12345 W LA MAIDA ST 91607

Certificate Information: 12345 W LA MAIDA ST 91607

Application / Permit
23047-20000-01938
Plan Check / Job No.
B23VN17449
Group
Building
Type
Swimming-Pool/Spa
Sub-Type
1 or 2 Family Dwelling
Primary Use
(20) Pool/Spa - Private
Work Description
NEW 13'4" X 28' SWIMMING POOL WITH (2) BAJAS AND 6'10" X 9' SPA WITHIN PER LA CITY STANDARD PLAN #268.
Permit Issued
Issued on 4/11/2024
Issuing Office
Current Status
CofO Issued on 11/15/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/20/2023 APPLICANT
Assigned to Plan Check Engineer 12/20/2023 DANIEL ABRAMYAN
Corrections Issued 12/20/2023 DANIEL ABRAMYAN
Issued 4/11/2024 APPLICANT
CofO in Progress 9/12/2024 JOSE AVILA
Permit Finaled 11/15/2024 DANIEL ORRANTE
CofO Issued 11/15/2024 DANIEL ORRANTE
Permit Finaled 11/15/2024 DANIEL ORRANTE

Permit Application Clearance Information

Construction near power lines Cleared 3/8/2024 RIDWAN HARDY
Construction within easement Cleared 3/8/2024 RIDWAN HARDY

Contact Information

Contractor Royal Moon Pools Inc; Lic. No.: 1041907-C53 P O BOX 1044      ROSAMOND, CA 93560
Engineer Biedenbach,, Christopher James; Lic. No.: C74003 1201 N TUSTIN AVE      ANAHEIM, CA 92807

Inspector Information

WAYNE REGESTER, (818) 374-1164 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Gas Piping or Gas Test 5/8/2024 Corrections Issued ROBERTO PALACIOS-LOPEZ
Pre-Gunite 5/8/2024 Corrections Issued ROBERTO PALACIOS-LOPEZ
SGSOV-Seismic Gas S/O Valve 5/8/2024 SGSOV Not Ready ROBERTO PALACIOS-LOPEZ
SGSOV-Seismic Gas S/O Valve 5/13/2024 SGSOV Not Ready ROBERTO PALACIOS-LOPEZ
Gas Piping or Gas Test 5/21/2024 Partial Approval JACK KARGODORIAN
Pre-Gunite 5/21/2024 Corrections Issued JACK KARGODORIAN
Rough-Plumbing 5/24/2024 Corrections Issued OGANES TARAKHCHYAN
Pre-Gunite 6/21/2024 Conditional Approval SALVADOR MARTINEZ
Grounding or Bonding 7/2/2024 Approved JUAN VALENZUELA
Enclosure/Fence 7/19/2024 Not Ready for Inspection OGANES TARAKHCHYAN
Enclosure/Fence 7/31/2024 Approved JOSE AVILA
Excavation/Setback/Form/Re-Bar 8/7/2024 Approved KEVIN BERBERYAN
Final 8/7/2024 Corrections Issued KEVIN BERBERYAN
Pre-Gunite 8/7/2024 Approved KEVIN BERBERYAN
SGSOV-Seismic Gas S/O Valve 8/7/2024 SGSOV Approved KEVIN BERBERYAN
Equipment Noise Level 8/12/2024 Approved ALFREDO FLORES
Pool Equipment Noise Test 8/12/2024 Approved ALFREDO FLORES
Final 8/14/2024 Corrections Issued ROBERTO PALACIOS-LOPEZ
Final 9/4/2024 Conditional Approval CHRISTOPHE COCHRAN
Final 9/10/2024 OK to Issue CofO JOSE AVILA