4338 N MAYCREST AVE 90032

Certificate Information: 4338 N MAYCREST AVE 90032

Application / Permit
24014-10000-00217
Plan Check / Job No.
B24LA00892
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Propsoed 9'-4" x 48'-5" addition to exsting SFD.
Permit Issued
Issued on 4/12/2024
Issuing Office
Metro
Current Status
Issued on 4/12/2024
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 1/18/2024 APPLICANT
Assigned to Plan Check Engineer 1/23/2024 HUAN LE
Corrections Issued 1/25/2024 HUAN LE
Building Plans Picked Up 2/20/2024 APPLICANT
Issued 4/12/2024 APPLICANT

Permit Application Clearance Information

Roof/Waste drainage to street Cleared 3/12/2024 AMBER CAMPBELL
Sewer availability Cleared 3/12/2024 AMBER CAMPBELL
Eng Process Fee Ord 176,300 Cleared 3/20/2024 AMBER CAMPBELL
Grading Pre-Inspection Cleared 3/29/2024 MICHAEL TEMPLE

Contact Information

Contractor Lensray Design Inc; Lic. No.: 986886-B 5042 WILSHIRE BLVD SUITE 900      LOS ANGELES, CA 90036
Engineer Tuna,, Suleyman; Lic. No.: C73294 3332 BENNETT DRIVE      LOS ANGELES, CA 90068

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 5/2/2024 Approved LILIANA PORTILLO
BUILDING-Rough-Frame 5/17/2024 Corrections Issued LILIANA PORTILLO
PLUMBING-Rough 5/17/2024 Corrections Issued LILIANA PORTILLO
BUILDING-Rough-Frame 5/21/2024 Partial Approval LILIANA PORTILLO
Floor/Roof Diaphrgm/Shear Wall 5/21/2024 Partial Approval LILIANA PORTILLO
Insulation 5/21/2024 Partial Approval LILIANA PORTILLO
PLUMBING-Rough 5/21/2024 Partial Approval LILIANA PORTILLO
ELECTRICAL-Rough 7/3/2024 Corrections Issued LILIANA PORTILLO
Floor/Roof Diaphrgm/Shear Wall 7/3/2024 Approved LILIANA PORTILLO
HVAC-Rough 7/3/2024 Corrections Issued LILIANA PORTILLO
PLUMBING-Rough 7/3/2024 Corrections Issued LILIANA PORTILLO
BUILDING-Rough-Frame 7/15/2024 Conditional Approval LILIANA PORTILLO
ELECTRICAL-Rough 7/15/2024 Approved LILIANA PORTILLO
Interior/Exterior Lathing 7/15/2024 Partial Approval LILIANA PORTILLO
PLUMBING-Rough 7/15/2024 Approved LILIANA PORTILLO
Shower Pan 7/15/2024 Approved LILIANA PORTILLO
Insulation 7/19/2024 Approved LILIANA PORTILLO
Interior/Exterior Lathing 7/19/2024 Approved LILIANA PORTILLO
Drywall Nailing 7/23/2024 Approved LILIANA PORTILLO
Green Building Rough 7/23/2024 Approved LILIANA PORTILLO
HVAC-Rough 7/23/2024 Approved LILIANA PORTILLO
BUILDING-Rough-Frame 6/4/2026 Approved OSVALDO PARAMO
Final 6/4/2026 Corrections Issued OSVALDO PARAMO
Green Building Final 6/4/2026 Approved OSVALDO PARAMO
SGSOV-Seismic Gas S/O Valve 6/4/2026 SGSOV Approved OSVALDO PARAMO
Smoke Detectors 6/4/2026 Approved OSVALDO PARAMO