5902-5904 N DONNA AVE 91356

Certificate Information: 5902-5904 N DONNA AVE 91356

Application / Permit
24010-20000-02653
Plan Check / Job No.
B24VN08932
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(2) Duplex
Work Description
Keep (E) 6'-0" Wall And Remodel With Additions To Convert And Create A (N) Irregular Shaped 2-story S.f.d. With Att. 2nd Dwelling Unit Per Sb9 Two-unit Development With Attached Patio Cover And Trellis And Roof Deck Per Engineering. Fully Sprinklered Per NFPA 13D.
Permit Issued
Issued on 10/30/2024
Issuing Office
Current Status
CofO Issued on 1/15/2026
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 6/24/2024 APPLICANT
Assigned to Plan Check Engineer 7/3/2024 ALFRED RAMIREZ
Corrections Issued 7/12/2024 ALFRED RAMIREZ
Quality Review Completed 7/18/2024 STEVEN KIM
Building Plans Picked Up 7/18/2024 APPLICANT
Plan Check Approved 10/30/2024 ALFRED RAMIREZ
Issued 10/30/2024 APPLICANT
CofO in Progress 11/26/2025 JON MCHUGH
Permit Finaled 1/15/2026 RUBEN SALAS
CofO Issued 1/15/2026 RUBEN SALAS
Permit Finaled 1/15/2026 RUBEN SALAS

Permit Application Clearance Information

Address approval Cleared 7/22/2024 LEE GUILBEAUX
Public Works-Highway Ded. Cleared 7/22/2024 LEE GUILBEAUX
Eng Process Fee Ord 176,300 Cleared 7/23/2024 LEE GUILBEAUX
Permit Cleared 7/23/2024 LEE GUILBEAUX
Sewer availability Cleared 7/23/2024 LEE GUILBEAUX
Senate Bill 9 Cleared 7/25/2024 BRENNEN OBETO
Trees in Parkway Cleared 8/16/2024 MIGUEL ORNELAS
Low Impact Development (LID) Cleared 8/20/2024 SARAH YOUSSEF
Roof/Waste drainage to street Cleared 9/11/2024 BIAINA HARITUNIAN
Hydrant and Access approval Cleared 10/18/2024 JOHN CONNEALLY

Contact Information

Contractor Owner-Builder       ,
Engineer Barakat,, Fouad Chafic; Lic. No.: C67449 11 CEDARWOOD DR      POMONA, CA 91766

Inspector Information

JON MCHUGH, (818) 774-4348 Office Hours: 7:00-8:00 AM MON-FRI
IVAN SARABIA, (818) 774-4348 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

PLUMBING-Rough 11/26/2024 Partial Approval JON MCHUGH
Deputy Drilled-In Anchors 12/5/2024 Conditional Approval JON MCHUGH
Excavation/Setback/Form/Re-Bar 12/6/2024 Corrections Issued JON MCHUGH
Footing/Foundation/Slab 12/6/2024 Not Ready for Inspection JON MCHUGH
Excavation/Setback/Form/Re-Bar 12/12/2024 Approved JON MCHUGH
Floor/Roof Diaphrgm/Shear Wall 1/6/2025 Partial Approval JON MCHUGH
Floor/Roof Diaphrgm/Shear Wall 2/3/2025 Not Ready for Inspection JON MCHUGH
Floor/Roof Diaphrgm/Shear Wall 2/4/2025 Corrections Issued JON MCHUGH
ELECTRICAL-Rough 2/20/2025 Not Ready for Inspection JON MCHUGH
HVAC-Rough 2/20/2025 Not Ready for Inspection JON MCHUGH
PLUMBING-Rough 2/20/2025 Approved JON MCHUGH
Shower Pan 2/27/2025 Approved JON MCHUGH
ELECTRICAL-Rough 3/7/2025 Not Ready for Inspection JON MCHUGH
HVAC-Rough 3/7/2025 No Access for Inspection JON MCHUGH
Interior/Exterior Lathing 3/7/2025 Not Ready for Inspection JON MCHUGH
ELECTRICAL-Rough 3/17/2025 Not Ready for Inspection JON MCHUGH
HVAC-Rough 3/17/2025 Not Ready for Inspection JON MCHUGH
Underground Mechanical 3/17/2025 Partial Approval JON MCHUGH
ELECTRICAL-Rough 3/25/2025 Approved JON MCHUGH
HVAC-Rough 3/25/2025 Approved JON MCHUGH
Interior/Exterior Lathing 3/25/2025 Partial Approval JON MCHUGH
Floor/Roof Diaphrgm/Shear Wall 3/26/2025 Approved JON MCHUGH
Insulation 4/3/2025 Not Ready for Inspection JON MCHUGH
Interior/Exterior Lathing 4/3/2025 Not Ready for Inspection JON MCHUGH
Insulation 4/10/2025 Not Ready for Inspection JON MCHUGH
Interior/Exterior Lathing 4/10/2025 Corrections Issued JON MCHUGH
BUILDING-Rough-Frame 4/14/2025 Corrections Issued JON MCHUGH
BUILDING-Rough-Frame 4/28/2025 Approved JON MCHUGH
Green Building Rough 4/28/2025 Approved JON MCHUGH
Insulation 4/28/2025 Approved JON MCHUGH
Interior/Exterior Lathing 4/28/2025 Approved JON MCHUGH
Verify Sprinkler Sign Off 4/28/2025 Approved JON MCHUGH
Drywall Nailing 5/5/2025 Approved JON MCHUGH
ELECTRICAL-Final 9/5/2025 No Access for Inspection SEAN WIRCH
HVAC-Final 9/5/2025 No Access for Inspection SEAN WIRCH
PLUMBING-Final 9/5/2025 No Access for Inspection SEAN WIRCH
Special/Order Compliance 10/9/2025 Corrections Issued SEAN WIRCH
ELECTRICAL-Final 10/15/2025 Not Ready for Inspection JON MCHUGH
Final 10/15/2025 Corrections Issued JON MCHUGH
Green Building Final 10/15/2025 Approved JON MCHUGH
HVAC-Final 10/15/2025 Not Ready for Inspection JON MCHUGH
PLUMBING-Final 10/15/2025 Not Ready for Inspection JON MCHUGH
SGSOV-Seismic Gas S/O Valve 10/15/2025 SGSOV Not Ready JON MCHUGH
Smoke Detectors 10/15/2025 Approved JON MCHUGH
Final 11/6/2025 Corrections Issued SEAN WIRCH
SGSOV-Seismic Gas S/O Valve 11/6/2025 SGSOV Approved SEAN WIRCH
ELECTRICAL-Final 11/25/2025 Approved JON MCHUGH
Final 11/25/2025 OK to Issue CofO JON MCHUGH
HVAC-Final 11/25/2025 Approved JON MCHUGH
PLUMBING-Final 11/25/2025 Approved JON MCHUGH