4259 N RHODES AVE 91604

Certificate Information: 4259 N RHODES AVE 91604

Application / Permit
23016-20000-44492
Plan Check / Job No.
X23VN12205
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Kitchen/bathroom (2) remodel for residential buildings (no structural changes). Fiber Cement siding over solid sheathing with an approved water-resistive barrier, per valid ICC Evaluation Report ESR 2290 on exterior walls at 5 feet or more from property lines for residential buildings. (Applicant to provide a copy of the report to inspector).Window (15) change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2(b) 1B of Title 24.
Permit Issued
Issued on 12/19/2023
Issuing Office
Valley
Current Status
Issued on 12/19/2023

Permit Application Status History

Issued 12/19/2023 APPLICANT

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Owner-Builder       ,

Inspector Information

CHRISTOPHE COCHRAN, (818) 374-1165 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

ELECTRICAL-Rough 1/10/2024 Corrections Issued CHRISTOPHE COCHRAN
Interior/Exterior Lathing 1/10/2024 Not Ready for Inspection CHRISTOPHE COCHRAN
PLUMBING-Rough 1/10/2024 Corrections Issued CHRISTOPHE COCHRAN
Interior/Exterior Lathing 1/22/2024 Not Ready for Inspection CHRISTOPHE COCHRAN
Rough-Elec/Plmb/HVAC 1/22/2024 Corrections Issued CHRISTOPHE COCHRAN
Shower Pan 1/22/2024 Corrections Issued CHRISTOPHE COCHRAN
ELECTRICAL-Rough 1/24/2024 Approved CHRISTOPHE COCHRAN
Interior/Exterior Lathing 1/24/2024 Not Ready for Inspection CHRISTOPHE COCHRAN
PLUMBING-Rough 1/24/2024 Approved CHRISTOPHE COCHRAN
Shower Pan 1/24/2024 Corrections Issued CHRISTOPHE COCHRAN
Shower Pan 2/1/2024 Approved CHRISTOPHE COCHRAN
Wood Frame 2/1/2024 Corrections Issued CHRISTOPHE COCHRAN
BUILDING-Rough-Frame 3/5/2024 Partial Approval SALVADOR MARTINEZ
BUILDING-Rough-Frame 5/1/2024 Approved CHRISTOPHE COCHRAN
Interior/Exterior Lathing 5/21/2024 Approved CHRISTOPHE COCHRAN
Wood Frame 8/5/2024 Not Ready for Inspection CHRISTOPHE COCHRAN
Footing/Foundation/Slab 7/21/2025 Approved CHRISTOPHE COCHRAN
ELECTRICAL-Rough 7/31/2025 Not Ready for Inspection CHRISTOPHE COCHRAN