1532 S HI POINT ST 90035

Certificate Information: 1532 S HI POINT ST 90035

Application / Permit
24010-10000-00599
Plan Check / Job No.
B24LA02758
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
*eplan* NEW 5 STORY TYPE IIIA 50 UNITS (39 LI + 10 MI+1 MNGR) AFFORDABLE HOUSING APARTMENT, USING 12.22.A.25/AB1763/AB2345 INCENTIVES
Permit Issued
Issued on 5/29/2025
Issuing Office
Current Status
Issued on 5/29/2025
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 2/14/2024 APPLICANT
Assigned to Plan Check Engineer 2/15/2024 KEVIN MORALES
Assigned to Zoning Architect 2/15/2024 LY CHEA
Corrections Issued 2/22/2024 KEVIN MORALES
Quality Review Completed 2/26/2024 EUGENE BARBEAU
Plan Check Approved 1/15/2025 KEVIN MORALES
Issued 5/29/2025 APPLICANT

Permit Application Clearance Information

Address approval Cleared 2/26/2024 WALLIE JONG
Highway dedication Cleared 2/26/2024 WALLIE JONG
Eng Process Fee Ord 176,300 Cleared 2/27/2024 WALLIE JONG
Sewer availability Cleared 3/26/2024 JEANIE LAM
Building over 36-ft Cleared 5/14/2024 CALOSHA APPROVED
Hydrant and Access approval Cleared 5/22/2024 JOHN CONNEALLY
Green Code Cleared 5/29/2024 KEVIN MORALES
Fire Marshal Fire Life Safety Cleared 6/4/2024 MENOA AGHAJANI
Low Impact Development (LID) Cleared 6/7/2024 SARAH YOUSSEF
Roof/Waste drainage to street Cleared 6/10/2024 JEANIE LAM
Density Bonus Cleared 9/24/2024 OLIVIA JIN
SB8 RUD Cleared 9/24/2024 OLIVIA JIN
"Q" conditions Cleared 10/15/2024 YINGSHI HUANG
Miscellaneous Cleared 10/15/2024 YINGSHI HUANG
Miscellaneous Cleared 10/15/2024 YINGSHI HUANG
Miscellaneous Cleared 10/15/2024 YINGSHI HUANG
Miscellaneous Cleared 10/15/2024 YINGSHI HUANG
Opn space landscape/Water mgmt Cleared 10/15/2024 YINGSHI HUANG
Frnt yard landscape/Water mgmt Cleared 10/17/2024 YINGSHI HUANG
DAS Clearance Cleared 11/6/2024 KEVIN MORALES
Miscellaneous Cleared 12/3/2024 YINGSHI HUANG
Zoning Plan Check Cleared 12/13/2024 Rodolfo Arias

Contact Information

Architect Holtz,, Donald Lee; Lic. No.: C21677 700 S FLOWER ST #1000      LOS ANGELES, CA 90017
Contractor H T A Construction & Development; Lic. No.: 1044038-B       ,
Contractor Hta Construction & Development; Lic. No.: 1044038-B       ,
Engineer Hwang,, Junho; Lic. No.: S5592 2450 W MAIN ST      ALHAMBRA, CA 91801
Engineer Jahani,, Fereidoun; Lic. No.: C62875 3720 BLANCHE ST      PASADENA, CA 91107
Engineer Kim,, Hosang; Lic. No.: C67288 18759 WILLOWTREE LANE      PORTER RANCH, CA 91326

