535 N LATIMER ROAD 90402
Certificate Information: 535 N LATIMER ROAD 90402
- Application / Permit
- 23016-90000-37418
- Plan Check / Job No.
- --
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- Replace 22 window(s) Same size, location, number, type. Interior kitchen remodel/repair (no changes in walls or openings). 4 bathroom(s).Bathroom remodel for residential buildings (no structural changes).. Replace damaged wood framing (less than 10%). Same size, spacing, type.
- Permit Issued
- Issued on 10/24/2023
- Issuing Office
- Current Status
- Permit Finaled on 2/26/2025
Permit Application Status History
| Issued | 10/24/2023 | INTERNET PERMIT |
| Permit Finaled | 2/25/2025 | JESUS RODRIGUEZ |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Mc Callister Construction Inc; Lic. No.: 427322-B | 759 HAVERFORD AVE PACIFIC PALISADES, CA 90272 |
Inspector Information
| HERBERT GIRON, (310) 914-3891 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Sewer | 3/27/2024 | Approved | ARAM AVEDISIAN |
| PLUMBING-Rough | 4/10/2024 | Partial Approval | ARAM AVEDISIAN |
| ELECTRICAL-Rough | 5/21/2024 | Corrections Issued | ARAM AVEDISIAN |
| ELECTRICAL-Rough | 5/29/2024 | Approved | TEMISTOCLES CAAL |
| Interior/Exterior Lathing | 5/29/2024 | Partial Approval | TEMISTOCLES CAAL |
| PLUMBING-Rough | 5/29/2024 | Approved | TEMISTOCLES CAAL |
| BUILDING-Rough-Frame | 6/21/2024 | Approved | ARAM AVEDISIAN |
| Insulation | 6/21/2024 | Approved | ARAM AVEDISIAN |
| Drywall Nailing | 6/28/2024 | Approved | ARAM AVEDISIAN |
| Shower Pan | 7/10/2024 | Approved | KENNETH NAGLE |
| Interior/Exterior Lathing | 8/20/2024 | Approved | DANIEL VERA |
| Gas Test | 12/6/2024 | Approved | EVAN COOPER |
| ELECTRICAL-Final | 1/7/2025 | Corrections Issued | JESUS RODRIGUEZ |
| HVAC-Final | 1/7/2025 | Corrections Issued | JESUS RODRIGUEZ |
| ELECTRICAL-Final | 2/10/2025 | Corrections Issued | MICHAEL ALLEN |
| HVAC-Final | 2/10/2025 | Partial Approval | MICHAEL ALLEN |
| PLUMBING-Final | 2/10/2025 | Approved | MICHAEL ALLEN |
| SGSOV-Seismic Gas S/O Valve | 2/10/2025 | SGSOV Not Ready | MICHAEL ALLEN |
| ELECTRICAL-Final | 2/25/2025 | Approved | JESUS RODRIGUEZ |
| Final | 2/25/2025 | Permit Finaled | JESUS RODRIGUEZ |
| HVAC-Final | 2/25/2025 | Approved | JESUS RODRIGUEZ |
| SGSOV-Seismic Gas S/O Valve | 2/25/2025 | SGSOV Approved | JESUS RODRIGUEZ |
| Smoke Detectors | 2/25/2025 | Approved | JESUS RODRIGUEZ |