4830 S VAN NESS AVE 90062

Certificate Information: 4830 S VAN NESS AVE 90062

Application / Permit
24014-10000-04264
Plan Check / Job No.
B24LA23836
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
EPLAN: New irregular shaped addition of 22' 6" x 23' to detached garage to create a 22' 6" x 23' ADU per LAMC 12.22 A.33(b)(1)3. All work per engineer.
Permit Issued
Issued on 5/1/2025
Issuing Office
Current Status
CofO Issued on 3/13/2026
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 9/23/2024 APPLICANT
Assigned to Plan Check Engineer 9/27/2024 MIROOSH KHACHATOORIAN
Corrections Issued 9/30/2024 MIROOSH KHACHATOORIAN
Applicant returned to address corrections 1/16/2025 DANIEL ABRAMYAN
Plan Check Approved 2/5/2025 NAREG ATARIAN
Issued 5/1/2025 APPLICANT
CofO in Progress 3/13/2026 SABAS ALONSO
Permit Finaled 3/13/2026 DEROLD HAUFF
CofO Issued 3/13/2026 DEROLD HAUFF
Permit Finaled 3/13/2026 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 12/24/2024 JUSTIN BICOL
Roof/Waste drainage to street Cleared 12/24/2024 JUSTIN BICOL
Eng Process Fee Ord 176,300 Cleared 12/30/2024 JUSTIN BICOL
Sewer availability Cleared 12/30/2024 JUSTIN BICOL
Construction near power lines Cleared 1/8/2025 RIDWAN HARDY

Contact Information

Contractor Dhs Ventures Inc; Lic. No.: 1047699-B       ,
Contractor La Ccs; Lic. No.: 1047699-B       ,
Engineer Vartanian,, Albert; Lic. No.: C39989 1250 W GLENOAKS BLVD E355      GLENDALE, CA 91201

Inspector Information

SABAS ALONSO, (213) 202-3468 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 5/8/2025 Approved MICHAEL LEWIS
Pre-Inspection 5/19/2025 Partial Inspection SABAS ALONSO
PLUMBING-Rough 6/3/2025 Corrections Issued JOHN QUINTANILLA
Deputy Drilled-In Anchors 6/9/2025 Conditional Approval SABAS ALONSO
Footing/Foundation/Slab 6/9/2025 Corrections Issued SABAS ALONSO
Footing/Foundation/Slab 6/11/2025 Corrections Issued LUIS CASTRO
PLUMBING-Rough 6/11/2025 Approved LUIS CASTRO
Footing/Foundation/Slab 6/12/2025 Approved LUIS CASTRO
BUILDING-Rough-Frame 8/8/2025 Corrections Issued SABAS ALONSO
Underground Mechanical 8/8/2025 Corrections Issued SABAS ALONSO
Floor/Roof Diaphrgm/Shear Wall 8/25/2025 Approved BARRY HACHE
Green Building Rough 8/25/2025 Not Ready for Inspection BARRY HACHE
Shower Pan 8/25/2025 Approved BARRY HACHE
Interior/Exterior Lathing 8/29/2025 Partial Approval BARRY HACHE
Pre-Inspection 10/7/2025 Partial Inspection SABAS ALONSO
Service/Power Release 10/10/2025 Conditional Approval SABAS ALONSO
Underground Mechanical 10/10/2025 Partial Approval SABAS ALONSO
BUILDING-Rough-Frame 10/20/2025 Approved SABAS ALONSO
ELECTRICAL-Rough 10/20/2025 Approved SABAS ALONSO
Green Building Rough 10/20/2025 Corrections Issued SABAS ALONSO
PLUMBING-Rough 10/20/2025 Approved SABAS ALONSO
Sewer 10/20/2025 Approved SABAS ALONSO
Shower Pan 10/20/2025 Corrections Issued SABAS ALONSO
Insulation 10/22/2025 Approved SABAS ALONSO
Drywall Nailing 10/24/2025 Approved ALEX COLIN
Green Building Rough 10/24/2025 Approved ALEX COLIN
Interior/Exterior Lathing 10/24/2025 Not Ready for Inspection ALEX COLIN
Interior/Exterior Lathing 10/27/2025 Not Ready for Inspection ANTHONY RAMOS
Interior/Exterior Lathing 10/30/2025 Approved SABAS ALONSO
Final 12/4/2025 Corrections Issued SABAS ALONSO
Green Building Final 12/4/2025 Approved SABAS ALONSO
SGSOV-Seismic Gas S/O Valve 12/4/2025 SGSOV Not Ready SABAS ALONSO
Smoke Detectors 12/4/2025 Approved SABAS ALONSO
Final 12/16/2025 Corrections Issued SABAS ALONSO
SGSOV-Seismic Gas S/O Valve 12/16/2025 SGSOV Approved SABAS ALONSO
Final 1/2/2026 Not Ready for Inspection SABAS ALONSO
Service/Power Release 1/2/2026 Approved SABAS ALONSO
Final 1/5/2026 Corrections Issued SABAS ALONSO
Final 3/12/2026 OK to Issue CofO SABAS ALONSO