3955 S VICTORIA AVE 90008

Certificate Information: 3955 S VICTORIA AVE 90008

Application / Permit
24014-10000-01709
Plan Check / Job No.
B24LA07556
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
EPLAN. ADDITION TO (E) DETACHED ADU. PER ENGINEERING DESIGN.
Permit Issued
Issued on 12/5/2024
Issuing Office
Current Status
CofO Issued on 6/12/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 4/24/2024 APPLICANT
Assigned to Plan Check Engineer 4/26/2024 JOHNPAUL ISIP
Corrections Issued 4/27/2024 JOHNPAUL ISIP
Applicant returned to address corrections 5/9/2024 CAROLEAN BASMA
Applicant returned to address corrections 10/31/2024 DAVID CASTILLO
Applicant returned to address corrections 11/4/2024 DAVID CASTILLO
Applicant returned to address corrections 11/28/2024 DAVID CASTILLO
Plan Check Approved 12/4/2024 ALFREDO JARA
Issued 12/5/2024 APPLICANT
CofO in Progress 6/12/2025 LUIS CASTRO
Permit Finaled 6/12/2025 DEROLD HAUFF
CofO Issued 6/12/2025 DEROLD HAUFF
Permit Finaled 6/12/2025 DEROLD HAUFF

Permit Application Clearance Information

Roof/Waste drainage to street Cleared 6/8/2024 ADRIAN SANCHEZ
Eng Process Fee Ord 176,300 Cleared 6/11/2024 ADRIAN SANCHEZ
Sewer availability Cleared 6/11/2024 ADRIAN SANCHEZ
Construction near power lines Cleared 10/29/2024 TINA MIRANDA

Contact Information

Contractor Rios Construction; Lic. No.: 1104081-B       ,
Engineer Grandhi,, Venkata Rohit; Lic. No.: C88709 7823 BOXWOOD CT      HIGHLAND, CA 92346

Inspector Information

LUIS CASTRO, (213) 202-3436 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 1/9/2025 Partial Approval LUIS CASTRO
Footing/Foundation/Slab 1/13/2025 Approved LUIS CASTRO
Floor/Roof Diaphrgm/Shear Wall 2/18/2025 Partial Approval LUIS CASTRO
Pre-Inspection 2/18/2025 Partial Approval LUIS CASTRO
Wood Frame 2/18/2025 Not Ready for Inspection LUIS CASTRO
ELECTRICAL-Rough 3/10/2025 Approved LUIS CASTRO
Interior/Exterior Lathing 3/10/2025 Approved LUIS CASTRO
Pre-Inspection 3/10/2025 Partial Approval LUIS CASTRO
Wood Frame 3/10/2025 Not Ready for Inspection LUIS CASTRO
HVAC-Rough 3/25/2025 Corrections Issued LUIS CASTRO
Pre-Inspection 3/25/2025 Not Ready for Inspection LUIS CASTRO
Wood Frame 3/25/2025 Partial Approval LUIS CASTRO
HVAC-Rough 4/2/2025 Approved LUIS CASTRO
Pre-Inspection 4/2/2025 Not Ready for Inspection LUIS CASTRO
Wood Frame 4/2/2025 Approved LUIS CASTRO
Insulation 4/29/2025 Approved LUIS CASTRO
Drywall Nailing 5/7/2025 Approved LUIS CASTRO
BUILDING-Rough-Frame 6/9/2025 Approved LUIS CASTRO
Final 6/9/2025 Partial Approval LUIS CASTRO
Green Building Final 6/9/2025 Approved LUIS CASTRO
Green Building Rough 6/9/2025 Approved LUIS CASTRO
SGSOV-Seismic Gas S/O Valve 6/9/2025 SGSOV Approved LUIS CASTRO
Smoke Detectors 6/9/2025 Approved LUIS CASTRO
ELECTRICAL-Final 6/11/2025 Approved LUIS CASTRO
Final 6/11/2025 OK to Issue CofO LUIS CASTRO
HVAC-Final 6/11/2025 Approved LUIS CASTRO
PLUMBING-Final 6/11/2025 Approved LUIS CASTRO