1271 N SUNSET PLAZA DR 90069

Certificate Information: 1271 N SUNSET PLAZA DR 90069

Application / Permit
23047-10000-01438
Plan Check / Job No.
B23LA16896
Group
Building
Type
Swimming-Pool/Spa
Sub-Type
1 or 2 Family Dwelling
Primary Use
(20) Pool/Spa - Private
Work Description
CONSTRUCTING A HOT TUB WITHIN AN EXISTING POOL. RESURFACING OF THE POOL
Permit Issued
Issued on 9/19/2023
Issuing Office
Current Status
CofO Issued on 5/17/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 9/10/2023 APPLICANT
Assigned to Plan Check Engineer 9/14/2023 DANIEL YIP
Corrections Issued 9/14/2023 DANIEL YIP
Plan Check Approved 9/19/2023 JOE VO
Issued 9/19/2023 APPLICANT
CofO in Progress 5/15/2025 BRIAN SULLIVAN
Permit Finaled 5/17/2025 DEROLD HAUFF
CofO Issued 5/17/2025 DEROLD HAUFF
Permit Finaled 5/17/2025 DEROLD HAUFF

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Owner-Builder       ,
Engineer Biedenbach,, Christopher James; Lic. No.: C74003 1201 N TUSTIN AVE      ANAHEIM, CA 92807

Inspector Information

BRENDAN MORELLI, (213) 202-3412 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 9/28/2023 Partial Approval RAUL BARAJAS
Pre-Gunite 9/28/2023 Corrections Issued RAUL BARAJAS
Rough-Plumbing 9/28/2023 Approved RAUL BARAJAS
Deputy Drilled-In Anchors 10/3/2023 Conditional Approval BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 10/4/2023 Approved RAUL BARAJAS
Grounding or Bonding 10/4/2023 Approved RAUL BARAJAS
Pre-Gunite 10/4/2023 Approved RAUL BARAJAS
Final 11/1/2024 Corrections Issued RAUL BARAJAS
SGSOV-Seismic Gas S/O Valve 11/1/2024 SGSOV Not Ready RAUL BARAJAS
Final 4/28/2025 Not Ready for Inspection ROY SPAULDING
SGSOV-Seismic Gas S/O Valve 4/28/2025 SGSOV Not Ready ROY SPAULDING
Final 5/1/2025 Not Ready for Inspection BRIAN SULLIVAN
SGSOV-Seismic Gas S/O Valve 5/1/2025 SGSOV Not Ready BRIAN SULLIVAN
Enclosure/Fence 5/7/2025 Corrections Issued CRAIG VAUGHAN
Final 5/7/2025 Not Ready for Inspection CRAIG VAUGHAN
SGSOV-Seismic Gas S/O Valve 5/7/2025 SGSOV Not Ready CRAIG VAUGHAN
Enclosure/Fence 5/12/2025 Approved ROY SPAULDING
Pool Equipment Noise Test 5/13/2025 Approved ANDEY CHAPARRO
Final 5/14/2025 OK to Issue CofO BRIAN SULLIVAN
SGSOV-Seismic Gas S/O Valve 5/14/2025 SGSOV Approved BRIAN SULLIVAN