1419 S BURNSIDE AVE 90019

Certificate Information: 1419 S BURNSIDE AVE 90019

Application / Permit
24014-10000-01768
Plan Check / Job No.
B24LA07950
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
CONVERT PORTION OF EXISTING DETACHED GARAGE WITH UNPERMITTED PORTION TO A NEW ACCESSORY DWELLING UNIT PER GCS 65852.23. CONVERT PORTION OF GARAGE TO NEW STORAGE. "COMPLY WITH DEPARTMENT ORDER effective date 08/30/2005. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE". Existing construction that does not pose a threat to the publics health and safety was allowed per Government Code Section 55.852.2(d)(2).
Permit Issued
Issued on 4/4/2025
Issuing Office
Current Status
CofO Issued on 2/3/2026
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 5/10/2024 APPLICANT
Assigned to Plan Check Engineer 5/14/2024 ALEC MOUSAKHANIAN
Corrections Issued 5/15/2024 ALEC MOUSAKHANIAN
Applicant returned to address corrections 12/10/2024 ROSENDO MEDINA
Applicant returned to address corrections 2/11/2025 ROSENDO MEDINA
Applicant returned to address corrections 2/18/2025 NAREG ATARIAN
Applicant returned to address corrections 2/27/2025 NAREG ATARIAN
Applicant returned to address corrections 3/13/2025 MADISON ODELL
Plan Check Approved 4/1/2025 MADISON O'DELL
Issued 4/4/2025 APPLICANT
CofO in Progress 9/4/2025 WILLIAM MICHALAK
Permit Finaled 2/3/2026 CLAUDIO MORENO
CofO Issued 2/3/2026 CLAUDIO MORENO
Permit Finaled 2/3/2026 CLAUDIO MORENO

Permit Application Clearance Information

Address approval Cleared 5/29/2024 CHRISTINA BRACO
Roof/Waste drainage to street Cleared 5/29/2024 CHRISTINA BRACO
Eng Process Fee Ord 176,300 Cleared 6/4/2024 CHRISTINA BRACO
Sewer availability Cleared 6/4/2024 CHRISTINA BRACO
Construction near power lines Cleared 9/25/2024 RIDWAN HARDY
Construction within easement Cleared 9/25/2024 RIDWAN HARDY

Contact Information

Contractor Owner-Builder       ,
Engineer Watson,, Darren; Lic. No.: C87717 1759 HAPPY TRAIL      TOPANGA, CA 90290

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

BUILDING-Rough-Frame 4/9/2025 No Access for Inspection WILLIAM MICHALAK
Final 4/9/2025 Not Ready for Inspection WILLIAM MICHALAK
Green Building Final 4/9/2025 Corrections Issued WILLIAM MICHALAK
Green Building Rough 4/9/2025 Not Ready for Inspection WILLIAM MICHALAK
METHANE-Final 4/9/2025 Not Ready for Inspection WILLIAM MICHALAK
METHANE-Rough 4/9/2025 Not Ready for Inspection WILLIAM MICHALAK
SGSOV-Seismic Gas S/O Valve 4/9/2025 SGSOV Not Ready WILLIAM MICHALAK
Smoke Detectors 4/9/2025 Not Ready for Inspection WILLIAM MICHALAK
Pre-Inspection 4/30/2025 Corrections Issued WILLIAM MICHALAK
Deputy Drilled-In Anchors 5/13/2025 Approved WILLIAM MICHALAK
Deputy Reinf. Concrete 6/4/2025 Conditional Approval WILLIAM MICHALAK
Footing/Foundation/Slab 6/18/2025 Approved LUIS CORRAL
BUILDING-Rough-Frame 6/25/2025 Not Ready for Inspection WILLIAM MICHALAK
ELECTRICAL-Final 6/25/2025 Corrections Issued WILLIAM MICHALAK
Floor/Roof Diaphrgm/Shear Wall 6/25/2025 Partial Approval WILLIAM MICHALAK
Green Building Rough 6/25/2025 Not Ready for Inspection WILLIAM MICHALAK
ELECTRICAL-Rough 7/9/2025 Approved WILLIAM MICHALAK
Insulation 7/17/2025 Approved WILLIAM MICHALAK
PLUMBING-Rough 7/17/2025 Corrections Issued WILLIAM MICHALAK
Drywall Nailing 7/21/2025 Approved WILLIAM MICHALAK
BUILDING-Rough-Frame 8/4/2025 Corrections Issued WILLIAM MICHALAK
Final 8/4/2025 Corrections Issued WILLIAM MICHALAK
Green Building Final 8/4/2025 Corrections Issued WILLIAM MICHALAK
Green Building Rough 8/4/2025 Corrections Issued WILLIAM MICHALAK
METHANE-Final 8/4/2025 Approved WILLIAM MICHALAK
METHANE-Rough 8/4/2025 Approved WILLIAM MICHALAK
SGSOV-Seismic Gas S/O Valve 8/4/2025 SGSOV No Gas WILLIAM MICHALAK
Smoke Detectors 8/4/2025 Not Ready for Inspection WILLIAM MICHALAK
BUILDING-Rough-Frame 8/18/2025 Approved WILLIAM MICHALAK
Final 8/18/2025 Not Ready for Inspection WILLIAM MICHALAK
Green Building Final 8/18/2025 Not Ready for Inspection WILLIAM MICHALAK
Green Building Rough 8/18/2025 Approved WILLIAM MICHALAK
Smoke Detectors 8/18/2025 Approved WILLIAM MICHALAK
Final 9/4/2025 OK to Issue CofO WILLIAM MICHALAK
Gas Test 9/4/2025 Approved WILLIAM MICHALAK
Green Building Final 9/4/2025 Approved WILLIAM MICHALAK