGSYAN
Final 5/19/2025 OK to Issue CofO KEVIN SARGSYAN
Green Building Final 5/19/2025 Approved KEVIN SARGSYAN
SGSOV-Seismic Gas S/O Valve 5/19/2025 SGSOV Approved KEVIN SARGSYAN
Smoke Detectors 5/19/2025 Approved KEVIN SARGSYAN