929 E 2ND ST 90012

Certificate Information: 929 E 2ND ST 90012

Application / Permit
24014-10000-04650
Plan Check / Job No.
B24LA27662
Group
Building
Type
Bldg-Addition
Sub-Type
Commercial
Primary Use
(13) Office
Work Description
NDC -5689 Mandatory seismic retrofit of existing non-ductile concrete building per ordinance and CORE AND SHELL, CHANGE OF USE FROM ARTIST RESIDENCE (14 UNITS) TO OFFICE WITH 3RD FLOOR ADDITION AND NDC SEISMIC RETROFIT FOR NEW ART GALLERY INCLUDING NEW EXTERIOR WINDOWS AND DOORS, ACCESSIBLE ENTRIES, ACCESSIBLE RESTROOMS, INTERIOR ACCESSIBLE RAMPS AND STAIRS, INTERIOR ELECTRICAL ROOM AND EXTERIOR TRANSFORMER, AND EGRESS LIGHTING.
Permit Issued
Issued on 3/20/2026
Issuing Office
Metro
Current Status
Issued on 3/20/2026
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 10/17/2024 APPLICANT
Assigned to Zoning Architect 10/17/2024 CALEB WONG
Assigned to Plan Check Engineer 10/23/2024 FARSHAD ALIMOHAMADI
Green Plans Picked Up 10/25/2024 APPLICANT
Corrections Issued 11/7/2024 FARSHAD ALIMOHAMADI
Quality Review Completed 11/22/2024 DANIEL CHAN
Building Plans Picked Up 11/25/2024 APPLICANT
Applicant returned to address corrections 12/2/2024 FARSHAD ALIMOHAMADI
Applicant returned to address corrections 12/3/2024 FARSHAD ALIMOHAMADI
Applicant returned to address corrections 1/28/2025 FARSHAD ALIMOHAMADI
Applicant returned to address corrections 2/21/2025 FARSHAD ALIMOHAMADI
Applicant returned to address corrections 3/5/2025 FARSHAD ALIMOHAMADI
Applicant returned to address corrections 5/9/2025 FARSHAD ALIMOHAMADI
Applicant returned to address corrections 11/18/2025 FARSHAD ALIMOHAMADI
Applicant returned to address corrections 12/1/2025 FARSHAD ALIMOHAMADI
Plan Check Approved 3/18/2026 FARSHAD ALIMOHAMADI
Issued 3/20/2026 APPLICANT

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 11/19/2024 JESSICA OPINION
ZA Case Cleared 12/4/2024 DALIA MOKAYED
ZA Case Cleared 12/4/2024 DALIA MOKAYED
ZA Case Cleared 12/4/2024 DALIA MOKAYED
Miscellaneous Cleared 1/14/2025 DALIA MOKAYED
Miscellaneous Cleared 1/14/2025 DALIA MOKAYED
Green Code Cleared 1/28/2025 AARON COSTA
Sewer availability Cleared 2/11/2025 CHRISTINA BRACO
DAS Clearance Cleared 6/25/2025 FARSHAD ALIMOHAMADI
Fire Marshal Fire Life Safety Cleared 8/1/2025 SARAH ZHANG
Highway dedication Cleared 9/25/2025 ADRIAN SANCHEZ
Low Impact Development (LID) Cleared 10/30/2025 ORVAL HERNANDEZ-MARCI
Roof/Waste drainage to street Cleared 11/3/2025 LEE GUILBEAUX
"Q" conditions Cleared 3/6/2026 YINGSHI HUANG
CPC Cleared 3/6/2026 YINGSHI HUANG
Miscellaneous Cleared 3/6/2026 YINGSHI HUANG
ZA Case Cleared 3/6/2026 YINGSHI HUANG
Zoning Plan Check Cleared 3/9/2026 CALEB WONG

Contact Information

Architect , ; Lic. No.: C34801       ,
Contractor Canyon Builders Llc; Lic. No.: 1138796-B 308 E 9TH STREET 306      LOS ANGELES, CA 90015
Engineer Rosewitz,, James; Lic. No.: C80536 235 MONTGOMERY STREET, SUITE 1250      SAN FRANCISCO, CA 94104

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 3/25/2026 Conditional Approval DARRYL ARNOLD
Deputy Drilled-In Anchors 3/26/2026 Conditional Approval DARRYL ARNOLD
Deputy Drilled-In Anchors 4/7/2026 Conditional Approval DARRYL ARNOLD
Deputy Reinf. Concrete 4/7/2026 Conditional Approval DARRYL ARNOLD
Excavation/Setback/Form/Re-Bar 4/7/2026 Approved DARRYL ARNOLD
Deputy Drilled-In Anchors 4/8/2026 Conditional Approval DARRYL ARNOLD
Deputy Reinf. Concrete 4/8/2026 Conditional Approval DARRYL ARNOLD
Excavation/Setback/Form/Re-Bar 4/21/2026 Conditional Approval DARRYL ARNOLD
Footing/Foundation/Slab 4/21/2026 Conditional Approval DARRYL ARNOLD
METHANE-Barrier 4/21/2026 Conditional Approval DARRYL ARNOLD
METHANE-Subgrade 4/21/2026 Conditional Approval DARRYL ARNOLD
Deputy Reinf. Concrete 4/22/2026 Conditional Approval DARRYL ARNOLD
Deputy Drilled-In Anchors 5/28/2026 Conditional Approval DARRYL ARNOLD
Excavation/Setback/Form/Re-Bar 6/5/2026 No Result Entered ALFREDO LOPEZ
Footing/Foundation/Slab 6/5/2026 No Result Entered ALFREDO LOPEZ
METHANE-Barrier 6/5/2026 No Result Entered ALFREDO LOPEZ
METHANE-Subgrade 6/5/2026 No Result Entered ALFREDO LOPEZ