5213 E ITHACA AVE 90032

Certificate Information: 5213 E ITHACA AVE 90032

Application / Permit
23047-10000-01572
Plan Check / Job No.
B23LA18583
Group
Building
Type
Swimming-Pool/Spa
Sub-Type
1 or 2 Family Dwelling
Primary Use
(20) Pool/Spa - Private
Work Description
ePlan 1. (N) SWIMMING POOL, 10'-8" x 14'-8", 4 FT MAX DEPTH, PER STANDARD PLAN #268 1 OF 2
Permit Issued
Issued on 1/19/2024
Issuing Office
Current Status
CofO Issued on 5/15/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 10/3/2023 APPLICANT
Assigned to Plan Check Engineer 10/5/2023 ADRIANA LOPEZ
Corrections Issued 10/9/2023 ADRIANA LOPEZ
Quality Review Completed 10/19/2023 FARUK SEZER
Applicant returned to address corrections 12/14/2023 ADRIANA LOPEZ
Plan Check Approved 1/19/2024 ADRIANA LOPEZ
Issued 1/19/2024 APPLICANT
CofO in Progress 5/9/2024 LILIANA PORTILLO
Permit Finaled 5/15/2024 DEROLD HAUFF
CofO Issued 5/15/2024 DEROLD HAUFF
Permit Finaled 5/15/2024 DEROLD HAUFF

Permit Application Clearance Information

"Q" conditions Cleared 10/20/2023 MAXFIELD VERMY
ZI Cleared 10/20/2023 MAXFIELD VERMY

Contact Information

Contractor Pacific Outdoor Living; Lic. No.: 715731-B       ,
Contractor Pacific Pavingstone Inc; Lic. No.: 715731-B       ,
Engineer Tsao,, Tze-Tzong; Lic. No.: C46886 9428 ETON AVE STE M      CHATSWORTH, CA 91311
Geologist Tsao,, Tze-Tzong; Lic. No.: EG1783 9428 ETON AVENUE #M      CHATSWORTH, CA 91311

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Pre-Gunite 3/12/2024 Approved LILIANA PORTILLO
Rough-Electrical 3/12/2024 Approved LILIANA PORTILLO
Rough-Plumbing 3/12/2024 Approved LILIANA PORTILLO
Deputy Shotcrete 3/14/2024 Conditional Approval LILIANA PORTILLO
Deck 3/29/2024 Approved LILIANA PORTILLO
Enclosure/Fence 4/17/2024 Corrections Issued LILIANA PORTILLO
Enclosure/Fence 4/19/2024 Approved LILIANA PORTILLO
Equipment Noise Level 4/30/2024 Approved JUAN ESCOTO DELGADO
Excavation/Setback/Form/Re-Bar 5/3/2024 Approved LILIANA PORTILLO
Final 5/3/2024 Corrections Issued LILIANA PORTILLO
SGSOV-Seismic Gas S/O Valve 5/3/2024 SGSOV Approved LILIANA PORTILLO
Final 5/8/2024 OK to Issue CofO LILIANA PORTILLO