140 E 47TH PL 90011

Certificate Information: 140 E 47TH PL 90011

Application / Permit
23016-30000-29554
Plan Check / Job No.
X23WL03942
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(2) Duplex
Work Description
RE-ROOF WITH CLASS A OR B MATERIAL WEIGHING LESS THAN 6 POUNDS PER SQ. FT. OVER EXISTING SOLID SHEATHING (24) SQUARES.CLASS A ROOF COVERING IS REQUIRED WITHIN VERY HIGH FIRE HAZARD SEVERITY ZONE (VHFHSZ). FOR RESIDENTIAL ROOF REPLACEMENT > 50% OF THE TOTAL ROOF AREA, APPLY COOL ROOF PRODUCT LABELED AND CERTIFIED BY COOL ROOF RATING COUNCIL (CRRC). COOL ROOF MAY BE REQUIRED FOR NON-RESIDENTIAL BUILDINGS PER TITLE 24, PART 6, SECTION 141.0(b)1B. (8) SQUARES (Garage) (1) KITCHEN AND (1) BATHROOM REMODEL COMBINED WITH ELECTRICAL, PLUMBING, AND HVAC FOR RESIDENTIAL BUILDINGS (NO STRUCTURAL CHANGES). (13)WINDOW and (13) DOOR CHANGE-OUT (SAME SIZE & TYPE) FOR RESIDENTIAL BUILDINGS.
Permit Issued
Issued on 8/31/2023
Issuing Office
Current Status
Permit Finaled on 6/28/2024

Permit Application Status History

Issued 8/31/2023 APPLICANT
Permit Finaled 6/27/2024 ALEJANDRO DE ARTOLA

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Belcrest Siding Specialist Corp; Lic. No.: 1025107-B 14841 BROADMOOR STREET      PANORAMA CITY, CA 94102

Inspector Information

ALEJANDRO DE ARTOLA, (213) 202-3128 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

ELECTRICAL-Rough 10/25/2023 Approved ENRIQUE MIRELES
PLUMBING-Rough 10/25/2023 Approved ENRIQUE MIRELES
Shower Pan 10/25/2023 Approved ENRIQUE MIRELES
Insulation 10/28/2023 Approved MORRIS JACKSON
Shower Pan 10/28/2023 Approved MORRIS JACKSON
Drywall Nailing 11/3/2023 Corrections Issued ALEJANDRO DE ARTOLA
Interior/Exterior Lathing 11/3/2023 Partial Approval ALEJANDRO DE ARTOLA
Drywall Nailing 11/7/2023 Approved ENRIQUE MIRELES
ELECTRICAL-Final 5/16/2024 Corrections Issued ALEJANDRO DE ARTOLA
Final 5/16/2024 Corrections Issued ALEJANDRO DE ARTOLA
Gas Test 5/16/2024 Approved ALEJANDRO DE ARTOLA
HVAC-Final 5/16/2024 Corrections Issued ALEJANDRO DE ARTOLA
PLUMBING-Final 5/16/2024 Approved ALEJANDRO DE ARTOLA
SGSOV-Seismic Gas S/O Valve 5/16/2024 SGSOV Not Ready ALEJANDRO DE ARTOLA
Smoke Detectors 5/16/2024 Corrections Issued ALEJANDRO DE ARTOLA
ELECTRICAL-Final 5/20/2024 Corrections Issued ALEJANDRO DE ARTOLA
HVAC-Final 5/20/2024 Corrections Issued ALEJANDRO DE ARTOLA
ELECTRICAL-Final 6/24/2024 Corrections Issued ALEJANDRO DE ARTOLA
Final 6/24/2024 Corrections Issued ALEJANDRO DE ARTOLA
HVAC-Final 6/24/2024 Approved ALEJANDRO DE ARTOLA
SGSOV-Seismic Gas S/O Valve 6/24/2024 SGSOV Approved ALEJANDRO DE ARTOLA
Smoke Detectors 6/24/2024 Corrections Issued ALEJANDRO DE ARTOLA
ELECTRICAL-Final 6/27/2024 Approved ALEJANDRO DE ARTOLA
Final 6/27/2024 Permit Finaled ALEJANDRO DE ARTOLA
Service/Power Release 6/27/2024 Approved ALEJANDRO DE ARTOLA
Smoke Detectors 6/27/2024 Approved ALEJANDRO DE ARTOLA