5525 N WORTSER AVE sfd 91401

Certificate Information: 5525 N WORTSER AVE sfd 91401

Application / Permit
24014-10000-00926
Plan Check / Job No.
B24LA04193
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
ePlan: Addition and remodel to existing S.F.D. New attached covered patio at rear of S.F.D.
Permit Issued
Issued on 7/12/2024
Issuing Office
Current Status
Issued on 7/12/2024
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 4/9/2024 APPLICANT
Assigned to Plan Check Engineer 4/12/2024 CAROLEAN BASMA
Corrections Issued 4/15/2024 CAROLEAN BASMA
Applicant returned to address corrections 6/20/2024 CAROLEAN BASMA
Applicant returned to address corrections 6/25/2024 CAROLEAN BASMA
Plan Check Approved 6/27/2024 CAROLEAN BASMA
Issued 7/12/2024 APPLICANT

Permit Application Clearance Information

Roof/Waste drainage to street Cleared 4/24/2024 CARLOS RAMIREZ
Sewer availability Cleared 4/24/2024 CARLOS RAMIREZ
Eng Process Fee Ord 176,300 Cleared 5/6/2024 CARLOS RAMIREZ
Hold Cleared 8/27/2024 ALEXIS SCHULTZ

Contact Information

Contractor B C Design And Development Inc; Lic. No.: 1022562-B       ,
Contractor Bc Design & Development Inc; Lic. No.: 1022562-B       ,
Engineer Nazari,, Arthur; Lic. No.: C53497 23300 POMPANO STREET      MALIBU, CA 90265

Inspector Information

WAYNE REGESTER, (818) 374-1164 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

PLUMBING-Final 7/27/2026   
HVAC-Final 7/27/2026   
ELECTRICAL-Final 7/27/2026   

Inspection Request History

Deputy Drilled-In Anchors 7/16/2024 Approved VINCENT HANLEY
Excavation/Setback/Form/Re-Bar 7/16/2024 Approved VINCENT HANLEY
Footing/Foundation/Slab 7/16/2024 Approved VINCENT HANLEY
Floor/Roof Diaphrgm/Shear Wall 8/28/2024 Corrections Issued ROBERTO PALACIOS-LOPEZ
Green Building Rough 8/28/2024 Not Ready for Inspection ROBERTO PALACIOS-LOPEZ
BUILDING-Rough-Frame 9/3/2024 Corrections Issued CHRISTOPHE COCHRAN
Floor/Roof Diaphrgm/Shear Wall 9/3/2024 Partial Approval CHRISTOPHE COCHRAN
Floor/Roof Diaphrgm/Shear Wall 10/17/2024 Corrections Issued OGANES TARAKHCHYAN
Deputy Drilled-In Anchors 11/15/2024 Conditional Approval RAUL OLAGI
Deputy Wood Construction 11/20/2024 Conditional Approval RAUL OLAGI
Floor/Roof Diaphrgm/Shear Wall 11/21/2024 Partial Approval OGANES TARAKHCHYAN
HVAC-Rough 11/21/2024 Not Ready for Inspection OGANES TARAKHCHYAN
PLUMBING-Rough 11/21/2024 Not Ready for Inspection OGANES TARAKHCHYAN
BUILDING-Rough-Frame 11/27/2024 Not Ready for Inspection OGANES TARAKHCHYAN
ELECTRICAL-Rough 11/27/2024 Not Ready for Inspection OGANES TARAKHCHYAN
Floor/Roof Diaphrgm/Shear Wall 11/27/2024 Corrections Issued OGANES TARAKHCHYAN
PLUMBING-Rough 11/27/2024 Not Ready for Inspection OGANES TARAKHCHYAN
BUILDING-Rough-Frame 12/9/2024 Conditional Approval GAREN HAYRAPETYAN
ELECTRICAL-Rough 12/9/2024 Approved GAREN HAYRAPETYAN
HVAC-Rough 12/9/2024 Approved GAREN HAYRAPETYAN
PLUMBING-Rough 12/9/2024 Approved GAREN HAYRAPETYAN
Insulation 12/12/2024 Approved OGANES TARAKHCHYAN
Interior/Exterior Lathing 12/12/2024 Not Ready for Inspection OGANES TARAKHCHYAN
Drywall Nailing 12/20/2024 Not Ready for Inspection OGANES TARAKHCHYAN
Green Building Rough 12/20/2024 Approved OGANES TARAKHCHYAN
Interior/Exterior Lathing 12/20/2024 Not Ready for Inspection OGANES TARAKHCHYAN
Interior/Exterior Lathing 8/18/2025 No Access for Inspection OGANES TARAKHCHYAN
Interior/Exterior Lathing 9/10/2025 Partial Approval LOUIS ESCOTO