7545-7547 N FAIR AVE 91352

Certificate Information: 7545-7547 N FAIR AVE 91352

Application / Permit
24010-20000-05345
Plan Check / Job No.
B24VN27058
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
EPLAN NEW 32'-11" X 39'-8" IRREGULAR SHAPED 2-STORYBUILDING FOR ACCESSORY DWELLING UNIT PER LAMC12.22A.33(c) and(e) & GARAGE AT 1ST FLOOR AND SFD per SB9 Two-Unit Development Ca Govt Code 65852.21 AT 2ND FLOOR. NFPA 13D FIRE SPRINKLERS THROUGHOUT. ALL WORK PER ENGINEERING.
Permit Issued
Issued on 5/31/2025
Issuing Office
Current Status
Issued on 5/31/2025
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 1/19/2025 APPLICANT
Assigned to Plan Check Engineer 1/23/2025 RAPHAEL ROSAS
Corrections Issued 1/28/2025 RAPHAEL ROSAS
Quality Review Completed 1/31/2025 STEVEN KIM
Applicant returned to address corrections 4/28/2025 RAPHAEL ROSAS
Applicant returned to address corrections 5/20/2025 RAPHAEL ROSAS
Plan Check Approved 5/28/2025 RAPHAEL ROSAS
Issued 5/31/2025 APPLICANT

Permit Application Clearance Information

Address approval Cleared 2/11/2025 EDGAR ALCARAZ
Roof/Waste drainage to street Cleared 2/11/2025 EDGAR ALCARAZ
Eng Process Fee Ord 176,300 Cleared 2/13/2025 EDGAR ALCARAZ
Sewer availability Cleared 2/13/2025 EDGAR ALCARAZ
Trees in Parkway Cleared 2/27/2025 BRANDON WONG
Miscellaneous Cleared 2/28/2025 EDGAR ALCARAZ
Permit Cleared 2/28/2025 EDGAR ALCARAZ
Senate Bill 9 Cleared 4/18/2025 ALEX VELA
Construction near power lines Cleared 4/22/2025 GEVORK KARAPETYAN

Contact Information

Contractor Owner-Builder       ,
Engineer Burnazyan,, Gegam; Lic. No.: C76761 3625 BEVERLY RIDGE DRIVE      SHERMAN OAKS, CA 91423

Inspector Information

GAREN HAYRAPETYAN, (818) 374-1171 Office Hours: 7:00-8:00 AM MON-FRI
ROBERTO PALACIOS-LOPEZ, (818) 374-1171 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

PLUMBING-Rough 8/8/2025 Conditional Approval JOSE AVILA
Excavation/Setback/Form/Re-Bar 8/15/2025 Corrections Issued ROBERTO PALACIOS-LOPEZ
Footing/Foundation/Slab 8/15/2025 Corrections Issued ROBERTO PALACIOS-LOPEZ
Excavation/Setback/Form/Re-Bar 8/22/2025 Corrections Issued ROBERTO PALACIOS-LOPEZ
Footing/Foundation/Slab 8/22/2025 Corrections Issued ROBERTO PALACIOS-LOPEZ
Floor/Roof Diaphrgm/Shear Wall 9/24/2025 Corrections Issued ROBERTO PALACIOS-LOPEZ
Green Building Rough 9/24/2025 Not Ready for Inspection ROBERTO PALACIOS-LOPEZ
Verify Sprinkler Sign Off 9/24/2025 Not Ready for Inspection ROBERTO PALACIOS-LOPEZ
Floor/Roof Diaphrgm/Shear Wall 9/29/2025 Partial Approval JOSE AVILA
Floor/Roof Diaphrgm/Shear Wall 11/10/2025 Corrections Issued JOSE AVILA
ELECTRICAL-Rough 12/8/2025 Partial Approval JOSE AVILA
PLUMBING-Rough 12/8/2025 Conditional Approval JOSE AVILA
ELECTRICAL-Rough 12/23/2025 Approved JOSE AVILA
HVAC-Rough 1/20/2026 Corrections Issued JOSE AVILA
HVAC-Rough 1/26/2026 Approved JOSE AVILA
Wood Frame 2/6/2026 Corrections Issued ROBERTO PALACIOS-LOPEZ
Floor/Roof Diaphrgm/Shear Wall 2/10/2026 Approved JOSE AVILA
BUILDING-Rough-Frame 2/23/2026 Corrections Issued JOSE AVILA
HVAC-Rough 2/23/2026 Partial Approval JOSE AVILA
Interior/Exterior Lathing 2/23/2026 Approved JOSE AVILA
PLUMBING-Rough 2/23/2026 Approved JOSE AVILA
Insulation 3/5/2026 Conditional Approval GAREN HAYRAPETYAN
Drywall Nailing 3/20/2026 Approved GAREN HAYRAPETYAN
Green Building Rough 3/20/2026 Approved GAREN HAYRAPETYAN
Shower Pan 3/20/2026 Approved GAREN HAYRAPETYAN
Interior/Exterior Lathing 5/7/2026 Approved ROBERTO PALACIOS-LOPEZ