5324-5324 1/2 S 5TH AVE 90043

Certificate Information: 5324-5324 1/2 S 5TH AVE 90043

Application / Permit
24010-10000-04481
Plan Check / Job No.
B24LA28907
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
EPLAN: (N) 2-STORY BUILDING WITH ADU AND SB9 UNIT. SB9 PER SB9 TWO UNIT DEVELOPMENT. ATTACHED ADU PER LAMC 12.22 A.33 (c) & (e). TO BE EQUIPPED WITH NFPA 13D FIRE SPRINKLERS THROUGH OUT.
Permit Issued
Issued on 6/25/2025
Issuing Office
Current Status
Issued on 6/25/2025
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 11/14/2024 APPLICANT
Assigned to Plan Check Engineer 11/27/2024 ADRIANA LOPEZ
Corrections Issued 12/16/2024 ADRIANA LOPEZ
Quality Review Completed 12/24/2024 PRANITA SHAH
Plan Check Approved 6/17/2025 ADRIANA LOPEZ
Issued 6/25/2025 APPLICANT

Permit Application Clearance Information

Address approval Cleared 1/10/2025 TAL SHEMEN
Roof/Waste drainage to street Cleared 1/10/2025 TAL SHEMEN
Eng Process Fee Ord 176,300 Cleared 1/28/2025 TAL SHEMEN
Hydrant and Access approval Cleared 3/17/2025 KENNETH FRASER
Construction near power lines Cleared 4/16/2025 RIDWAN HARDY
Construction within easement Cleared 4/16/2025 RIDWAN HARDY
Sewer availability Cleared 5/6/2025 TAL SHEMEN
Senate Bill 9 Cleared 5/8/2025 GEORGIA SMITH

Contact Information

Contractor Owner-Builder       ,
Engineer Maalouf,, Sami; Lic. No.: C53210 15445 VENTURA BLVD STE 367      SHERMAN OAKS, CA 91403

Inspector Information

LUIS CASTRO, (213) 202-3436 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

PLUMBING-Rough 8/7/2025 Partial Approval LUIS CASTRO
Footing/Foundation/Slab 8/18/2025 Approved LUIS CASTRO
BUILDING-Rough-Frame 8/20/2025 Corrections Issued LUIS CASTRO
Green Building Rough 8/20/2025 Not Ready for Inspection LUIS CASTRO
Verify Sprinkler Sign Off 8/20/2025 Not Ready for Inspection LUIS CASTRO
Floor/Roof Diaphrgm/Shear Wall 9/11/2025 Corrections Issued LUIS CASTRO
Green Building Rough 9/11/2025 Not Ready for Inspection LUIS CASTRO
Verify Sprinkler Sign Off 9/11/2025 Not Ready for Inspection LUIS CASTRO
Deputy Wood Construction 9/15/2025 Conditional Approval RONNIE MEDINA
PLUMBING-Rough 10/31/2025 Approved LUIS CASTRO
Drywall Nailing 11/5/2025 Not Ready for Inspection LUIS CASTRO
Floor/Roof Diaphrgm/Shear Wall 11/5/2025 Partial Approval LUIS CASTRO
Green Building Rough 11/5/2025 Not Ready for Inspection LUIS CASTRO
BUILDING-Rough-Frame 12/18/2025 Not Ready for Inspection LUIS CASTRO
ELECTRICAL-Rough 12/18/2025 Corrections Issued LUIS CASTRO
Green Building Rough 12/18/2025 Not Ready for Inspection LUIS CASTRO
HVAC-Rough 12/18/2025 Corrections Issued LUIS CASTRO
Verify Sprinkler Sign Off 12/18/2025 Not Ready for Inspection LUIS CASTRO
ELECTRICAL-Rough 12/23/2025 Partial Approval LUIS CASTRO
HVAC-Rough 1/2/2026 Partial Approval LUIS CASTRO
Sewer 1/2/2026 Approved LUIS CASTRO
BUILDING-Rough-Frame 2/6/2026 Corrections Issued LUIS CASTRO
Green Building Rough 2/6/2026 Approved LUIS CASTRO
Interior/Exterior Lathing 2/6/2026 Corrections Issued LUIS CASTRO
Verify Sprinkler Sign Off 2/6/2026 Approved LUIS CASTRO
Smoke Detectors 3/26/2026 Not Ready for Inspection LUIS CASTRO
Underground Mechanical 3/26/2026 Partial Approval LUIS CASTRO
BUILDING-Rough-Frame 4/24/2026 Approved ALEX COLIN
Insulation 4/24/2026 Approved ALEX COLIN
Drywall Nailing 5/21/2026 Approved ALEX COLIN
Interior/Exterior Lathing 5/21/2026 Corrections Issued ALEX COLIN