2613 S PATRICIA AVE 90064

Certificate Information: 2613 S PATRICIA AVE 90064

Application / Permit
24014-10000-02123
Plan Check / Job No.
B24LA09387
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
1ST FLOOR ADDITION. ADDITION WILL ENCLOSE THE AREA BETWEEN (E) GARAGE AND (E) SFD, THUS ATTACHING THE BUILDINGS. ADDITION TO GARAGE. NEW 2ND LEVEL TO CREATE A 2-STORY SFD, WITH AN ATTACHED GARAGE. TO BE EQUIPPED WITH NFPA13D FIRE SPRINKLERS THROUGH OUT.
Permit Issued
Issued on 10/2/2024
Issuing Office
Metro
Current Status
CofO Issued on 5/23/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 5/17/2024 APPLICANT
Assigned to Plan Check Engineer 5/30/2024 ADRIANA LOPEZ
Corrections Issued 6/12/2024 ADRIANA LOPEZ
Building Plans Picked Up 6/21/2024 APPLICANT
Quality Review Completed 7/11/2024 CAROLYNN NEPOMUCENO
Applicant returned to address corrections 9/25/2024 ADRIANA LOPEZ
Plan Check Approved 10/1/2024 ADRIANA LOPEZ
No Progress 10/1/2024 ADRIANA LOPEZ
Plan Check Approved 10/1/2024 ADRIANA LOPEZ
Issued 10/2/2024 APPLICANT
CofO in Progress 5/21/2025 ASHLEY THOMPSON
Permit Finaled 5/23/2025 RICHARD STEINBACH
CofO Issued 5/23/2025 RICHARD STEINBACH
Permit Finaled 5/23/2025 RICHARD STEINBACH

Permit Application Clearance Information

Sewer availability Cleared 6/21/2024 DARIN LAM
Specific Plan Cleared 7/4/2024 EDUARDO HERMOSO
Specific Plan Cleared 7/8/2024 KYLE WINSTON
Grading Pre-Inspection Cleared 7/26/2024 VASIL MIHALEV
Eng Process Fee Ord 176,300 Cleared 7/30/2024 DARIN LAM
Roof/Waste drainage to street Cleared 8/26/2024 DARIN LAM
GPI Written Notices Cleared 10/1/2024 ADRIANA LOPEZ

Contact Information

Contractor Owner-Builder       ,
Engineer Ha,, Seungil; Lic. No.: S4164 3454 W 1ST ST      LOS ANGELES, CA 90004

Inspector Information

ASHLEY THOMPSON, (310) 914-3897 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 10/29/2024 Conditional Approval ASHLEY THOMPSON
Excavation/Setback/Form/Re-Bar 10/31/2024 Corrections Issued ASHLEY THOMPSON
Excavation/Setback/Form/Re-Bar 11/1/2024 Approved DANIEL VERA
Floor/Roof Diaphrgm/Shear Wall 12/31/2024 Corrections Issued KIRK SANDERS
PLUMBING-Rough 12/31/2024 Approved KIRK SANDERS
ELECTRICAL-Rough 1/14/2025 Corrections Issued KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 1/14/2025 Corrections Issued KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 1/17/2025 Corrections Issued CARLOS MATAMOROS
HVAC-Rough 1/17/2025 Not Ready for Inspection CARLOS MATAMOROS
Floor/Roof Diaphrgm/Shear Wall 1/18/2025 Approved CARLOS MATAMOROS
HVAC-Rough 1/18/2025 Approved CARLOS MATAMOROS
BUILDING-Rough-Frame 2/25/2025 Corrections Issued EVAN COOPER
ELECTRICAL-Rough 2/25/2025 Corrections Issued EVAN COOPER
Interior/Exterior Lathing 2/25/2025 Partial Approval EVAN COOPER
ELECTRICAL-Rough 2/27/2025 Approved ASHLEY THOMPSON
Floor/Roof Diaphrgm/Shear Wall 2/27/2025 Corrections Issued ASHLEY THOMPSON
BUILDING-Rough-Frame 3/7/2025 Approved BOBBY KEY
Green Building Rough 3/7/2025 Approved BOBBY KEY
Insulation 3/7/2025 Corrections Issued BOBBY KEY
Special/Order Compliance 3/7/2025 Partial Inspection WILBER ROSALES
Verify Sprinkler Sign Off 3/7/2025 Approved BOBBY KEY
Drywall Nailing 3/14/2025 Approved KIRK SANDERS
Final 3/14/2025 Corrections Issued KIRK SANDERS
Final 5/15/2025 Corrections Issued ARAM AVEDISIAN
Footing/Foundation/Slab 5/15/2025 Approved ARAM AVEDISIAN
Green Building Final 5/15/2025 Approved ARAM AVEDISIAN
SGSOV-Seismic Gas S/O Valve 5/15/2025 SGSOV Approved ARAM AVEDISIAN
Smoke Detectors 5/15/2025 Not Ready for Inspection ARAM AVEDISIAN
Final 5/19/2025 OK to Issue CofO ASHLEY THOMPSON
Smoke Detectors 5/19/2025 Approved ASHLEY THOMPSON