230 S CHADBOURNE AVE 90049

Certificate Information: 230 S CHADBOURNE AVE 90049

Application / Permit
24010-20000-02242
Plan Check / Job No.
B24VN07379
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
New two stories 83' 2 1/2" x 81' 10 1/2" Single Family Dwelling, with basement, and attached 2 car garage, and trellis. NFPA 13D sprinkler required. All work done per engineer.
Permit Issued
Issued on 11/6/2024
Issuing Office
Valley
Current Status
Issued on 11/6/2024
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 5/24/2024 APPLICANT
Assigned to Plan Check Engineer 6/13/2024 NAREG ATARIAN
Corrections Issued 6/20/2024 NAREG ATARIAN
Quality Review Completed 6/27/2024 OMID HEDAYAT
Building Plans Picked Up 7/1/2024 APPLICANT
Applicant returned to address corrections 8/14/2024 NAREG ATARIAN
Applicant returned to address corrections 9/4/2024 NAREG ATARIAN
Applicant returned to address corrections 10/25/2024 NAREG ATARIAN
Plan Check Approved 11/6/2024 NAREG ATARIAN
Issued 11/6/2024 APPLICANT

Permit Application Clearance Information

Address approval Cleared 8/19/2024 DARIN LAM
ZA Case Cleared 8/20/2024 JACQUELINE TORRES
Roof/Waste drainage to street Cleared 8/27/2024 DARIN LAM
Specific Plan Cleared 9/3/2024 HAMID GHAEMMAGHAMI
Eng Process Fee Ord 176,300 Cleared 9/9/2024 DARIN LAM
Sewer availability Cleared 9/9/2024 DARIN LAM
Trees in Parkway Cleared 9/23/2024 ADALBERTO VERA
GPI Written Notices Cleared 10/25/2024 JOHNNY MIRANDA
Grading Pre-Inspection Cleared 10/25/2024 JOHNNY MIRANDA
Permit Cleared 10/28/2024 DARIN LAM
Hydrant and Access approval Cleared 10/29/2024 KURT CORRAL
Excavation more than 5-ft deep Cleared 11/6/2024 CALOSHA APPROVED

Contact Information

Architect Jazayeri,, Siavash; Lic. No.: C22240 20230 WELLS DR      WOODLAND HILLS, CA 91364
Contractor Owner-Builder       ,
Engineer Mercado,, Lizandro; Lic. No.: S4331 27240 TURNBERRY LN STE 200      VALENCIA, CA 91355
Engineer Singer,, Joanne Chapin; Lic. No.: C26900 40530 KINSALE PL      INDIO, CA 92203
Engineer Smith,, Melvin Bruce; Lic. No.: GE2673 2165 N MARVEL AVE      SIMI VALLEY, CA 93065