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 7/23/2025 Partial Approval RAFAEL CORTES
METHANE-Barrier 7/23/2025 Partial Approval RAFAEL CORTES
METHANE-Subgrade 7/23/2025 Partial Approval RAFAEL CORTES
Pre-Inspection 7/24/2025 No Access for Inspection RAFAEL CORTES
Footing/Foundation/Slab 9/3/2025 Not Ready for Inspection RAFAEL CORTES
METHANE-Barrier 9/3/2025 Not Ready for Inspection RAFAEL CORTES
METHANE-Subgrade 9/3/2025 Not Ready for Inspection RAFAEL CORTES
Footing/Foundation/Slab 9/4/2025 Partial Approval RAFAEL CORTES
Floor/Roof Diaphrgm/Shear Wall 9/26/2025 Partial Approval RAFAEL CORTES
Deputy Wood Construction 10/14/2025 Conditional Approval RAFAEL CORTES
Floor/Roof Diaphrgm/Shear Wall 10/14/2025 Partial Approval RAFAEL CORTES
Wood Frame 11/3/2025 Partial Approval EDWIN GREGORYONA
Wood Frame 11/26/2025 Partial Approval EDWIN GREGORYONA
Wood Frame 12/10/2025 Not Ready for Inspection RAFAEL CORTES
Wood Frame 12/12/2025 Partial Approval RAFAEL CORTES
Wood Frame 12/15/2025 Partial Approval EDWIN GREGORYONA
Structural Steel Frame 12/17/2025 Not Ready for Inspection EDWIN GREGORYONA
Wood Frame 12/17/2025 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 12/18/2025 Partial Approval EDWIN GREGORYONA
Wood Frame 12/22/2025 No Access for Inspection RAFAEL ESPINOZA
Drywall Nailing 1/9/2026 Not Ready for Inspection RAFAEL CORTES
Drywall Nailing 1/13/2026 Not Ready for Inspection RAFAEL CORTES
Wood Frame 1/14/2026 Partial Approval EDWIN GREGORYONA
Wood Frame 1/16/2026 Not Ready for Inspection RAFAEL CORTES
Deputy Steel/Welding 1/20/2026 Conditional Approval OSVALDO PARAMO
Wood Frame 1/21/2026 Partial Approval EDWIN GREGORYONA
Structural Steel Frame 1/23/2026 Partial Approval RAFAEL CORTES
Wood Frame 1/27/2026 Corrections Issued RAFAEL CORTES
Wood Frame 1/28/2026 Not Ready for Inspection RAFAEL CORTES
Insulation 2/2/2026 No Access for Inspection RAFAEL CORTES
Pre-Inspection 2/4/2026 Not Ready for Inspection RAFAEL CORTES
Pre-Inspection 2/5/2026 Partial Approval RAFAEL CORTES
Insulation 2/6/2026 Partial Approval RAFAEL CORTES
Insulation 2/9/2026 Partial Inspection RAFAEL CORTES
Pre-Inspection 2/11/2026 Partial Approval RAFAEL CORTES
Pre-Inspection 2/12/2026 Partial Approval RAFAEL CORTES
Drywall Nailing 2/18/2026 Partial Approval RAFAEL CORTES
Insulation 2/20/2026 Partial Approval RAFAEL CORTES
Deputy Wood Construction 2/24/2026 Conditional Approval RAFAEL CORTES
Drywall Nailing 2/24/2026 Not Ready for Inspection RAFAEL CORTES
Insulation 2/26/2026 Partial Approval RAFAEL CORTES
Insulation 2/27/2026 Not Ready for Inspection RAFAEL CORTES
Insulation 3/2/2026 Partial Approval RAFAEL CORTES
Drywall Nailing 3/6/2026 Partial Approval RAFAEL CORTES
Wood Frame 3/10/2026 Partial Approval RAFAEL CORTES
Insulation 3/11/2026 Partial Approval RAFAEL CORTES
Wood Frame 3/16/2026 Not Ready for Inspection RAFAEL CORTES
Wood Frame 3/17/2026 Partial Approval RAFAEL CORTES
Interior/Exterior Lathing 3/18/2026 Approved RAFAEL CORTES
Light Gage Steel Frame 3/24/2026 Not Ready for Inspection RAFAEL CORTES
Wood Frame 3/24/2026 Corrections Issued RAFAEL CORTES
Insulation 3/27/2026 Partial Approval MARTIN TAVITIAN
Insulation 4/1/2026 Not Ready for Inspection RAFAEL CORTES
Wall Anchors 4/23/2026 Not Ready for Inspection RAFAEL CORTES
Drywall Nailing 4/27/2026 Partial Approval RAFAEL CORTES
T-Bar Ceiling 4/27/2026 Not Ready for Inspection RAFAEL CORTES
Green Building Rough 4/28/2026 No Access for Inspection RAFAEL CORTES
METHANE-Rough 4/28/2026 Not Ready for Inspection RAFAEL CORTES
Reinforced Masonry Frame 4/28/2026 Not Ready for Inspection RAFAEL CORTES
Verify Sprinkler Sign Off 4/28/2026 Not Ready for Inspection RAFAEL CORTES
Wood Frame 4/30/2026 Not Ready for Inspection RAFAEL CORTES
Pre-Inspection 5/1/2026 Partial Approval CHRISTOPHER BLACKWOOD
Drywall Nailing 5/4/2026 Partial Approval RAFAEL CORTES
T-Bar Ceiling 5/6/2026 Partial Approval RAFAEL CORTES
Drywall Nailing 5/11/2026 Partial Approval RAFAEL CORTES
Wall Anchors 5/18/2026 Partial Approval RAFAEL CORTES
Drywall Nailing 5/20/2026 No Access for Inspection RAFAEL CORTES
Drywall Nailing 5/26/2026 Partial Approval RAFAEL CORTES
Insulation 6/1/2026 No Access for Inspection RAFAEL CORTES
Insulation 6/2/2026 Partial Approval RAFAEL CORTES
T-Bar Ceiling 6/5/2026 No Access for Inspection RAFAEL CORTES
T-Bar Ceiling 6/8/2026 Partial Approval RAFAEL CORTES
Insulation 6/9/2026 Partial Approval RAFAEL CORTES
Light Gage Steel Frame 6/10/2026 No Access for Inspection RAFAEL CORTES
Drywall Nailing 6/23/2026 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 6/23/2026 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 6/24/2026 Partial Approval RAFAEL CORTES
Insulation 6/26/2026 Approved RAFAEL CORTES
Drywall Nailing 7/2/2026 Partial Approval RAFAEL CORTES
Drywall Nailing 7/7/2026 Partial Approval RAFAEL CORTES