7-7 1/2 N LATIMER ROAD 90402

Certificate Information: 7-7 1/2 N LATIMER ROAD 90402

Application / Permit
23016-30000-07250
Plan Check / Job No.
B23WL00648
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
interior and exterior structural remodel of (e) SFD per eng calcs. Convert attached rec room to ADU per LAMC 12.22A33(c) & (e), also remodel a bathroom in (E) SFD.
Permit Issued
Issued on 5/10/2023
Issuing Office
West Los Angeles
Current Status
CofO Issued on 7/20/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 3/13/2023 APPLICANT
Assigned to Plan Check Engineer 3/18/2023 JOHNPAUL ISIP
Corrections Issued 3/20/2023 JOHNPAUL ISIP
Building Plans Picked Up 3/28/2023 APPLICANT
Plan Check Approved 5/10/2023 AMY GUEVARRA
Issued 5/10/2023 APPLICANT
CofO in Progress 7/11/2024 ARAM AVEDISIAN
Permit Finaled 7/20/2024 DANIEL ORRANTE
CofO Issued 7/20/2024 DANIEL ORRANTE
Permit Finaled 7/20/2024 DANIEL ORRANTE

Permit Application Clearance Information

Grading Pre-Inspection Cleared 3/14/2023 VASIL MIHALEV

Contact Information

Architect Marmol,, Leonardo Emilio; Lic. No.: C22376 MARMOL & RADZINER & ASSOCIATES   12210 NEBRASKA AVE    LOS ANGELES, CA 90025
Contractor Marmol Radziner An Architectural Corporation; Lic. No.: 734381-B 12210 NEBRASKA AVENUE      LOS ANGELES, CA 90025
Engineer Fischer,, Kurt; Lic. No.: S5432 PO BOX 809      POWAY, CA 92074

Inspector Information

HERBERT GIRON, (310) 914-3891 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 7/10/2023 No Access for Inspection OGANES TARAKHCHYAN
Pre-Inspection 7/11/2023 Partial Approval OGANES TARAKHCHYAN
Pre-Inspection 7/12/2023 Not Ready for Inspection OGANES TARAKHCHYAN
Excavation/Setback/Form/Re-Bar 9/8/2023 Partial Approval OGANES TARAKHCHYAN
PLUMBING-Rough 9/11/2023 Partial Approval OGANES TARAKHCHYAN
Footing/Foundation/Slab 9/12/2023 Partial Approval OGANES TARAKHCHYAN
Excavation/Setback/Form/Re-Bar 9/13/2023 Not Ready for Inspection OGANES TARAKHCHYAN
Deputy Wood Construction 10/19/2023 Partial Approval OGANES TARAKHCHYAN
Pre-Inspection 12/6/2023 Partial Inspection ARAM AVEDISIAN
ELECTRICAL-Rough 12/8/2023 Approved ARAM AVEDISIAN
HVAC-Rough 12/8/2023 Approved ARAM AVEDISIAN
PLUMBING-Rough 12/19/2023 Partial Approval ARAM AVEDISIAN
PLUMBING-Rough 12/21/2023 Partial Approval ARAM AVEDISIAN
PLUMBING-Rough 12/26/2023 Partial Inspection KEVIN SARGSYAN
Drywall Nailing 1/19/2024 Not Ready for Inspection HERBERT GIRON
Floor/Roof Diaphrgm/Shear Wall 1/19/2024 Not Ready for Inspection HERBERT GIRON
Insulation 1/19/2024 Not Ready for Inspection HERBERT GIRON
BUILDING-Rough-Frame 1/24/2024 Approved ARAM AVEDISIAN
Floor/Roof Diaphrgm/Shear Wall 1/24/2024 Approved ARAM AVEDISIAN
Insulation 1/24/2024 Approved ARAM AVEDISIAN
Drywall Nailing 1/25/2024 Approved ARAM AVEDISIAN
Shower Pan 3/4/2024 Corrections Issued ARAM AVEDISIAN
Interior/Exterior Lathing 3/21/2024 Partial Approval ARAM AVEDISIAN
Shower Pan 3/21/2024 Approved ARAM AVEDISIAN
Pre-Inspection 5/30/2024 Partial Inspection ARAM AVEDISIAN
Smoke Detectors 5/30/2024 Approved ARAM AVEDISIAN
ELECTRICAL-Final 6/7/2024 Corrections Issued ARAM AVEDISIAN
ELECTRICAL-Final 6/14/2024 Approved ARAM AVEDISIAN
Gas Test 6/14/2024 Approved ARAM AVEDISIAN
HVAC-Final 6/14/2024 Approved ARAM AVEDISIAN
Final 6/18/2024 Corrections Issued ARAM AVEDISIAN
SGSOV-Seismic Gas S/O Valve 6/18/2024 SGSOV Approved ARAM AVEDISIAN
Final 7/11/2024 OK to Issue CofO ARAM AVEDISIAN
PLUMBING-Final 7/11/2024 Approved ARAM AVEDISIAN