2112 S PELHAM AVE 90025

Certificate Information: 2112 S PELHAM AVE 90025

Application / Permit
24014-10000-00024
Plan Check / Job No.
B24LA00071
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
EPLAN: convert exisitng detached garage (188sqft) + addtion (77sqft) to ADU (265sqft) with storage addtion (72sqft) and attached trellis (21sqft) per engineer details CA Govt. Code 65852.2(e)(1)(B) and applicable part2 of LAMC 12.22 A.33 (c)-(d), (g))
Permit Issued
Issued on 6/13/2024
Issuing Office
Current Status
CofO Issued on 5/15/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 1/9/2024 APPLICANT
Assigned to Plan Check Engineer 1/12/2024 AUNG SOE
Corrections Issued 1/16/2024 AUNG SOE
Applicant returned to address corrections 2/8/2024 KHUONG TRUONG
Plan Check Approved 6/13/2024 KHUONG TRUONG
Issued 6/13/2024 APPLICANT
CofO in Progress 5/7/2025 DANIEL VERA
Permit Finaled 5/15/2025 RICHARD STEINBACH
Permit Finaled 5/15/2025 RICHARD STEINBACH
CofO Issued 5/15/2025 RICHARD STEINBACH

Permit Application Clearance Information

Address approval Cleared 1/16/2024 ANTHONY MAINEZ
Eng Process Fee Ord 176,300 Cleared 1/17/2024 ANTHONY MAINEZ
Sewer availability Cleared 1/17/2024 ANTHONY MAINEZ
Grading Pre-Inspection Cleared 1/22/2024 VASIL MIHALEV
Specific Plan Cleared 2/20/2024 FREDDY GARCIA
Roof/Waste drainage to street Cleared 2/22/2024 VLADIMIR ARUTYUNYAN
Construction near power lines Cleared 5/30/2024 RIDWAN HARDY
Construction within easement Cleared 5/30/2024 RIDWAN HARDY

Contact Information

Contractor Kor Design Build; Lic. No.: 1026877-B       ,
Engineer David, Lee Reith; Lic. No.: C72122 1319 FEATHER AVE      THOUSAND OAKS, CA 91360

Inspector Information

DAVID SCANTLIN, (310) 914-3863 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 8/19/2024 Partial Approval STEPHANIE SWANSON
PLUMBING-Rough 8/21/2024 Corrections Issued STEPHANIE SWANSON
Footing/Foundation/Slab 8/28/2024 Approved STEPHANIE SWANSON
ELECTRICAL-Rough 10/4/2024 Corrections Issued STEPHANIE SWANSON
HVAC-Rough 10/4/2024 Corrections Issued STEPHANIE SWANSON
PLUMBING-Rough 10/4/2024 Conditional Approval STEPHANIE SWANSON
Deputy Wood Construction 10/9/2024 Conditional Approval STEPHANIE SWANSON
Floor/Roof Diaphrgm/Shear Wall 10/15/2024 Partial Approval STEPHANIE SWANSON
HVAC-Rough 10/15/2024 Partial Approval STEPHANIE SWANSON
Interior/Exterior Lathing 10/22/2024 Partial Approval STEPHANIE SWANSON
Shower Pan 10/22/2024 Approved STEPHANIE SWANSON
Interior/Exterior Lathing 11/1/2024 Corrections Issued MICHAEL PELHAM
Insulation 11/5/2024 Approved STEPHANIE SWANSON
Interior/Exterior Lathing 11/5/2024 Approved STEPHANIE SWANSON
Green Building Rough 11/14/2024 Approved STEPHANIE SWANSON
BUILDING-Rough-Frame 11/18/2024 Approved STEPHANIE SWANSON
Drywall Nailing 11/20/2024 Approved STEPHANIE SWANSON
ELECTRICAL-Final 1/17/2025 Corrections Issued STEPHANIE SWANSON
HVAC-Final 1/17/2025 Approved STEPHANIE SWANSON
ELECTRICAL-Final 1/29/2025 Approved STEPHANIE SWANSON
Final 2/3/2025 Corrections Issued STEPHANIE SWANSON
PLUMBING-Final 2/3/2025 Corrections Issued STEPHANIE SWANSON
Final 4/29/2025 Not Ready for Inspection DANIEL VERA
Green Building Final 4/29/2025 Approved DANIEL VERA
PLUMBING-Final 4/29/2025 Not Ready for Inspection DANIEL VERA
SGSOV-Seismic Gas S/O Valve 4/29/2025 SGSOV Approved DANIEL VERA
Smoke Detectors 4/29/2025 Approved DANIEL VERA
PLUMBING-Final 4/30/2025 Approved DANIEL VERA
Final 5/6/2025 OK to Issue CofO DANIEL VERA