2278 S MANNING AVE 90064

Certificate Information: 2278 S MANNING AVE 90064

Application / Permit
24014-10000-01628
Plan Check / Job No.
B24LA07239
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
eplan MAJOR ADDITION AND REMODEL TO (E) 1-STORY SFD. ADDITION AND REMODEL TO CREATE A 2-STORY SFD WITH ATTACHED 2-CAR GARAGE. TO BE EQUIPPED WITH NFPA 13D FIRE SPRINKLERS.
Permit Issued
Issued on 6/24/2025
Issuing Office
Current Status
Issued on 6/24/2025
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 4/19/2024 APPLICANT
Assigned to Plan Check Engineer 4/25/2024 ADRIANA LOPEZ
Corrections Issued 4/28/2024 ADRIANA LOPEZ
Quality Review Completed 5/21/2024 CAROLYNN NEPOMUCENO
Applicant returned to address corrections 8/15/2024 ADRIANA LOPEZ
Applicant returned to address corrections 10/9/2024 ADRIANA LOPEZ
Applicant returned to address corrections 11/14/2024 ADRIANA LOPEZ
Applicant returned to address corrections 1/3/2025 ADRIANA LOPEZ
Applicant returned to address corrections 4/14/2025 ADRIANA LOPEZ
Applicant returned to address corrections 4/30/2025 ADRIANA LOPEZ
Applicant returned to address corrections 6/3/2025 ADRIANA LOPEZ
Plan Check Approved 6/17/2025 ADRIANA LOPEZ
Issued 6/24/2025 APPLICANT

Permit Application Clearance Information

Sewer availability Cleared 6/11/2024 VLADIMIR ARUTYUNYAN
Flood clearance Cleared 2/4/2025 TUYEN LE
Eng Process Fee Ord 176,300 Cleared 2/19/2025 VLADIMIR ARUTYUNYAN
Permit Cleared 2/19/2025 VLADIMIR ARUTYUNYAN
Roof/Waste drainage to street Cleared 2/19/2025 VLADIMIR ARUTYUNYAN
GPI Written Notices Cleared 4/10/2025 ADRIANA LOPEZ
Grading Pre-Inspection Cleared 4/10/2025 ADRIANA LOPEZ
Trees in Parkway Cleared 5/8/2025 MIGUEL ORNELAS
Specific Plan Cleared 5/14/2025 RICHARD WOO

Contact Information

Contractor B M K Remodeling Inc; Lic. No.: 1049328-B       ,
Engineer Shahbaz,, Shant Pierre; Lic. No.: NA93079       ,

Inspector Information

DAVID SCANTLIN, (310) 914-3863 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

FLOOD-Elevation Certificate 8/26/2025 Not Ready for Inspection DANIEL VERA
Footing/Foundation/Slab 8/26/2025 Corrections Issued DANIEL VERA
METHANE-Barrier 8/26/2025 Not Ready for Inspection DANIEL VERA
METHANE-Subgrade 8/26/2025 Not Ready for Inspection DANIEL VERA
FLOOD-Elevation Certificate 8/29/2025 Conditional Approval MICHAEL ALLEN
Footing/Foundation/Slab 8/29/2025 Corrections Issued MICHAEL ALLEN
FLOOD-Elevation Certificate 9/4/2025 Not Ready for Inspection DANIEL VERA
Footing/Foundation/Slab 9/4/2025 Not Ready for Inspection DANIEL VERA
FLOOD-Elevation Certificate 9/9/2025 Conditional Approval DANIEL VERA
Footing/Foundation/Slab 9/9/2025 Not Ready for Inspection DANIEL VERA
FLOOD-Elevation Certificate 10/3/2025 Conditional Approval DANIEL VERA
Footing/Foundation/Slab 10/3/2025 Partial Approval DANIEL VERA
FLOOD-Elevation Certificate 10/8/2025 Not Ready for Inspection JESUS RODRIGUEZ
Footing/Foundation/Slab 10/8/2025 Partial Approval JESUS RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 10/17/2025 No Access for Inspection DANIEL VERA
BUILDING-Rough-Frame 10/21/2025 Not Ready for Inspection DANIEL VERA
FLOOD-Proofing Certificate 10/21/2025 Conditional Approval DANIEL VERA
Floor/Roof Diaphrgm/Shear Wall 10/21/2025 Partial Approval DANIEL VERA
Green Building Rough 10/21/2025 Not Ready for Inspection DANIEL VERA
METHANE-Rough 10/21/2025 Not Ready for Inspection DANIEL VERA
Underground Mechanical 10/24/2025 Approved DANIEL VERA
Floor/Roof Diaphrgm/Shear Wall 10/28/2025 Partial Approval DANIEL VERA
Green Building Rough 10/28/2025 Not Ready for Inspection DANIEL VERA
Insulation 10/28/2025 Partial Approval DANIEL VERA
METHANE-Rough 10/28/2025 Approved DANIEL VERA
BUILDING-Rough-Frame 11/5/2025 Not Ready for Inspection DANIEL VERA
Floor/Roof Diaphrgm/Shear Wall 11/5/2025 Corrections Issued DANIEL VERA
Green Building Rough 11/5/2025 Not Ready for Inspection DANIEL VERA
BUILDING-Rough-Frame 11/26/2025 Not Ready for Inspection DANIEL VERA
Floor/Roof Diaphrgm/Shear Wall 11/26/2025 Partial Approval DANIEL VERA
Green Building Rough 11/26/2025 Not Ready for Inspection DANIEL VERA
ELECTRICAL-Rough 1/29/2026 Corrections Issued RYAN SALAZAR
HVAC-Rough 1/29/2026 Corrections Issued RYAN SALAZAR
PLUMBING-Rough 1/29/2026 Corrections Issued RYAN SALAZAR
ELECTRICAL-Rough 3/18/2026 Approved RYAN SALAZAR
HVAC-Rough 3/18/2026 Approved RYAN SALAZAR
Masonry Wall/Backfill 3/18/2026 Not Ready for Inspection RYAN SALAZAR
PLUMBING-Rough 3/18/2026 Approved RYAN SALAZAR
Insulation 4/9/2026 Not Ready for Inspection WILBER ROSALES
Interior/Exterior Lathing 4/9/2026 Corrections Issued WILBER ROSALES
BUILDING-Rough-Frame 4/15/2026 Corrections Issued CARLOS MATAMOROS
Floor/Roof Diaphrgm/Shear Wall 4/21/2026 Corrections Issued CARLOS MATAMOROS
BUILDING-Rough-Frame 4/28/2026 Approved RYAN SALAZAR
FLOOD-Proofing Certificate 4/28/2026 Approved RYAN SALAZAR
Floor/Roof Diaphrgm/Shear Wall 4/28/2026 Approved RYAN SALAZAR
Green Building Rough 4/28/2026 Approved RYAN SALAZAR
Insulation 4/28/2026 Partial Approval RYAN SALAZAR
Insulation 5/6/2026 Approved ANDREW NAVE
Shower Pan 5/6/2026 Approved ANDREW NAVE