12345 W LA MAIDA ST 91607
Certificate Information: 12345 W LA MAIDA ST 91607
- Application / Permit
- 23047-20000-01938
- Plan Check / Job No.
- B23VN17449
- Group
- Building
- Type
- Swimming-Pool/Spa
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (20) Pool/Spa - Private
- Work Description
- NEW 13'4" X 28' SWIMMING POOL WITH (2) BAJAS AND 6'10" X 9' SPA WITHIN PER LA CITY STANDARD PLAN #268.
- Permit Issued
- Issued on 4/11/2024
- Issuing Office
- Current Status
- CofO Issued on 11/15/2024
- Certificate of Occupancy
- CofO Issued More Information
Permit Application Status History
| Submitted | 12/20/2023 | APPLICANT |
| Assigned to Plan Check Engineer | 12/20/2023 | DANIEL ABRAMYAN |
| Corrections Issued | 12/20/2023 | DANIEL ABRAMYAN |
| Issued | 4/11/2024 | APPLICANT |
| CofO in Progress | 9/12/2024 | JOSE AVILA |
| Permit Finaled | 11/15/2024 | DANIEL ORRANTE |
| CofO Issued | 11/15/2024 | DANIEL ORRANTE |
| Permit Finaled | 11/15/2024 | DANIEL ORRANTE |
Permit Application Clearance Information
| Construction near power lines | Cleared | 3/8/2024 | RIDWAN HARDY |
| Construction within easement | Cleared | 3/8/2024 | RIDWAN HARDY |
Contact Information
| Contractor | Royal Moon Pools Inc; Lic. No.: 1041907-C53 | P O BOX 1044 ROSAMOND, CA 93560 |
| Engineer | Biedenbach,, Christopher James; Lic. No.: C74003 | 1201 N TUSTIN AVE ANAHEIM, CA 92807 |
Inspector Information
| WAYNE REGESTER, (818) 374-1164 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Gas Piping or Gas Test | 5/8/2024 | Corrections Issued | ROBERTO PALACIOS-LOPEZ |
| Pre-Gunite | 5/8/2024 | Corrections Issued | ROBERTO PALACIOS-LOPEZ |
| SGSOV-Seismic Gas S/O Valve | 5/8/2024 | SGSOV Not Ready | ROBERTO PALACIOS-LOPEZ |
| SGSOV-Seismic Gas S/O Valve | 5/13/2024 | SGSOV Not Ready | ROBERTO PALACIOS-LOPEZ |
| Gas Piping or Gas Test | 5/21/2024 | Partial Approval | JACK KARGODORIAN |
| Pre-Gunite | 5/21/2024 | Corrections Issued | JACK KARGODORIAN |
| Rough-Plumbing | 5/24/2024 | Corrections Issued | OGANES TARAKHCHYAN |
| Pre-Gunite | 6/21/2024 | Conditional Approval | SALVADOR MARTINEZ |
| Grounding or Bonding | 7/2/2024 | Approved | JUAN VALENZUELA |
| Enclosure/Fence | 7/19/2024 | Not Ready for Inspection | OGANES TARAKHCHYAN |
| Enclosure/Fence | 7/31/2024 | Approved | JOSE AVILA |
| Excavation/Setback/Form/Re-Bar | 8/7/2024 | Approved | KEVIN BERBERYAN |
| Final | 8/7/2024 | Corrections Issued | KEVIN BERBERYAN |
| Pre-Gunite | 8/7/2024 | Approved | KEVIN BERBERYAN |
| SGSOV-Seismic Gas S/O Valve | 8/7/2024 | SGSOV Approved | KEVIN BERBERYAN |
| Equipment Noise Level | 8/12/2024 | Approved | ALFREDO FLORES |
| Pool Equipment Noise Test | 8/12/2024 | Approved | ALFREDO FLORES |
| Final | 8/14/2024 | Corrections Issued | ROBERTO PALACIOS-LOPEZ |
| Final | 9/4/2024 | Conditional Approval | CHRISTOPHE COCHRAN |
| Final | 9/10/2024 | OK to Issue CofO | JOSE AVILA |