2401 S REDONDO BLVD A-B 90016

Certificate Information: 2401 S REDONDO BLVD A-B 90016

Application / Permit
24010-30000-00148
Plan Check / Job No.
B24WL00102
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(2) Duplex
Work Description
NEW 3 STORY DUPLEX IN FRONT ---1 OF 2---
Permit Issued
Issued on 5/22/2024
Issuing Office
Metro
Current Status
CofO Issued on 7/20/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 1/12/2024 APPLICANT
Assigned to Plan Check Engineer 1/18/2024 KAVIAN REFAHI
Corrections Issued 1/21/2024 KAVIAN REFAHI
Quality Review Completed 1/29/2024 REZA HAGHIGHAT
Building Plans Picked Up 2/12/2024 APPLICANT
Plan Check Approved 4/24/2024 KAVIAN REFAHI
Issued 5/22/2024 APPLICANT
CofO in Progress 7/3/2025 ARTHUR NEGRETE
Permit Finaled 7/20/2025 DEROLD HAUFF
CofO Issued 7/20/2025 DEROLD HAUFF
Permit Finaled 7/20/2025 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 1/30/2024 WALLIE JONG
Eng Process Fee Ord 176,300 Cleared 1/30/2024 WALLIE JONG
Highway dedication Cleared 1/30/2024 WALLIE JONG
SB8 RUD Cleared 1/30/2024 SAMANTHA RIVERA
Sewer availability Cleared 2/5/2024 WALLIE JONG
Low Impact Development (LID) Cleared 2/9/2024 MITESH PATEL
Roof/Waste drainage to street Cleared 2/10/2024 ADRIAN SANCHEZ
Frnt yard landscape/Water mgmt Cleared 2/22/2024 JAZMIN ROQUE
Hydrant and Access approval Cleared 3/15/2024 RUEL COLE

Contact Information

Architect , ; Lic. No.: C35150 2355 WESTWOOD BLVD   900    LOS ANGELES, CA 90064
Contractor The B N Y N Inc; Lic. No.: 1065628-B 5949 WHITESETT AVE APT 213      VALLEY VILLAGE, CA 91607
Engineer Masud,, Fahad Mohammed; Lic. No.: C92662 2415 EATON COURT      ORANGE, CA 92867
Engineer Sandoval,, Martin; Lic. No.: C56905 12761 DAIRY ST      EASTVALE, CA 92880

Inspector Information

DAVID WILLIAMS, (213) 202-3126 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

PLUMBING-Rough 7/25/2024 Corrections Issued ANTHONY EGSON
PLUMBING-Rough 7/30/2024 Approved ARTHUR NEGRETE
Excavation/Setback/Form/Re-Bar 8/6/2024 Approved ARTHUR NEGRETE
Footing/Foundation/Slab 8/6/2024 Approved ARTHUR NEGRETE
Floor/Roof Diaphrgm/Shear Wall 8/19/2024 Partial Approval ARTHUR NEGRETE
Floor/Roof Diaphrgm/Shear Wall 9/4/2024 Approved ARTHUR NEGRETE
Floor/Roof Diaphrgm/Shear Wall 9/12/2024 Approved ARTHUR NEGRETE
Floor/Roof Diaphrgm/Shear Wall 9/23/2024 No Access for Inspection WILLIAM SIERRA
Floor/Roof Diaphrgm/Shear Wall 9/26/2024 Approved ARTHUR NEGRETE
ELECTRICAL-Rough 12/5/2024 Not Ready for Inspection ENRIQUE MIRELES
PLUMBING-Rough 12/5/2024 Approved ENRIQUE MIRELES
BUILDING-Rough-Frame 12/13/2024 Not Ready for Inspection JOAQUIN GREENOUGH
ELECTRICAL-Rough 12/13/2024 Not Ready for Inspection JOAQUIN GREENOUGH
Green Building Rough 12/13/2024 Not Ready for Inspection JOAQUIN GREENOUGH
HVAC-Rough 12/13/2024 Not Ready for Inspection JOAQUIN GREENOUGH
MERV13>=Rough 12/13/2024 Not Ready for Inspection JOAQUIN GREENOUGH
Verify Sprinkler Sign Off 12/13/2024 Not Ready for Inspection JOAQUIN GREENOUGH
ELECTRICAL-Rough 12/16/2024 Corrections Issued ARTHUR NEGRETE
HVAC-Rough 12/16/2024 Approved ARTHUR NEGRETE
BUILDING-Rough-Frame 12/17/2024 Approved ARTHUR NEGRETE
Green Building Rough 12/17/2024 Approved ARTHUR NEGRETE
MERV13>=Rough 12/17/2024 Approved ARTHUR NEGRETE
Verify Sprinkler Sign Off 12/17/2024 Approved ARTHUR NEGRETE
Insulation 1/7/2025 Approved ARTHUR NEGRETE
Interior/Exterior Lathing 1/7/2025 Not Ready for Inspection ARTHUR NEGRETE
Interior/Exterior Lathing 1/14/2025 Approved ARTHUR NEGRETE
Drywall Nailing 1/27/2025 Approved ALEX COLIN
Interior/Exterior Lathing 1/27/2025 Approved ALEX COLIN
ELECTRICAL-Final 6/11/2025 Approved ARTHUR NEGRETE
HVAC-Final 6/11/2025 Corrections Issued ARTHUR NEGRETE
PLUMBING-Final 6/11/2025 Approved ARTHUR NEGRETE
HVAC-Final 6/16/2025 Approved ARTHUR NEGRETE
Final 6/26/2025 Not Ready for Inspection ARTHUR NEGRETE
Green Building Final 6/26/2025 Partial Approval ARTHUR NEGRETE
MERV13>=Final 6/26/2025 Approved ARTHUR NEGRETE
SGSOV-Seismic Gas S/O Valve 6/26/2025 SGSOV Not Required ARTHUR NEGRETE
Service/Power Release 6/26/2025 Not Ready for Inspection ARTHUR NEGRETE
Smoke Detectors 6/26/2025 Approved ARTHUR NEGRETE
Final 7/2/2025 OK to Issue CofO ARTHUR NEGRETE
Green Building Final 7/2/2025 Approved ARTHUR NEGRETE
Service/Power Release 7/2/2025 Approved ARTHUR NEGRETE