2030-2032 S LINNINGTON AVE 90025

Certificate Information: 2030-2032 S LINNINGTON AVE 90025

Application / Permit
24010-10000-00911
Plan Check / Job No.
B24LA03984
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
EPLAN New 2-story single family residence with attached accessory dwelling unit per LAMC 12.22 A.33(c) and (e) and attached two car garage NFPA13D SPRINKLERED THROUGH OUT
Permit Issued
Issued on 9/23/2024
Issuing Office
Current Status
Issued on 9/23/2024
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 3/5/2024 APPLICANT
Assigned to Plan Check Engineer 3/21/2024 JAD BASMA
Corrections Issued 3/23/2024 JAD BASMA
Quality Review Completed 4/4/2024 GARO TELMI
Applicant returned to address corrections 5/16/2024 JAD BASMA
Plan Check Approved 9/17/2024 JAD BASMA
Plan Check Approved 9/20/2024 JAD BASMA
Issued 9/23/2024 APPLICANT

Permit Application Clearance Information

Address approval Cleared 4/12/2024 VLADIMIR ARUTYUNYAN
Hydrant and Access approval Cleared 5/18/2024 JOHN CONNEALLY
GPI Written Notices Cleared 5/23/2024 JAD BASMA
Grading Pre-Inspection Cleared 5/23/2024 JAD BASMA
Specific Plan Cleared 5/29/2024 RICHARD WOO
Trees in Parkway Cleared 6/5/2024 ADALBERTO VERA
Eng Process Fee Ord 176,300 Cleared 6/13/2024 VLADIMIR ARUTYUNYAN
Low Impact Development (LID) Cleared 8/22/2024 MARCO SANCHEZ
Permit Cleared 9/5/2024 BRENDEN HAWK
Roof/Waste drainage to street Cleared 9/5/2024 BRENDEN HAWK
Sewer availability Cleared 9/5/2024 BRENDEN HAWK

Contact Information

Architect Abramson,, Trevor David; Lic. No.: NA17597       ,
Contractor Zuma Canyon Construction Inc; Lic. No.: 644942-B       ,
Engineer Sayah,, Daniel H; Lic. No.: NA6000       ,

