159 S BELOIT AVE 90049
Certificate Information: 159 S BELOIT AVE 90049
- Application / Permit
- 23016-90000-03527
- Plan Check / Job No.
- --
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 21 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0(b)2B. 21 window(s). Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2(b)1B. Wood siding over solid sheathing with an approved water-resistive barrier per valid ICC Evaluation Report # ESR-2290 on exterior walls at 5 feet or more from property lines for residential buildings. (Applicant to provide a copy of the report to inspector).
- Permit Issued
- Issued on 2/9/2023
- Issuing Office
- Current Status
- Issued on 2/9/2023
Permit Application Status History
| Issued | 2/9/2023 | INTERNET PERMIT |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Sustainable Home Construction; Lic. No.: 1041527-B | 8504 FIRESTONE BLVD #407 DOWNEY, CA 90241 |
Inspector Information
| EVAN COOPER, (310) 914-3861 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Special/Order Compliance | 2/16/2023 | Approved | CARLOS MATAMOROS |
| Floor/Roof Diaphrgm/Shear Wall | 2/18/2023 | Approved | CHRISTOPHER WILSON |
| Insulation | 2/18/2023 | Not Ready for Inspection | CHRISTOPHER WILSON |
| Pre-Inspection | 2/18/2023 | Approved | CHRISTOPHER WILSON |
| Insulation | 2/21/2023 | Approved | MICHAEL PELHAM |
| Final | 3/1/2023 | Not Ready for Inspection | CARLOS MATAMOROS |
| Interior/Exterior Lathing | 3/1/2023 | Corrections Issued | CARLOS MATAMOROS |
| Final | 3/7/2023 | Partial Approval | CARLOS MATAMOROS |
| Interior/Exterior Lathing | 3/7/2023 | Approved | CARLOS MATAMOROS |
| Final | 5/9/2023 | Partial Approval | CARLOS MATAMOROS |
| Final | 5/15/2023 | Not Ready for Inspection | CARLOS MATAMOROS |
| Final | 6/6/2023 | Not Ready for Inspection | CARLOS MATAMOROS |