1928 W 65TH PL 90047

Certificate Information: 1928 W 65TH PL 90047

Application / Permit
24014-10000-03123
Plan Check / Job No.
B24LA13744
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
Converting an existing (12'0"x16'0") detached garage with an existing (18'4"x20'0") unpermitted structure built prior to 2020 to a (30'4"x20'0") Accessory Dwelling Unit PER GC 66322(b). Reframe roof from flat to pitch.
Permit Issued
Issued on 3/20/2025
Issuing Office
South Los Angeles
Current Status
CofO Issued on 2/14/2026
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 7/17/2024 APPLICANT
Assigned to Plan Check Engineer 7/18/2024 MINA HABILI
Corrections Issued 7/19/2024 MINA HABILI
Building Plans Picked Up 7/30/2024 APPLICANT
Plan Check Approved 3/6/2025 RICARDO RAMIREZ
Issued 3/20/2025 APPLICANT
CofO in Progress 2/13/2026 BARRY HACHE
Permit Finaled 2/14/2026 DEROLD HAUFF
CofO Issued 2/14/2026 DEROLD HAUFF
Permit Finaled 2/14/2026 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 11/12/2024 ADRIAN SANCHEZ
Roof/Waste drainage to street Cleared 11/12/2024 ADRIAN SANCHEZ
Construction within easement Cleared 12/18/2024 RIDWAN HARDY
Eng Process Fee Ord 176,300 Cleared 2/5/2025 DAVID VO
Sewer availability Cleared 2/5/2025 DAVID VO

Contact Information

Contractor Owner-Builder       ,
Engineer Hamilton,, John O; Lic. No.: C53284 P O BOX 1543      HAWTHORNE, CA 90251

Inspector Information

BARRY HACHE, (213) 202-9851 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 5/1/2025 Approved BARRY HACHE
Deputy Drilled-In Anchors 5/13/2025 Conditional Approval ANTHONY RAMOS
Footing/Foundation/Slab 5/28/2025 Corrections Issued BARRY HACHE
PLUMBING-Rough 5/28/2025 Corrections Issued BARRY HACHE
Footing/Foundation/Slab 6/2/2025 Partial Approval BARRY HACHE
PLUMBING-Rough 6/2/2025 Approved BARRY HACHE
Underground Mechanical 6/17/2025 Corrections Issued BARRY HACHE
Underground Mechanical 6/23/2025 Approved BARRY HACHE
Rough-Elec/Plmb/HVAC 8/11/2025 Corrections Issued WAYNE REGESTER
ELECTRICAL-Rough 8/15/2025 Corrections Issued BARRY HACHE
HVAC-Rough 8/15/2025 Corrections Issued BARRY HACHE
PLUMBING-Rough 8/15/2025 Corrections Issued BARRY HACHE
ELECTRICAL-Rough 8/22/2025 Not Ready for Inspection BARRY HACHE
PLUMBING-Rough 8/22/2025 Corrections Issued BARRY HACHE
Floor/Roof Diaphrgm/Shear Wall 8/29/2025 Corrections Issued BARRY HACHE
Rough-Elec/Plmb/HVAC 8/29/2025 Approved BARRY HACHE
Floor/Roof Diaphrgm/Shear Wall 9/5/2025 Corrections Issued BARRY HACHE
Floor/Roof Diaphrgm/Shear Wall 9/23/2025 Partial Approval BARRY HACHE
BUILDING-Rough-Frame 10/1/2025 Not Ready for Inspection BARRY HACHE
Floor/Roof Diaphrgm/Shear Wall 10/1/2025 Not Ready for Inspection BARRY HACHE
Interior/Exterior Lathing 10/1/2025 Corrections Issued BARRY HACHE
BUILDING-Rough-Frame 10/7/2025 Corrections Issued BARRY HACHE
Floor/Roof Diaphrgm/Shear Wall 10/7/2025 Corrections Issued BARRY HACHE
Green Building Rough 10/7/2025 Approved BARRY HACHE
BUILDING-Rough-Frame 10/9/2025 Not Ready for Inspection RAUL BARAJAS
Insulation 10/14/2025 Corrections Issued DEVON JACKSON
BUILDING-Rough-Frame 10/16/2025 Approved ANTHONY RAMOS
Insulation 10/16/2025 Approved ANTHONY RAMOS
Drywall Nailing 10/23/2025 Corrections Issued BARRY HACHE
Drywall Nailing 10/28/2025 Approved BARRY HACHE
Interior/Exterior Lathing 11/10/2025 Not Ready for Inspection BARRY HACHE
Shower Pan 11/10/2025 Approved BARRY HACHE
Footing/Foundation/Slab 12/17/2025 Approved BARRY HACHE
HVAC-Final 12/17/2025 Corrections Issued BARRY HACHE
SGSOV-Seismic Gas S/O Valve 12/17/2025 SGSOV Not Ready BARRY HACHE
HVAC-Final 1/8/2026 Approved BARRY HACHE
PLUMBING-Final 1/8/2026 Corrections Issued BARRY HACHE
SGSOV-Seismic Gas S/O Valve 1/8/2026 SGSOV Approved BARRY HACHE
ELECTRICAL-Final 1/12/2026 Corrections Issued BARRY HACHE
Final 1/12/2026 Corrections Issued BARRY HACHE
PLUMBING-Final 1/12/2026 Approved BARRY HACHE
Smoke Detectors 1/12/2026 Approved BARRY HACHE
ELECTRICAL-Final 1/13/2026 Not Ready for Inspection BARRY HACHE
ELECTRICAL-Final 1/15/2026 Approved BARRY HACHE
Final 1/15/2026 Not Ready for Inspection BARRY HACHE
Green Building Final 1/15/2026 Approved BARRY HACHE
Final 1/22/2026 Not Ready for Inspection BARRY HACHE
Final 2/5/2026 Corrections Issued BARRY HACHE
Final 2/13/2026 OK to Issue CofO BARRY HACHE