Inspector Information

DAVID SCANTLIN, (310) 914-3863 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 10/30/2024 Corrections Issued STEPHANIE SWANSON
Excavation/Setback/Form/Re-Bar 2/11/2025 Corrections Issued BOBBY KEY
Deputy Reinf. Concrete 3/4/2025 Conditional Approval MICHAEL PELHAM
Deputy Reinf. Concrete 3/5/2025 Conditional Approval STEPHANIE SWANSON
Footing/Foundation/Slab 3/5/2025 Corrections Issued STEPHANIE SWANSON
METHANE-Barrier 3/5/2025 Not Ready for Inspection STEPHANIE SWANSON
METHANE-Subgrade 3/5/2025 Not Ready for Inspection STEPHANIE SWANSON
Excavation/Setback/Form/Re-Bar 3/6/2025 Partial Approval STEPHANIE SWANSON
Deputy Reinf. Concrete 3/7/2025 Conditional Approval MICHAEL PELHAM
Deputy Reinf. Concrete 3/18/2025 Conditional Approval DANIEL VERA
Deputy Reinf. Concrete 4/30/2025 Conditional Approval MICHAEL PELHAM
Footing/Foundation/Slab 5/27/2025 Not Ready for Inspection DANIEL VERA
HVAC-Rough 5/27/2025 Not Ready for Inspection DANIEL VERA
METHANE-Barrier 5/27/2025 Not Ready for Inspection DANIEL VERA
METHANE-Subgrade 5/27/2025 Not Ready for Inspection DANIEL VERA
Underground Mechanical 5/27/2025 Partial Approval DANIEL VERA
Deputy Methane Barrier 5/30/2025 Conditional Approval ASHLEY THOMPSON
Excavation/Setback/Form/Re-Bar 5/30/2025 Partial Approval ASHLEY THOMPSON
METHANE-Subgrade 5/30/2025 Partial Approval ASHLEY THOMPSON
Deputy Methane Barrier 6/13/2025 Conditional Approval DANIEL VERA
Footing/Foundation/Slab 6/16/2025 Approved DANIEL VERA
METHANE-Barrier 6/16/2025 Approved DANIEL VERA
METHANE-Subgrade 6/16/2025 Approved DANIEL VERA
Sewer 7/2/2025 Partial Approval DANIEL VERA
Sewer 7/10/2025 Approved DANIEL VERA
Deputy Steel/Welding 7/16/2025 Conditional Approval MICHAEL PELHAM
Deputy Steel/Welding 7/17/2025 Conditional Approval MICHAEL PELHAM
Floor/Roof Diaphrgm/Shear Wall 8/11/2025 Corrections Issued DANIEL VERA
Floor/Roof Diaphrgm/Shear Wall 8/12/2025 Partial Approval MICHAEL ALLEN
Structural Steel Frame 8/14/2025 Not Ready for Inspection DANIEL VERA
Structural Steel Frame 8/15/2025 Approved DANIEL VERA
Floor/Roof Diaphrgm/Shear Wall 8/27/2025 Corrections Issued DANIEL VERA
PLUMBING-Rough 10/10/2025 Not Ready for Inspection DANIEL VERA
Underground Mechanical 10/10/2025 Corrections Issued DANIEL VERA
PLUMBING-Rough 10/15/2025 Partial Approval JESUS RODRIGUEZ
PLUMBING-Rough 10/17/2025 Approved DANIEL VERA
HVAC-Rough 10/20/2025 Corrections Issued DANIEL VERA
Floor/Roof Diaphrgm/Shear Wall 11/3/2025 Not Ready for Inspection DANIEL VERA
HVAC-Rough 11/3/2025 Not Ready for Inspection DANIEL VERA
METHANE-Rough 11/3/2025 Approved DANIEL VERA
Floor/Roof Diaphrgm/Shear Wall 11/7/2025 Partial Approval RUBEN RIVAS
HVAC-Rough 11/7/2025 Partial Approval RUBEN RIVAS
ELECTRICAL-Rough 1/6/2026 Corrections Issued EVAN COOPER
Underground Mechanical 1/26/2026 Partial Approval RYAN SALAZAR
ELECTRICAL-Rough 1/29/2026 Approved RYAN SALAZAR
Insulation 1/29/2026 Partial Approval RYAN SALAZAR
BUILDING-Rough-Frame 2/3/2026 Approved Pending GreenApproval RYAN SALAZAR
Green Building Final 2/3/2026 Not Ready for Inspection RYAN SALAZAR
Insulation 2/3/2026 Approved RYAN SALAZAR
Interior/Exterior Lathing 2/3/2026 Not Ready for Inspection RYAN SALAZAR
Verify Sprinkler Sign Off 2/3/2026 Approved RYAN SALAZAR
Interior/Exterior Lathing 2/10/2026 Not Ready for Inspection RYAN SALAZAR
Shower Pan 2/10/2026 Approved RYAN SALAZAR
Drywall Nailing 2/13/2026 Approved CARLOS MATAMOROS
Interior/Exterior Lathing 2/19/2026 Partial Approval RYAN SALAZAR
Interior/Exterior Lathing 2/27/2026 Approved CARLOS MATAMOROS
Service/Power Release 4/24/2026 Not Ready for Inspection RYAN SALAZAR
ELECTRICAL-Final 6/11/2026 Not Ready for Inspection DAVID SCANTLIN
Service/Power Release 6/11/2026 Not Ready for Inspection DAVID SCANTLIN
ELECTRICAL-Final 7/14/2026 Approved DAVID SCANTLIN
PLUMBING-Rough 7/14/2026 Approved DAVID SCANTLIN
Service/Power Release 7/14/2026 Approved DAVID SCANTLIN