321 N CLIFFWOOD AVE 90049

Certificate Information: 321 N CLIFFWOOD AVE 90049

Application / Permit
23020-30000-01705
Plan Check / Job No.
B23WL02215
Group
Building
Type
Nonbldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(23) Fence Wall
Work Description
NEW FREESTANDING WALL WITH OUTDOOR FIREPLACE
Permit Issued
Issued on 2/29/2024
Issuing Office
West Los Angeles
Current Status
Issued on 2/29/2024

Permit Application Status History

Submitted 9/1/2023 APPLICANT
Assigned to Plan Check Engineer 9/8/2023 EDWIN ESPIN
Corrections Issued 9/11/2023 EDWIN ESPIN
Building Plans Picked Up 9/12/2023 APPLICANT
Applicant returned to address corrections 12/11/2023 CAROLEAN BASMA
Plan Check Approved 2/6/2024 AMY GUEVARRA
Issued 2/29/2024 APPLICANT

Permit Application Clearance Information

ZA Case Cleared 9/13/2023 DALIA MOKAYED
Grading Pre-Inspection Cleared 12/11/2023 ROBERT HUGHES
Construction near power lines Cleared 2/1/2024 RIDWAN HARDY

Contact Information

Contractor Rjc Builders Inc; Lic. No.: 740011-B 3017 SANTA MONICA BLVD #303      SANTA MONICA, CA 90404
Engineer Kwan,, Denny Chi-Ho; Lic. No.: S4887 5638 NEWFIELDS LN      DUBLIN, CA 94568

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 4/24/2024 Corrections Issued KEVIN SARGSYAN
Footing/Foundation/Slab 4/24/2024 Not Ready for Inspection KEVIN SARGSYAN
Excavation/Setback/Form/Re-Bar 5/13/2024 Partial Approval KEVIN SARGSYAN
Footing/Foundation/Slab 5/13/2024 Partial Approval KEVIN SARGSYAN
Deputy Reinf. Concrete 5/17/2024 Conditional Approval KEVIN SARGSYAN
Deputy Drilled-In Anchors 6/25/2024 Conditional Approval KEVIN SARGSYAN
Deputy Reinf. Concrete 6/25/2024 Conditional Approval KEVIN SARGSYAN
Reinforced Concrete Frame 6/26/2024 Approved ARAM AVEDISIAN
Deputy Reinf. Concrete 7/1/2024 No Access for Inspection KENNETH NAGLE