9706-9708 W CRESTA DR 90035

Certificate Information: 9706-9708 W CRESTA DR 90035

Application / Permit
24010-20000-03666
Plan Check / Job No.
B24VN15067
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
New irregular shaped two stories 61' 11" x 46' 1" Single Family Dwelling with basement, attached Garage, Trellis, and attached ADU per LAMC 12.22 A.33(c) and (e). NFPA 13D sprinkler required.
Permit Issued
Issued on 11/20/2025
Issuing Office
Metro
Current Status
Issued on 11/20/2025
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 8/30/2024 APPLICANT
Assigned to Plan Check Engineer 9/5/2024 NAREG ATARIAN
Corrections Issued 9/8/2024 NAREG ATARIAN
Quality Review Completed 9/11/2024 OMID HEDAYAT
Building Plans Picked Up 9/18/2024 APPLICANT
Applicant returned to address corrections 2/28/2025 NAREG ATARIAN
Applicant returned to address corrections 7/2/2025 NAREG ATARIAN
Applicant returned to address corrections 11/3/2025 NAREG ATARIAN
Plan Check Approved 11/19/2025 NAREG ATARIAN
Issued 11/20/2025 APPLICANT

Permit Application Clearance Information

Miscellaneous Cleared 10/8/2024 MAYELA VILLA
ZA Case Cleared 10/8/2024 MAYELA VILLA
Address approval Cleared 10/22/2024 DIANA RENTERIA
Eng Process Fee Ord 176,300 Cleared 10/28/2024 DIANA RENTERIA
Hydrant and Access approval Cleared 12/17/2024 JERRY KAO
Roof/Waste drainage to street Cleared 3/24/2025 LEE GUILBEAUX
Public Works-Highway Ded. Cleared 3/24/2025 LEE GUILBEAUX
Sewer availability Cleared 4/22/2025 LEE GUILBEAUX
Specific Plan Cleared 4/23/2025 PEDRO AYALA
Trees in Parkway Cleared 8/18/2025 BRANDON WONG
GPI Written Notices Cleared 11/19/2025 AL GAMBLE
Grading Pre-Inspection Cleared 11/19/2025 AL GAMBLE
Permit Cleared 11/19/2025 ERIK BEASLEY

Contact Information

Contractor Owner-Builder       ,
Engineer Berkoz,, Ertunga; Lic. No.: S2504 4665 ELLENITA AVE      TARZANA, CA 91356
Engineer Le,, Thang Huu; Lic. No.: C63174 507 MAGELLAN RD      ARCADIA, CA 91007
Engineer Smith,, Melvin Bruce; Lic. No.: GE2673 2165 N MARVEL AVE      SIMI VALLEY, CA 93065

Inspector Information

ASHLEY THOMPSON, (310) 914-3897 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Reinf. Concrete 2/9/2026 Conditional Approval RYAN SALAZAR
ELECTRICAL-Rough 2/9/2026 Partial Approval RYAN SALAZAR
Footing/Foundation/Slab 2/10/2026 Partial Approval MICHAEL ALLEN
METHANE-Barrier 2/10/2026 Not Ready for Inspection MICHAEL ALLEN
METHANE-Subgrade 2/10/2026 Not Ready for Inspection MICHAEL ALLEN
Deputy Shotcrete 2/23/2026 Conditional Approval ANDREW NAVE
Deputy Shotcrete 2/25/2026 Conditional Approval ANDREW NAVE
Footing/Foundation/Slab 2/26/2026 Partial Approval ASHLEY THOMPSON
METHANE-Barrier 2/26/2026 Not Ready for Inspection ASHLEY THOMPSON
METHANE-Subgrade 2/26/2026 Not Ready for Inspection ASHLEY THOMPSON
Deputy Shotcrete 2/27/2026 Conditional Approval ANDREW NAVE
PLUMBING-Rough 3/10/2026 Corrections Issued ASHLEY THOMPSON
Sewer 3/10/2026 Corrections Issued ASHLEY THOMPSON
Deputy Methane Barrier 3/11/2026 Conditional Approval ASHLEY THOMPSON
PLUMBING-Rough 3/11/2026 Partial Approval ASHLEY THOMPSON
Deputy Methane Barrier 3/16/2026 Conditional Approval ASHLEY THOMPSON
METHANE-Barrier 3/16/2026 Not Ready for Inspection ASHLEY THOMPSON
METHANE-Subgrade 3/16/2026 Approved ASHLEY THOMPSON
Deputy Methane Barrier 3/19/2026 Conditional Approval ASHLEY THOMPSON
Deputy Reinf. Concrete 3/24/2026 Conditional Approval ANDREW NAVE
Footing/Foundation/Slab 3/25/2026 Partial Approval ASHLEY THOMPSON
METHANE-Barrier 3/25/2026 Approved ASHLEY THOMPSON
Deputy Reinf. Concrete 4/13/2026 Conditional Approval ANDREW NAVE
Footing/Foundation/Slab 4/14/2026 Approved ASHLEY THOMPSON
Deputy Reinf. Concrete 4/17/2026 Conditional Approval DANIEL VERA
Deputy Wood Construction 5/15/2026 Conditional Approval BOBBY KEY
Floor/Roof Diaphrgm/Shear Wall 5/26/2026 Partial Approval ASHLEY THOMPSON
Deputy Steel/Welding 5/27/2026 Conditional Approval ASHLEY THOMPSON
Floor/Roof Diaphrgm/Shear Wall 7/2/2026 Corrections Issued ASHLEY THOMPSON
Deputy Wood Construction 7/8/2026 Conditional Approval BOBBY KEY
Floor/Roof Diaphrgm/Shear Wall 7/10/2026 Partial Approval EVAN COOPER