1230 1/4-3/4 W 37TH DR 90007

Certificate Information: 1230 1/4-3/4 W 37TH DR 90007

Application / Permit
24010-10000-03246
Plan Check / Job No.
B24LA16446
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
EPLAN Addition and coversion of existing 5 car garage to creat a 2 story detached structure. 1 ADU on each floor. ADUs per CA Govt. Code 65852.2(e)(1)(D) and applicable part2 of LAMC 12.22 A.33(c)-(d), (g)
Permit Issued
Issued on 1/30/2025
Issuing Office
Current Status
Issued on 1/30/2025
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 8/2/2024 APPLICANT
Assigned to Plan Check Engineer 8/8/2024 MARCELA FRANQUEZ
Corrections Issued 8/10/2024 MARCELA FRANQUEZ
Quality Review Completed 8/16/2024 TU HUA
Applicant returned to address corrections 10/25/2024 MARCELA FRANQUEZ
Applicant returned to address corrections 11/26/2024 MARCELA FRANQUEZ
Plan Check Approved 12/24/2024 MARCELA FRANQUEZ
Issued 1/30/2025 APPLICANT

Permit Application Clearance Information

Address approval Cleared 9/13/2024 CHRISTINA BRACO
Metro Rail approval Cleared 9/16/2024 JENNIFER SU
Roof/Waste drainage to street Cleared 9/27/2024 DAVID VO
Eng Process Fee Ord 176,300 Cleared 10/9/2024 CHRISTINA BRACO
Sewer availability Cleared 10/9/2024 CHRISTINA BRACO
Community Plan Implem. Overlay Cleared 11/27/2024 ANACANY HURTADO

Contact Information

Architect Crockett,, Cameron; Lic. No.: NA31503       ,
Contractor Tcm Renovations Corp; Lic. No.: 1087065-B       ,

Inspector Information

SABAS ALONSO, (213) 202-3468 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 3/13/2025 Corrections Issued ALFREDO LOPEZ
Pre-Inspection 3/18/2025 Partial Approval ALFREDO LOPEZ
Footing/Foundation/Slab 7/11/2025 Not Ready for Inspection ALFREDO LOPEZ
Footing/Foundation/Slab 7/23/2025 Not Ready for Inspection ALFREDO LOPEZ
Pre-Inspection 7/23/2025 Not Ready for Inspection ALFREDO LOPEZ
Pre-Inspection 7/25/2025 Not Ready for Inspection ALFREDO LOPEZ
Pre-Inspection 7/29/2025 Corrections Issued SABAS ALONSO
Excavation/Setback/Form/Re-Bar 9/3/2025 Corrections Issued SABAS ALONSO
Excavation/Setback/Form/Re-Bar 9/8/2025 Approved SABAS ALONSO
Footing/Foundation/Slab 9/8/2025 Approved SABAS ALONSO
Floor/Roof Diaphrgm/Shear Wall 2/19/2026 Corrections Issued SABAS ALONSO
Green Building Rough 3/13/2026 Corrections Issued SABAS ALONSO
Interior/Exterior Lathing 3/13/2026 Partial Approval SABAS ALONSO
Floor/Roof Diaphrgm/Shear Wall 3/26/2026 Approved SABAS ALONSO
Green Building Rough 3/26/2026 Approved SABAS ALONSO
Wood Frame 3/26/2026 Approved SABAS ALONSO
Insulation 4/2/2026 Approved SABAS ALONSO
Drywall Nailing 5/6/2026 Approved SABAS ALONSO
Final 6/22/2026 Corrections Issued SABAS ALONSO
Green Building Final 6/22/2026 Approved SABAS ALONSO
SGSOV-Seismic Gas S/O Valve 6/22/2026 SGSOV Approved SABAS ALONSO
Smoke Detectors 6/22/2026 Approved SABAS ALONSO
Final 7/2/2026 Corrections Issued SABAS ALONSO
Final 7/16/2026 Not Ready for Inspection SABAS ALONSO