16721 W MONTE ALTO PL 90272

Certificate Information: 16721 W MONTE ALTO PL 90272

Application / Permit
23016-30000-21763
Plan Check / Job No.
X23WL02841
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
46--WINDOW and 27--DOOR change-out (same size & type) for residential buildings. Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2(b) 1B of Title 24. KITCHEN and 5--BATHROOM remodel for residential buildings (no structural changes combined HVAC) Re-stucco for single family dwellings and duplexes only.(apt/condo/townhouses also)(Single Inspection) Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over EXISTING solid sheathing _20_Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 149(b). Replace drywall (no new walls added) for single family dwellings and duplexes only. INSTALL RADIANT BARRIER AND/OR INSULATION IN ATTIC FOR RESIDENTIAL BUIDLINGS. . (Two Inspections)
Permit Issued
Issued on 8/2/2023
Issuing Office
Current Status
Issued on 8/2/2023

Permit Application Status History

No Progress 7/3/2023 GINA DELGADO
Issued 8/2/2023 APPLICANT

Permit Application Clearance Information

Coastal Zone Cleared 7/12/2023 SPENCER WEJROWSKI

Contact Information

Contractor Jkb Construction Management And Development Inc; Lic. No.: 541211-B 3121 STANFORD AVE      MARINA DEL REY, CA 90292

Inspector Information

MICHAEL ALLEN, (310) 914-3886 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Floor/Roof Diaphrgm/Shear Wall 6/6/2024 Partial Approval EVAN COOPER
Interior/Exterior Lathing 7/3/2024 Partial Approval EVAN COOPER
ELECTRICAL-Rough 10/9/2024 Partial Approval EVAN COOPER
HVAC-Rough 10/9/2024 Partial Approval EVAN COOPER
PLUMBING-Rough 10/9/2024 Partial Approval EVAN COOPER
Insulation 10/28/2024 Partial Approval EVAN COOPER
Drywall Nailing 12/5/2024 No Access for Inspection EVAN COOPER
ELECTRICAL-Rough 12/5/2024 No Access for Inspection EVAN COOPER
HVAC-Rough 12/5/2024 No Access for Inspection EVAN COOPER
PLUMBING-Rough 12/5/2024 No Access for Inspection EVAN COOPER
Drywall Nailing 12/6/2024 Partial Approval EVAN COOPER
ELECTRICAL-Rough 12/6/2024 Approved EVAN COOPER
HVAC-Rough 12/6/2024 Approved EVAN COOPER
PLUMBING-Rough 12/6/2024 Approved EVAN COOPER
Insulation 12/13/2024 Approved EVAN COOPER
Drywall Nailing 10/22/2025 Approved KENNETH NAGLE
Interior/Exterior Lathing 10/22/2025 Partial Approval KENNETH NAGLE
Shower Pan 10/22/2025 Approved KENNETH NAGLE