7103 N WHITE OAK AVE 91335

Certificate Information: 7103 N WHITE OAK AVE 91335

Application / Permit
24014-10000-02049
Plan Check / Job No.
B24LA09074
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
REMODEL AND CONVERT UNPERMITTED DETACHED STRUCTURE TO ADU WITH ADDITION. Existing construction built prior to Jan 1, 2018 does not pose a threat to the publics health and safety was allowed per Government Code Section 55.852.2(d)(2).
Permit Issued
Issued on 11/25/2024
Issuing Office
Valley
Current Status
CofO Issued on 1/22/2026
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 5/15/2024 APPLICANT
Assigned to Plan Check Engineer 5/21/2024 JOSEPH RAFOLS
Corrections Issued 5/21/2024 JOSEPH RAFOLS
Applicant returned to address corrections 10/22/2024 JOSEPH RAFOLS
Applicant returned to address corrections 10/28/2024 JOSEPH RAFOLS
Applicant returned to address corrections 11/9/2024 MINA HABILI
Plan Check Approved 11/21/2024 MINA HABILI
Issued 11/25/2024 APPLICANT
CofO in Progress 1/13/2026 ARUTYUN MADATYAN
Permit Finaled 1/22/2026 JOHN JANSON
CofO Issued 1/22/2026 JOHN JANSON
Permit Finaled 1/22/2026 JOHN JANSON

Permit Application Clearance Information

Address approval Cleared 8/27/2024 LEE GUILBEAUX
Roof/Waste drainage to street Cleared 8/27/2024 LEE GUILBEAUX
Eng Process Fee Ord 176,300 Cleared 8/28/2024 LEE GUILBEAUX
Sewer availability Cleared 8/28/2024 LEE GUILBEAUX
Public Works-Highway Ded. Cleared 8/28/2024 LEE GUILBEAUX

Contact Information

Contractor Owner-Builder       ,
Engineer Barakat,, Fouad Chafic; Lic. No.: C67449 11 CEDARWOOD DR      POMONA, CA 91766

Inspector Information

ARUTYUN MADATYAN, (818) 774-4307 Office Hours: 7:00-8:00 AM MON-FRI
JUAN ALVARADO, (818) 774-4307 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 12/2/2024 Corrections Issued ARUTYUN MADATYAN
Grading Pre-Inspection 12/2/2024 Not Ready for Inspection ARUTYUN MADATYAN
Footing/Foundation/Slab 12/12/2024 Not Ready for Inspection ARUTYUN MADATYAN
Footing/Foundation/Slab 12/20/2024 No Access for Inspection JEFFREY HARTLINE
Footing/Foundation/Slab 12/24/2024 Partial Approval ARUTYUN MADATYAN
Footing/Foundation/Slab 1/13/2025 Not Ready for Inspection ARUTYUN MADATYAN
PLUMBING-Rough 1/13/2025 Not Ready for Inspection ARUTYUN MADATYAN
Excavation/Setback/Form/Re-Bar 1/16/2025 Not Ready for Inspection ARUTYUN MADATYAN
PLUMBING-Rough 1/16/2025 Corrections Issued ARUTYUN MADATYAN
PLUMBING-Rough 1/21/2025 Approved ARUTYUN MADATYAN
BUILDING-Rough-Frame 4/1/2025 Not Ready for Inspection ARUTYUN MADATYAN
ELECTRICAL-Rough 4/1/2025 Not Ready for Inspection ARUTYUN MADATYAN
Floor/Roof Diaphrgm/Shear Wall 4/1/2025 Corrections Issued ARUTYUN MADATYAN
Green Building Rough 4/1/2025 Not Ready for Inspection ARUTYUN MADATYAN
PLUMBING-Rough 4/1/2025 Not Ready for Inspection ARUTYUN MADATYAN
ELECTRICAL-Rough 4/17/2025 Not Ready for Inspection ARUTYUN MADATYAN
Floor/Roof Diaphrgm/Shear Wall 4/17/2025 Approved ARUTYUN MADATYAN
Green Building Rough 4/17/2025 Not Ready for Inspection ARUTYUN MADATYAN
PLUMBING-Rough 4/17/2025 Approved ARUTYUN MADATYAN
Deputy Drilled-In Anchors 4/21/2025 Conditional Approval ROBERT GOLD
BUILDING-Rough-Frame 5/7/2025 Conditional Approval ARUTYUN MADATYAN
ELECTRICAL-Rough 5/7/2025 Approved ARUTYUN MADATYAN
Green Building Rough 5/7/2025 Approved ARUTYUN MADATYAN
HVAC-Rough 5/7/2025 Corrections Issued ARUTYUN MADATYAN
PLUMBING-Rough 5/7/2025 Approved ARUTYUN MADATYAN
HVAC-Rough 5/12/2025 Approved ARUTYUN MADATYAN
Insulation 5/12/2025 Approved ARUTYUN MADATYAN
Drywall Nailing 5/28/2025 Approved ARUTYUN MADATYAN
Interior/Exterior Lathing 5/28/2025 Approved ARUTYUN MADATYAN
Shower Pan 5/28/2025 Approved ARUTYUN MADATYAN
ELECTRICAL-Rough 7/14/2025 Partial Approval ARUTYUN MADATYAN
BUILDING-Rough-Frame 12/30/2025 Approved ARUTYUN MADATYAN
Final 12/30/2025 Not Ready for Inspection ARUTYUN MADATYAN
Footing/Foundation/Slab 12/30/2025 Approved ARUTYUN MADATYAN
Green Building Final 12/30/2025 Not Ready for Inspection ARUTYUN MADATYAN
SGSOV-Seismic Gas S/O Valve 12/30/2025 SGSOV Not Ready ARUTYUN MADATYAN
Smoke Detectors 12/30/2025 Not Ready for Inspection ARUTYUN MADATYAN
Final 1/6/2026 Corrections Issued ARUTYUN MADATYAN
Green Building Final 1/6/2026 Approved ARUTYUN MADATYAN
SGSOV-Seismic Gas S/O Valve 1/6/2026 SGSOV Approved ARUTYUN MADATYAN
Smoke Detectors 1/6/2026 Approved ARUTYUN MADATYAN
ELECTRICAL-Final 1/12/2026 Approved ARUTYUN MADATYAN
Final 1/12/2026 OK to Issue CofO ARUTYUN MADATYAN
HVAC-Final 1/12/2026 Approved ARUTYUN MADATYAN
PLUMBING-Final 1/12/2026 Approved ARUTYUN MADATYAN
Service/Power Release 1/12/2026 Approved ARUTYUN MADATYAN