4783 E TEMPLETON ST 90032

Certificate Information: 4783 E TEMPLETON ST 90032

Application / Permit
24014-10000-04897
Plan Check / Job No.
B24LA30159
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
ePlan. 1-story addition to rear side of (e) single story SFD ; add stair and landing at rear side
Permit Issued
Issued on 10/7/2025
Issuing Office
Current Status
Issued on 10/7/2025
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 11/6/2024 APPLICANT
Assigned to Plan Check Engineer 11/8/2024 REZA HAGHIGHAT
Corrections Issued 11/11/2024 REZA HAGHIGHAT
Applicant returned to address corrections 4/7/2025 REZA HAGHIGHAT
Plan Check Approved 7/18/2025 REZA HAGHIGHAT
No Progress 7/24/2025 REZA HAGHIGHAT
Plan Check Approved 7/24/2025 REZA HAGHIGHAT
Issued 10/7/2025 APPLICANT

Permit Application Clearance Information

Grading Pre-Inspection Cleared 11/14/2024 MICHAEL TEMPLE
Roof/Waste drainage to street Cleared 5/1/2025 LEE GUILBEAUX
Sewer availability Cleared 5/1/2025 LEE GUILBEAUX
Public Works-Highway Ded. Cleared 5/1/2025 LEE GUILBEAUX
Eng Process Fee Ord 176,300 Cleared 5/3/2025 LEE GUILBEAUX
Hydrant and Access approval Cleared 5/15/2025 JERRY KAO
"D" conditions Cleared 5/16/2025 DAVID URITA
"Q" conditions Cleared 5/16/2025 DAVID URITA
ZI Cleared 5/16/2025 DAVID URITA
Disturb/Remove Protected Trees Cleared 7/15/2025 BRANDON WONG

Contact Information

Contractor Owner-Builder       ,
Engineer Dominguez,, Refugio; Lic. No.: C50820 254 COTTONWOOD ST      ONTARIO, CA 91761

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 1/5/2026 Partial Approval DAVID WILLIAMS
Deputy Drilled-In Anchors 1/16/2026 Conditional Approval GEM DE OCAMPO
Excavation/Setback/Form/Re-Bar 1/20/2026 Corrections Issued LILIANA PORTILLO
BUILDING-Rough-Frame 2/6/2026 Partial Approval LILIANA PORTILLO
PLUMBING-Rough 2/6/2026 Partial Approval LILIANA PORTILLO
Floor/Roof Diaphrgm/Shear Wall 2/10/2026 Partial Approval LILIANA PORTILLO
Insulation 2/10/2026 Not Ready for Inspection LILIANA PORTILLO
Floor/Roof Diaphrgm/Shear Wall 3/4/2026 Approved LILIANA PORTILLO
ELECTRICAL-Rough 3/13/2026 Corrections Issued LILIANA PORTILLO
PLUMBING-Rough 3/13/2026 Corrections Issued LILIANA PORTILLO
ELECTRICAL-Rough 3/19/2026 Approved LILIANA PORTILLO
HVAC-Rough 3/19/2026 Corrections Issued LILIANA PORTILLO
PLUMBING-Rough 3/19/2026 Approved LILIANA PORTILLO
BUILDING-Rough-Frame 3/27/2026 Conditional Approval LILIANA PORTILLO
HVAC-Rough 3/27/2026 Approved LILIANA PORTILLO
Insulation 4/6/2026 Approved GEM DE OCAMPO
Drywall Nailing 4/14/2026 Corrections Issued LILIANA PORTILLO
Shower Pan 4/14/2026 Approved LILIANA PORTILLO
Interior/Exterior Lathing 4/30/2026 Approved ALIZAH MAYAGOITIA
Shower Pan 4/30/2026 Approved ALIZAH MAYAGOITIA