Inspector Information

HERBERT GIRON, (310) 914-3891 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 2/6/2025 Not Ready for Inspection JESUS RODRIGUEZ
Deputy Reinf. Concrete 2/10/2025 Conditional Approval MICHAEL PELHAM
Deputy Reinf. Concrete 2/18/2025 No Access for Inspection KENNETH NAGLE
Deputy Reinf. Concrete 2/21/2025 Conditional Approval JESUS RODRIGUEZ
Special/Order Compliance 2/21/2025 Corrections Issued KENNETH NAGLE
Deputy Reinf. Concrete 2/26/2025 Conditional Approval JESUS RODRIGUEZ
Deputy Reinf. Concrete 2/28/2025 Conditional Approval JESUS RODRIGUEZ
PLUMBING-Rough 4/10/2025 Partial Approval HERBERT GIRON
Footing/Foundation/Slab 4/22/2025 Partial Approval HERBERT GIRON
Deputy Reinf. Concrete 4/25/2025 Conditional Approval HERBERT GIRON
Deputy Drilled-In Anchors 4/30/2025 Conditional Approval HERBERT GIRON
Deputy Reinf. Concrete 4/30/2025 Conditional Approval HERBERT GIRON
Deputy Reinf. Concrete 5/1/2025 Conditional Approval HERBERT GIRON
Excavation/Setback/Form/Re-Bar 5/2/2025 Corrections Issued HERBERT GIRON
Footing/Foundation/Slab 5/2/2025 Corrections Issued HERBERT GIRON
Reinforced Concrete Frame 5/2/2025 Corrections Issued HERBERT GIRON
Deputy Shotcrete 5/5/2025 Conditional Approval HERBERT GIRON
Deputy Shotcrete 5/6/2025 Conditional Approval HERBERT GIRON
Deputy Drilled-In Anchors 5/14/2025 Conditional Approval HERBERT GIRON
Deputy Reinf. Concrete 5/16/2025 Conditional Approval HERBERT GIRON
Deputy Reinf. Concrete 5/19/2025 Conditional Approval HERBERT GIRON
Deputy Reinf. Concrete 5/20/2025 Conditional Approval HERBERT GIRON
Deputy Reinf. Concrete 5/21/2025 Conditional Approval TEMISTOCLES CAAL
Excavation/Setback/Form/Re-Bar 5/22/2025 Partial Approval HERBERT GIRON
Footing/Foundation/Slab 5/22/2025 Partial Approval HERBERT GIRON
Deputy Reinf. Concrete 5/27/2025 Conditional Approval HERBERT GIRON
Deputy Reinf. Concrete 6/10/2025 No Access for Inspection MEL KHACHATOURIAN
Deputy Reinf. Concrete 6/11/2025 Conditional Approval HERBERT GIRON
Footing/Foundation/Slab 6/13/2025 Approved HERBERT GIRON
Deputy Reinf. Concrete 6/17/2025 Conditional Approval HERBERT GIRON
Deputy Steel/Welding 6/30/2025 Conditional Approval HERBERT GIRON
Deputy Steel/Welding 7/2/2025 Conditional Approval HERBERT GIRON
Deputy Steel/Welding 7/8/2025 Conditional Approval HERBERT GIRON
Structural Steel Frame 7/9/2025 Approved HERBERT GIRON
Floor/Roof Diaphrgm/Shear Wall 7/24/2025 Partial Approval HERBERT GIRON
Floor/Roof Diaphrgm/Shear Wall 9/23/2025 Partial Approval HERBERT GIRON
Floor/Roof Diaphrgm/Shear Wall 10/23/2025 Partial Approval HERBERT GIRON
PLUMBING-Rough 12/5/2025 Corrections Issued HERBERT GIRON
PLUMBING-Rough 1/13/2026 Approved HERBERT GIRON
Shower Pan 1/13/2026 Corrections Issued HERBERT GIRON
HVAC-Rough 1/21/2026 Corrections Issued HERBERT GIRON
Shower Pan 1/21/2026 Approved HERBERT GIRON
ELECTRICAL-Rough 1/28/2026 Corrections Issued HERBERT GIRON
ELECTRICAL-Rough 1/29/2026 Conditional Approval HERBERT GIRON
Floor/Roof Diaphrgm/Shear Wall 2/5/2026 Approved HERBERT GIRON
Interior/Exterior Lathing 2/5/2026 Approved HERBERT GIRON
BUILDING-Rough-Frame 2/9/2026 Partial Approval HERBERT GIRON
Green Building Rough 2/9/2026 Approved HERBERT GIRON
Light Gage Steel Frame 2/9/2026 Approved HERBERT GIRON
Verify Sprinkler Sign Off 2/9/2026 Approved HERBERT GIRON
Deputy Wood Construction 2/25/2026 Conditional Approval JUAN VALENZUELA
HVAC-Rough 3/25/2026 Approved HERBERT GIRON
Insulation 3/25/2026 Partial Approval HERBERT GIRON
Deputy Steel/Welding 5/8/2026 Conditional Approval DAVID FEILER
Drywall Nailing 5/21/2026 Approved EVAN COOPER