4317 1/2 N GUARDIA AVE 90032

Certificate Information: 4317 1/2 N GUARDIA AVE 90032

Application / Permit
24014-10000-02984
Plan Check / Job No.
B24LA13077
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
ePlan: convert existing detached garage with addtion to ADU per engineer details (1,200 SF max per Ordinance, LAMC 12.22 A.33 (c)-(d))
Permit Issued
Issued on 8/22/2024
Issuing Office
Current Status
CofO Issued on 2/23/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 7/9/2024 APPLICANT
Assigned to Plan Check Engineer 7/12/2024 AUNG SOE
Corrections Issued 7/15/2024 AUNG SOE
Applicant returned to address corrections 7/31/2024 AUNG SOE
Plan Check Approved 8/19/2024 AUNG SOE
Issued 8/22/2024 APPLICANT
CofO in Progress 2/20/2025 ALIZAH MAYAGOITIA
Permit Finaled 2/23/2025 DEROLD HAUFF
CofO Issued 2/23/2025 DEROLD HAUFF
Permit Finaled 2/23/2025 DEROLD HAUFF

Permit Application Clearance Information

Grading Pre-Inspection Cleared 7/23/2024 ALEXANDER HELFER
Address approval Cleared 7/25/2024 DAVID LOPEZ
Eng Process Fee Ord 176,300 Cleared 7/25/2024 DAVID LOPEZ
Roof/Waste drainage to street Cleared 7/25/2024 DAVID LOPEZ
Sewer availability Cleared 7/25/2024 DAVID LOPEZ
GPI Written Notices Cleared 8/19/2024 AUNG SOE

Contact Information

Contractor Gibson Norma Leyva; Lic. No.: 333765-B       ,
Contractor R & Rc Construction; Lic. No.: 333765-B       ,
Engineer Solis,, Armando; Lic. No.: C72012 708 S WASHINGTON AVE      FULLERTON, CA 92832

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 9/16/2024 Conditional Approval ALIZAH MAYAGOITIA
Underground Mechanical 9/16/2024 Partial Approval ROY SPAULDING
Footing/Foundation/Slab 9/18/2024 Approved WILLIAM SIERRA
Floor/Roof Diaphrgm/Shear Wall 10/1/2024 Corrections Issued LILIANA PORTILLO
Deputy Wood Construction 10/3/2024 Conditional Approval LILIANA PORTILLO
ELECTRICAL-Rough 10/18/2024 Approved LILIANA PORTILLO
Floor/Roof Diaphrgm/Shear Wall 10/18/2024 Approved LILIANA PORTILLO
PLUMBING-Rough 10/18/2024 Corrections Issued LILIANA PORTILLO
BUILDING-Rough-Frame 10/23/2024 Corrections Issued LILIANA PORTILLO
ELECTRICAL-Rough 10/23/2024 Approved LILIANA PORTILLO
HVAC-Rough 10/23/2024 Corrections Issued LILIANA PORTILLO
PLUMBING-Rough 10/23/2024 Approved LILIANA PORTILLO
Underground Mechanical 10/23/2024 Corrections Issued LILIANA PORTILLO
Verify Sprinkler Sign Off 10/23/2024 Approved LILIANA PORTILLO
Insulation 10/28/2024 Corrections Issued BRENDAN MORELLI
Drywall Nailing 10/31/2024 Approved LUIS CASTRO
Interior/Exterior Lathing 10/31/2024 Approved LUIS CASTRO
ELECTRICAL-Rough 11/4/2024 Corrections Issued LILIANA PORTILLO
Shower Pan 11/4/2024 Approved LILIANA PORTILLO
Service/Power Release 11/25/2024 Corrections Issued LILIANA PORTILLO
BUILDING-Rough-Frame 12/18/2024 Approved LILIANA PORTILLO
Final 12/18/2024 Corrections Issued LILIANA PORTILLO
Green Building Final 12/18/2024 Approved LILIANA PORTILLO
Green Building Rough 12/18/2024 Approved LILIANA PORTILLO
SGSOV-Seismic Gas S/O Valve 12/18/2024 SGSOV Not Ready LILIANA PORTILLO
Smoke Detectors 12/18/2024 Approved LILIANA PORTILLO
Final 12/23/2024 Corrections Issued BRENDAN MORELLI
SGSOV-Seismic Gas S/O Valve 12/23/2024 SGSOV Not Ready BRENDAN MORELLI
Final 12/27/2024 Partial Approval ALIZAH MAYAGOITIA
SGSOV-Seismic Gas S/O Valve 12/27/2024 SGSOV Approved ALIZAH MAYAGOITIA
Service/Power Release 12/27/2024 Approved ALIZAH MAYAGOITIA
Final 2/20/2025 OK to Issue CofO ALIZAH MAYAGOITIA